Difference between revisions of "North–South Line Bridging Service"
Jump to navigation
Jump to search
Themystery (talk | contribs) |
Themystery (talk | contribs) |
||
Line 11: | Line 11: | ||
!Operator | !Operator | ||
|- | |- | ||
| | |{{NS1| |1}} – {{NS28| |1}} | ||
|{{SMRT Buses}} | |{{SMRT Buses}} | ||
|} | |} |
Revision as of 14:11, 30 May 2021
Notes
- This service will only ply at affected stations during rail disruption.
- This service may ply different route subject to traffic conditions.
- Distance below are based on rail distance in uni-direction.
Operator(s)
Sector | Operator |
---|---|
NS11Jurong East – NS281Marina South Pier | Template:SMRT Buses |
Jurong East to Marina South Pier[Show/Hide Route Details]
|
Marina South Pier to Jurong East[Show/Hide Route Details]
|