Bukit Panjang LRT

From SgWiki
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

1

Bukit Panjang LRT
武吉班让轻轨
புக்கிட் பாஞ்சாங் லைட் ரெயில்
C801 112 x C801A.jpg
Statistics
Status Operational
Termini Choa Chu Kang
Ten Mile Junction
Stations 13
Services 2
Operator(s) SMRT Trains
Rolling stock C801,C801A
Line length 7.6 km
Electrification Third rail

Bukit Panjang LRT (BPLRT) is the first Light Rail Transit (LRT) line. Traveling one loop takes about 30 minutes. The line is currently 7.6 km long with 13 stations and it is fully automated. The project was contracted to Adtranz, Keppel Corporation and Gammon Construction.

Formally at 7.8km with 14 station, with the closure of Ten Mile Junction station, the line will undergo overhaul and upgrading works.

History

Date Event
6 November 1999 Choa Chu Kang - Ten Mile Junction
10 December 2010 Temporary closure of Ten Mile Junction station due to redevelopment of Ten Mile Junction Shopping Mall.
Service C withdrawn.
30 December 2011 Ten Mile Junction station reopened after Junction 10 Shopping Mall reopened.
Service C resumed operation.
13 January 2019 Closure of Ten Mile Junction station.
Service C withdrawn.
1 December 2019 Operation convert to uni-direction (Service B) except during Weekday Peak Hours.

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:LRTFFF.png Bukit Panjang LRT
2
Choa Chu Kang Choa Chu Kang-BPLRT.png Choa Chu Kang Terminus
Interchange with North–South Line
1
South View South View-BPLRT.png South View
1
Keat Hong Keat Hong-BPLRT.png Keat Hong
1
Teck Whye Teck Whye
1
Phoenix Phoenix
2
Bukit Panjang Bukit Panjang-BPLRT.png Bukit Panjang Interchange with Downtown Line
1
Petir Petir-BPLRT.png Petir
1
Pending Pending
1
Bangkit Bangkit
1
Fajar Fajar
1
Segar Segar
1
Jelapang Jelapang
1
Senja Senja
Former Stations
1
Ten Mile Junction Ten Mile Junction-BPLRT.png Ten Mile Junction Closed

Services

Service Route Notes
A Choa Chu KangSenjaPetirChoa Chu Kang
B Choa Chu KangPetirSenjaChoa Chu Kang
C Ten Mile JunctionSenjaPetirTen Mile Junction Former Service

Rolling stock

The rolling stock consists of Bombardier INNOVIA C801 and Bombardier INNOVIA C801A trains. These trains operate from Ten Mile Junction Depot near Bukit Panjang station. The Ten Mile Junction Depot has maintenance and train overhaul facilities for trains along the Bukit Panjang LRT Line.

References


icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock 801801A801B
Depots Ten Mile Junction
Others Bridging Service