Bus Service 11

From SgWiki
Revision as of 13:33, 17 December 2024 by 8549H (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SBS Transit SMRT Trains Tower Transit Go-Ahead

SMRT Buses
  • From 22 December 2024, bus service 193 will serve an additional bus stop along Benoi Road, opposite Joo Koon Interchange. Please refer here for more information.

SBS Transit Go-Ahead
  • From Thursday, 2 January 2025, City Direct Services 675, 676, 677 & 678 will be introduced to provide a faster connection to the city for commuters along the North-East Corridor. Please refer here for more information.

SMRT Buses
  • From Sunday, 12 January 2025, bus service 967 will be introduced to enhance connectivity for commuters in Marsiling and Admiralty to nearby transport nodes and local amenities in Woodlands. Please refer here for more information.

SMRT Buses
  • From Monday, 13 January 2025, bus service 912M will be withdrawn with the introduction of new bus service 967 under the Land Transport Authority’s Bus Connectivity Enhancement Programme (BCEP). Please refer here for more information.

Service 11
SBS8677X 11.jpeg
Route Information
Route Lorong 1 Geylang Terminal ↺ Rhu Cross (Loop)
Route Length 10.8 km
Travelling Time 33 - 45 mins
Operator SBS Transit
(Serangoon – Eunos Bus Package)

Bus Service 11 is a trunk service from Lorong 1 Geylang and looping at Rhu Cross, via Stadium Cres / Drive.

It was introduced in 1990 to provide bus connections between Kallang MRT Station and Kallang Park. The area around Kallang Park was later developed with the completion of Singapore Indoor Stadium and Kallang Leisure Park.

The route was extended to serve Tanjong Rhu under the Bus Service Enhancement Programme (BSEP) in June 2014.

Service 11 uses coloured information plates.

11
(towards Rhu Cross)
11
(towards Lorong 1 Geylang Terminal)

Service Information[edit]

Bus Duty & Fleet[edit]

Service 11
Depot Fleet Size Fleet
Hougang Depot (HGDEP) 4 4 Single Deckers

SBS6828R
Mercedes-Benz O530 Citaro

SBS8236K SBS8426D SBS8677X
Scania K230UB

Notes
  • This service is extended under Land Transport Authority (LTA)'s Bus Service Enhancement Programme (BSEP).
  • Weekdays: 3A-3P / 1S (4 buses)
  • Weekends & Public Holidays: 2A-3P / 1S / 1T (4 buses)
Service 11 duty allocation
Weekdays
(3A-3P / 1S)
1A/4P 2A/5P 3A/6P 7S
SBS8236K SBS8677X SBS6828R SBS8426D
Weekends & Public Holidays
(2A-3P / 1S / 1T)
1A/3P 2A/4P 6S 7T/5P
SBS8236K SBS8677X SBS6828R SBS8426D

Route Information[edit]

Frequency[edit]

Period AM Peak
(First Bus - 08:30)
AM Off Peak
(08:31 - 16:59)
PM Peak
(17:00 - 19:00)
PM Off Peak
(19:01 - Last Bus)
Loop Service 15 - 18 minutes 15 - 19 minutes 15 - 20 minutes 15 - 23 minutes

Special Departures[edit]

  • Opp Costa Rhu Condo icon90079
    Rhu Cross
    Lor 1 Geylang Ter icon80009
    Lor 1 Geylang
    • Daily: 06:00 (SBS8236K - Duty 1A) & 06:17 (SBS8677X - Duty 2A)

Loop Service[edit]

[Show/Hide Full Route Details]

Bus Stops Nearby Attraction Weekdays Saturdays Suns/PH
First bus Last bus First bus Last bus First bus Last bus
Lor 1 Geylang Ter icon80009
Lor 1 Geylang
EW10Kallang 06:00 23:30 06:00 23:30 06:00 23:30
Aft Lor 1 Geylang icon80051
Sims Ave
06:01 23:31 06:02 23:31 06:02 23:31
Aft Geylang Rd icon80119
Sims Way
06:04 23:34 06:04 23:34 06:04 23:34
S.A. Deaf icon80149
Mountbatten Rd
06:06 23:36 06:07 23:36 06:07 23:36
Opp Kallang Squash Ctr icon80189
Stadium Blvd
06:08 23:38 06:09 23:38 06:09 23:38
Opp CP F icon80179
Stadium Cres
06:12 23:41 06:13 23:42 06:13 23:42
Stadium Stn icon80199
Stadium Cres
*
11(towards Rhu Cross)
CC6Stadium 06:13 23:42 06:14 23:43 06:14 23:43
Opp S'pore Indoor Stadium icon80191
Stadium Wk
*
11(towards Rhu Cross)
06:13 23:42 06:14 23:43 06:14 23:43
Opp Camelot By-The-Water icon90039
Tg Rhu Rd
06:17 23:45 06:17 23:46 06:17 23:46
Tanjong Rhu Stn Exit 1 icon90049
Tg Rhu Rd
TE23Tanjong Rhu 06:18 23:46 06:18 23:47 06:18 23:47
Opp Pebble Bay icon90029
Tg Rhu Rd
06:19 23:47 06:19 23:48 06:19 23:48
Pk Shore Condo icon90019
Tg Rhu Rd
06:20 23:48 06:20 23:49 06:20 23:49
Opp Costa Rhu Condo icon90079
Rhu Cross
06:00 23:49 06:00 23:50 06:00 23:50
Bef Tg Rhu View icon90011
Tg Rhu Rd
06:01 23:50 06:01 23:51 06:01 23:51
Pebble Bay icon90021
Tg Rhu Rd
06:01 23:50 06:01 23:51 06:01 23:51
Tanjong Rhu Stn Exit 2 icon90041
Tg Rhu Rd
TE23Tanjong Rhu 06:02 23:51 06:02 23:52 06:02 23:52
Camelot By-The-Water icon90031
Tg Rhu Rd
06:03 23:52 06:03 23:52 06:03 23:52
Stadium Stn icon80199
Stadium Cres
*
11(towards Lorong 1 Geylang Terminal)
CC6Stadium 06:06 23:55 06:06 23:55 06:06 23:55
Opp S'pore Indoor Stadium icon80191
Stadium Wk
*
11(towards Lorong 1 Geylang Terminal)
06:06 23:55 06:06 23:55 06:06 23:55
CP F icon80171
Stadium Wk
06:07 23:56 06:07 23:56 06:07 23:56
Kallang Squash Ctr icon80181
Stadium Blvd
06:09 23:58 06:09 23:58 06:09 23:58
Opp S.A. Deaf icon80141
Mountbatten Rd
06:11 00:00 06:10 23:59 06:10 23:59
Bef Geylang Rd icon80111
Sims Way
06:13 00:02 06:12 00:01 06:12 00:01
Aft Sims Way icon80049
Geylang Rd
06:14 00:03 06:13 00:02 06:13 00:02
Lor 1 Geylang Ter icon80009
Lor 1 Geylang
EW10Kallang 06:15 00:04 06:15 00:03 06:15 00:03

* Do check the direction of the bus as both directions stop at this bus stop.

Historical Information[edit]

Operator Route Year Date Service changes
SBS Transit
(Current)
Known as SBS prior to 1 November 2001
Lor 1 Geylang ↺ Kallang Pk/Natl Stadium 1990 14 April Introduced between Lor 1 Geylang Ter and Stadium Blvd (Loop).
1994 12 June Amended to ply Stadium Rd before plying Stadium Blvd.
1999 TBC Last bus extended to 2330 hrs daily.
2002 8 February Amended to ply Stadium Wk with the partial closure of Stadium Blvd to facilitate the construction of CC6Stadium on the Circle Line.
2004 20 April Skips bus stop opposite Kallang Care Ctr along Mountbatten Rd.
2005 5 June Amended to ply Sims Ave and Sims Way with the partial closure of southbound Mountbatten Rd.
26 June Amended to ply Sims Way and Geylang Rd with the partial closure of northbound Mountbatten Rd.
2006 18 February Amended to ply Stadium Cres with the full closure of Stadium Blvd to facilitate the construction of CC6Stadium on the Circle Line.
2010 29 September Amended to ply Mountbatten Rd and Stadium Blvd with the closure of Stadium Rd to facilitate the construction of the Singapore Sports Hub.
Lor 1 Geylang ↺ Rhu Cross 2014 8 June Extended to loop at Rhu Cross under the LTA's Bus Service Enhancement Programme (BSEP).
First bus brought forward to 0600 hrs daily.
29 September Designated wheelchair-accessible bus service (WAB). WAB
2017 23 April Serves bus stops outside and opposite Singapore Indoor Stadium along Stadium Cres/Wk in both directions.
2024 28 April Serves new bus stops outside Tg Rhu Stn along Tg Rhu Rd.
icon Serangoon – Eunos Bus Package [ VTE]
SBS Transit
Services 11 • 22 • 53 • 53M • 55 • 58 • 59 • 60 • 63 • 63M • 64 • 90 • 94 • 101 • 103 • 105 • 109 • 134 • 137 • 140 • 141 • 146 • 150 • 154 • 158 • 506
Serangoon Feeders 315 • 317
Bus Fleet Hougang Depot (HGDEP)
Single Decker MAN NL323F (Euro VI) • Mercedes-Benz O530 Citaro (Batch 1Batch 2Batch 3) • Scania K230UB (Euro IV, Batch 1Euro IV, Batch 2Euro V, Batch 1Euro V, Batch 2)
Double Decker Alexander Dennis Enviro500 (3-Door) • MAN ND323F (Euro V, Batch 3Euro VI, Batch 1Euro VI, Batch 2) • Volvo B9TL (WEG2, Batch 1WEG2, Batch 2WEG2, Batch 3WEG2, Batch 4)
Tender Under Negotiation