Difference between revisions of "Punggol LRT"
Jump to navigation
Jump to search
m |
m |
||
(13 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Infobox/Line | {{Infobox/Line | ||
|TA=RPG | |||
|Line=PGLRT | |Line=PGLRT | ||
|Code={{Code| | |Code={{Code/S|PG|style={{CSS/PGLRT|s=}};font-size:18px;|h=27px|r=18px 27px}}<br> | ||
|Name=Punggol LRT<br>榜鹅轻轨<br>பொங்கோல் லைட் ரெயில் | |Name=Punggol LRT<br>榜鹅轻轨<br>பொங்கோல் லைட் ரெயில் | ||
|Info= | |Info= | ||
Line 9: | Line 10: | ||
{{Infoline|Services|4}} | {{Infoline|Services|4}} | ||
{{Infoline|Operator(s)|{{SBST}}}} | {{Infoline|Operator(s)|{{SBST}}}} | ||
{{Infoline|Rolling stock|[[Mitsubishi Heavy Industries | {{Infoline|Rolling stock|[[Mitsubishi Heavy Industries 810|810]], [[Mitsubishi Heavy Industries 810A|810A]]}} | ||
{{Infoline|Line length| | {{Infoline|Line length|9.6 km}} | ||
{{Infoline|Track gauge|1,850 mm broad gauge}} | {{Infoline|Track gauge|1,850 mm broad gauge}} | ||
{{Infoline|Electrification|750V DC Third rail}} | {{Infoline|Electrification|750V DC Third rail}} | ||
}} | }} | ||
'''Punggol LRT (PGLRT)''' is the third [[Light Rail Transit]] (LRT) line. Traveling one loop takes about 15 minutes. The line is currently | '''Punggol LRT (PGLRT)''' is the third [[Light Rail Transit]] (LRT) line. Traveling one loop takes about 15 minutes. The line is currently 9.6 km long with 15 stations including 1 not in operational and is fully automatically operated. | ||
==History== | ==History== | ||
{|class="wikitable mw-collapsible" style=" | {|class="wikitable mw-collapsible" style="width:50%" | ||
|- | |- | ||
!width=150|Date!!Event | !width=150|Date!!Event | ||
|- | |- | ||
|29 January 2005||{{Stn|Punggol}} - {{Stn|Cove}} - {{Stn|Kadaloor}} | |29 January 2005||{{Stn|Punggol}} - {{Stn|Cove}} - {{Stn|Kadaloor}} | ||
|- | |- | ||
|15 June 2007||{{Stn|Kadaloor}} - {{Stn|Oasis}} | |15 June 2007||{{Stn|Kadaloor}} - {{Stn|Oasis}} | ||
Line 30: | Line 31: | ||
|East Loop operated in both directions throughout the day | |East Loop operated in both directions throughout the day | ||
|- | |- | ||
|29 June 2014||{{Stn|Punggol}} - {{Stn|Soo Teck}} - {{Stn|Nibong}} | |29 June 2014||{{Stn|Punggol}} - {{Stn|Soo Teck}} - {{Stn|Nibong}} | ||
|- | |- | ||
|29 February 2016||{{Stn|Nibong}} - {{Stn|Sam Kee}} | |29 February 2016||{{Stn|Nibong}} - {{Stn|Sam Kee}} | ||
|- | |- | ||
|rowspan=2|29 December 2016||{{Stn|Punggol Point}} ( | |rowspan=2|29 December 2016||{{Stn|Punggol Point}} (Added on operational line) | ||
|- | |- | ||
|Two-car trains started operation | |Two-car trains started operation | ||
|- | |- | ||
|31 March 2017||{{Stn|Samudera}} ( | |31 March 2017||{{Stn|Samudera}} (Added on operational line) | ||
|- | |- | ||
|29 September 2018||West Loop operated in both directions throughout the day | |29 September 2018||West Loop operated in both directions throughout the day | ||
Line 44: | Line 45: | ||
==Stations== | ==Stations== | ||
{| class="wikitable" | <div style="overflow-y:auto;width=100%"> | ||
{| class="wikitable" style='white-space:nowrap;" | |||
!style=" | !style="{{CSS/LTA|s=|t=}}"|Alpha-Numeric<br>Code!!style="{{CSS/LTA|s=|t=}}"|Station Name!!style="{{CSS/LTA|s=|t=}}"|Image!!style="{{CSS/LTA|s=|t=}}"|Working names!!style="{{CSS/LTA|s=|t=}}"|Notes | ||
|- | |- | ||
!colspan=5 | !colspan=5 style="{{CSS/PGLRT|s=|t=}}"|{{Icon|LRT|W|18px|d=inline}} {{PGLRT|b=}} | ||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PTC|PGLRT|rr=0|br=none}}{{Code/S|NE17|NEL|r=0|br=none|bl=none}}{{Code/F|CP4|CRL|rl=0|bl=none}}|Punggol|PGLRT|Punggol|Terminus<br>Interchange with {{NEL}}<br>Future interchange with {{CRL}}}} | ||
|- | |- | ||
!colspan=5 | !colspan=5 style="{{CSS/PGLRT|s=|t=}}"|{{Icon|LRT|W|18px|d=inline}} {{PGLRT|b=}} (East Loop) | ||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PE1|PGLRT}}|Cove|PGLRT}} | ||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PE2|PGLRT}}|Meridian|PGLRT}} | ||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PE3|PGLRT}}|Coral Edge|PGLRT}} | ||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PE4|PGLRT}}{{Code/J|PGLRT|CRL|f=}}{{Code/F|CP3|CRL}}|Riviera|PGLRT|Riviera|Future interchange with {{CRL}}}} | ||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PE5|PGLRT}}|Kadaloor|PGLRT}} | ||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PE6|PGLRT}}|Oasis|PGLRT}} | ||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PE7|PGLRT}}|Damai|PGLRT}} | ||
|- | |- | ||
!colspan=5 | !colspan=5 style="{{CSS/PGLRT|s=|t=}}"|{{Icon|LRT|W|18px|d=inline}} {{PGLRT|b=}} (West Loop) | ||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PW1|PGLRT}}|Sam Kee|PGLRT}} | ||
{{Stnline|{{Code/F|PW2|PGLRT}}|Teck Lee|PGLRT|Note=To be opened in tandem with future developments.|Img=}} | |||
{{Stnline|{{Code/S|PW3|PGLRT}}|Punggol Point|PGLRT}} | |||
{{Stnline|{{Code/S|PW4|PGLRT}}|Samudera|PGLRT}} | |||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PW5|PGLRT}}|Nibong|PGLRT}} | ||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PW6|PGLRT}}|Sumang|PGLRT}} | ||
{{Stnline|{{Code| | {{Stnline|{{Code/S|PW7|PGLRT}}|Soo Teck|PGLRT}} | ||
{{Stnline|{{Code| | |||
{{Stnline|{{Code| | |||
|} | |} | ||
</div> | |||
==Services== | ==Services== | ||
{| class="toccolours" border=1 | {| class="toccolours" border=1 | ||
|- | |-style="{{CSS/PGLRT|s=|t=}}text-align:center;" | ||
!Service!!Route!!Notes | !Service!!Route!!Notes | ||
|- | |- | ||
|A||{{Stn|Punggol}} ► {{Stn| | |A||{{Stn|Punggol}} ► {{Stn|Soo Teck}} ► {{Stn|Sam Kee}} ► {{Stn|Punggol}}|| | ||
|- | |- | ||
|B||{{Stn|Punggol}} ► {{Stn| | |B||{{Stn|Punggol}} ► {{Stn|Sam Kee}} ► {{Stn|Soo Teck}} ► {{Stn|Punggol}}|| | ||
|- | |- | ||
|C||{{Stn|Punggol}} ► {{Stn| | |C||{{Stn|Punggol}} ► {{Stn|Damai}} ► {{Stn|Cove}} ► {{Stn|Punggol}}|| | ||
|- | |- | ||
|D||{{Stn|Punggol}} ► {{Stn| | |D||{{Stn|Punggol}} ► {{Stn|Cove}} ► {{Stn|Damai}} ► {{Stn|Punggol}}|| | ||
|} | |} | ||
==Rolling stock== | ==Rolling stock== | ||
The rolling stock consists of [[Mitsubishi Heavy Industries | The rolling stock consists of [[Mitsubishi Heavy Industries 810]] and [[Mitsubishi Heavy Industries 810A]] trains. These trains operate from [[Sengkang Depot]] near {{Stn|Tongkang| Station}}. | ||
==References== | ==References== | ||
Line 95: | Line 95: | ||
{{Railway Lines}} | {{Railway Lines}} | ||
{{Punggol LRT}} | {{Punggol LRT}} | ||
Latest revision as of 22:39, 5 March 2024
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
|
PG Punggol LRT 榜鹅轻轨 பொங்கோல் லைட் ரெயில் | |
Statistics | |
---|---|
Status | Operational |
Termini | Punggol |
Stations | 15 (1 Not in operation) |
Services | 4 |
Operator(s) | |
Rolling stock | 810, 810A |
Line length | 9.6 km |
Track gauge | 1,850 mm broad gauge |
Electrification | 750V DC Third rail |
Punggol LRT (PGLRT) is the third Light Rail Transit (LRT) line. Traveling one loop takes about 15 minutes. The line is currently 9.6 km long with 15 stations including 1 not in operational and is fully automatically operated.
History[edit]
Date | Event |
---|---|
29 January 2005 | Punggol - Cove - Kadaloor |
15 June 2007 | Kadaloor - Oasis |
20 June 2011 | Oasis - Damai |
East Loop operated in both directions throughout the day | |
29 June 2014 | Punggol - Soo Teck - Nibong |
29 February 2016 | Nibong - Sam Kee |
29 December 2016 | Punggol Point (Added on operational line) |
Two-car trains started operation | |
31 March 2017 | Samudera (Added on operational line) |
29 September 2018 | West Loop operated in both directions throughout the day |
Stations[edit]
Alpha-Numeric Code |
Station Name | Image | Working names | Notes |
---|---|---|---|---|
Punggol LRT | ||||
PTCNE17CP4 | Punggol | Punggol | Terminus Interchange with North East Line Future interchange with Cross Island Line | |
Punggol LRT (East Loop) | ||||
PE1 | Cove | Cove | ||
PE2 | Meridian | Meridian | ||
PE3 | Coral Edge | Coral Edge | ||
PE4CP3 | Riviera | Riviera | Future interchange with Cross Island Line | |
PE5 | Kadaloor | Kadaloor | ||
PE6 | Oasis | Oasis | ||
PE7 | Damai | Damai | ||
Punggol LRT (West Loop) | ||||
PW1 | Sam Kee | Sam Kee | ||
PW2 | Teck Lee | Teck Lee | To be opened in tandem with future developments. | |
PW3 | Punggol Point | Punggol Point | ||
PW4 | Samudera | Samudera | ||
PW5 | Nibong | Nibong | ||
PW6 | Sumang | Sumang | ||
PW7 | Soo Teck | Soo Teck |
Services[edit]
Service | Route | Notes |
---|---|---|
A | Punggol ► Soo Teck ► Sam Kee ► Punggol | |
B | Punggol ► Sam Kee ► Soo Teck ► Punggol | |
C | Punggol ► Damai ► Cove ► Punggol | |
D | Punggol ► Cove ► Damai ► Punggol |
Rolling stock[edit]
The rolling stock consists of Mitsubishi Heavy Industries 810 and Mitsubishi Heavy Industries 810A trains. These trains operate from Sengkang Depot near Tongkang Station.
References[edit]
Light Rail Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | Bukit Panjang LRT • Sengkang LRT • Punggol LRT | |
Rolling Stocks | 801 • 801A • 810 • 810A | |
Future801B • 810D | ||
Depots | Sengkang • Ten Mile Junction |
Railway Lines in Singapore | [ V • T • E ] | |
---|---|---|
Mass Rapid Transit (MRT) | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line | |
FutureJurong Region Line • Cross Island Line | ||
Light Rail Transit (LRT) | Bukit Panjang LRT • Sengkang LRT • Punggol LRT | |
Cross-border | KTM Intercity | |
FutureJohor Bahru–Singapore Rapid Transit System | ||
Others | Changi Airport Skytrain • Sentosa Express | |
DefunctSentosa Monorail |
Punggol LRT | [ V • T • E ] | |
---|---|---|
Stations | Punggol | |
East LoopCove • Meridian • Coral Edge • Riviera • Kadaloor • Oasis • Damai | ||
West LoopSam Kee • Teck Lee • Punggol Point • Samudera • Nibong • Sumang • Soo Teck | ||
Rolling Stock | 810 • 810A • 810D | |
Depots | Sengkang | |
Others | Punggol LRT Bridging Service |