Kawasaki Heavy Industries & CSR Qingdao Sifang 151B
Kawasaki Heavy Industries & CSR Qingdao Sifang C151B center-left center-right *Graphic From SGTrains/Wikipedia/LTA | |
In service | 2017 - Present |
---|---|
Manufacturer | Kawasaki Heavy Industries CSR Qingdao Sifang |
Origin | Qingdao, China |
Constructed | 2014 - 2018 |
Number Built | 270 cars (45 Trains) |
Statistics | |
Body Construction | Aluminium-alloy double-skinned construction |
Length | 23.83 m (DT) 22.8 m (M1/M2) |
Width | 3.2 m |
Height | 3.7 m |
Doors | 1.45 m, 8 per car |
Maximum Speed | Design: 90 km/h Service: 80 km/h |
Traction Control | Fuji Electric IGBT-VVVF |
Line Voltage | 750V DC Third Rail |
Track Gauge | 1435 mm Standard Gauge |
Kawasaki Heavy Industries & CSR Qingdao Sifang C151B are the fifth generation of trains running on the North–South Line and the East–West Line.
History
In the turnkey Contract C151B, 3 tenderers were shortlisted – Kawasaki Heavy Industries, Siemens/CSR Zhuzhou, Zhuzhou Electric Locomotive Co., Ltd, CSR Zhuzhou and Construcciones y Auxiliar de Ferrocarriles.[1] On 23 August 2012, the Land Transport Authority (LTA) awarded the tender to Kawasaki Heavy Industries at a price of S$281,508,884.00.
Kawasaki will be responsible for the overall project management, design, manufacturing of bogies and procurement of major components. CSR Qingdao Sifang will be in charge of manufacturing, final fitting and assembly of complete MRT trains and factory testing. Kawasaki (Singapore) will be responsible for the delivery of complete MRT trains to the depot, on-site testing and commissioning. The new MRT trains are scheduled to be delivered to Singapore from 2015 onwards.[2]
Design/Features
Initial | |
---|---|
DT M1 M2 M2 M1 DT
| |
Exterior Design | |
Livery | SMRT Pixel Livery (White with Yellow, Red, Black stripes) |
Train Run Number | Yellow LED |
Interior Design | |
Seating Capacity | 292 |
Wheelchair Bay | 2, 1 each at Third and Fourth Car |
Door Closing Indicator Lights | 1 Red LED Bar (Top) |
Passenger Information System | SMRT Active Route-map and Information System (LCD Screen + VFD display) |
System | |
Safety System | ATC, ATO, ATP, ATS |
Signalling System | Communication Based Train Control |
Traction Motor | IGBT-VVVF (Fuji Electric) |
Trainset numbers
The car numbers of the trains range from x601 to x690, where x depends on the carriage type.
- The first digit identifies the position of the car from the closest end of the train; where ‘3’ represents first car, ‘1’ represents second car and ‘2’ represents third car.
- (Example) Passenger Vehicle 689/690 would consist of 6 cars with serial number 3689, 1689, 2689, 2690, 1690 and 3690 respectively.
- Depending on the direction of travel, the sequence may be reversed.
References
- ↑ "Singapore LTA orders metro rolling stock". Railway Gazette. Retrieved 9 Nov 2013.
- ↑ "LTA Singapore Orders 132 MRT Cars". Kawasaki.
Mass Rapid Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line
FutureJurong Region Line • Cross Island Line | |
Rolling Stocks | 151 • 151A • 151B • 151C • R151 • T251 • 751A • 751B • 751C • 830 • 830C • 851E • 951
Former651 Future J151 • CR151 | |
Depots | Bishan • Changi • Gali Batu • Kim Chuan • Mandai • Sengkang • Ulu Pandan • Tuas | |
Future Changi East • East Coast • Tengah |