Difference between revisions of "Alstom Metropolis 751A"

From SgWiki
Jump to navigation Jump to search
m (Year according to builder plate)
m
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Infobox/Train
{{Infobox/Train
|Name=Alstom Metropolis C751A
|Name=Alstom Metropolis 751A
|Img=[[File:C751A-Ext.png|center-left|160px]] [[File:C751A-Int.png|center-right|160px]]
|Img=[[File:C751A-Ext(1).png|center-left|160px]] [[File:C751A-Int(1).png|center-right|160px]]<br>[[File:C751A-Ext(2).png|center-left|160px]] [[File:C751A-Int(2).png|center-right|160px]]
|Info1=
|Info1=
  {{Infoline|In service|2003 – Present}}
  {{Infoline|In service|2003 – Present}}
Line 7: Line 7:
  {{Infoline|Origin|Valenciennes, France}}
  {{Infoline|Origin|Valenciennes, France}}
  {{Infoline|Constructed|2000 – 2001}}
  {{Infoline|Constructed|2000 – 2001}}
  {{Infoline|Refurbishment|2019 onwards<br>CRRC Nanjing Puzhen}}
  {{Infoline|Refurbishment|2019 – Present<br>CRRC Nanjing Puzhen}}
  {{Infoline|Number Built|150 cars (25 Trains)}}
  {{Infoline|Number Built|150 cars (25 Trains)}}
|Info2=
|Info2=
Line 21: Line 21:
}}
}}


'''Alstom Metropolis C751A''' are the first generation of trains running on the {{NEL}}.
'''Alstom Metropolis 751A''' are the first generation of trains running on the {{NEL}}.


==History==
==History==
Line 27: Line 27:


===Refurbishment===
===Refurbishment===
On 17 December 2018, the Land Transport Authority had awarded the contract worth about $116.7 million to CRRC Nanjing Puzhen for the refurbishment of C751A.<ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=f901e290-ad09-4d05-9309-c974aa26c0ae "Enhancement works for the North East Line to commence in 2019"]. Land Transport Authority (17 December 2018). Retrieved 25 December 2018.</ref> LTA said the reasons for refurbishment were due to the aging of system and to prevent the incidents (2011 & 2015 MRT Disruption) from occurring again which causes great inconvenience to commuters. The whole refurbishment is expected to start in 2019 and end in 3rd quarter of 2024.
In December 2018, the Land Transport Authority (LTA) had awarded the contract worth about $116.7 million to CRRC Nanjing Puzhen for the refurbishment of 751A.<ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=f901e290-ad09-4d05-9309-c974aa26c0ae "Enhancement works for the North East Line to commence in 2019"]. Land Transport Authority (17 December 2018). Retrieved 25 December 2018.</ref> The trains' interior, such as seats, panels, and flooring, will be replaced whereas the air-conditioning & ventilation systems will be upgraded. The trains will also be retrofitted with new passenger information displays. The first refurbished train was completed in 2022 and works on the remaining trains are expected to be completed by 2024.


==Design/Features==
==Design/Features==
Line 34: Line 34:
!class="LTA"|
!class="LTA"|
!colspan=2|Initial
!colspan=2|Initial
!Refurbished
|-
|-
!
!
|colspan=2|<div class="train">{{TrainCar|DT|6964BE|left}} {{TrainCar|Mp|6964BE}} {{TrainCar|Mi|6964BE}} {{TrainCar|Mi|6964BE}} {{TrainCar|Mp|6964BE}} {{TrainCar|DT|6964BE|right}}</div>
|colspan=2|<div class="train">{{TrainCar|DT|6964BE|left}} {{TrainCar|Mp|6964BE}} {{TrainCar|Mi|6964BE}} {{TrainCar|Mi|6964BE}} {{TrainCar|Mp|6964BE}} {{TrainCar|DT|6964BE|right}}</div>
|colspan=2|<div class="train">{{TrainCar|DT|9B5992|left}} {{TrainCar|Mp|9B5992}} {{TrainCar|Mi|9B5992}} {{TrainCar|Mi|9B5992}} {{TrainCar|Mp|9B5992}} {{TrainCar|DT|9B5992|right}}</div>
|-style="background-color:#DDD"
|-style="background-color:#DDD"
!colspan=3|Exterior Design
!colspan=4|Exterior Design
|-
|-
!style="text-align:left"|Livery
!style="text-align:left"|Livery
|colspan=2|Black,Red,Purple,White (Top to bottom)
|colspan=3|Black,Red,Purple,White (Top to bottom)
|-
|-
!style="text-align:left"|Train Run Number
!style="text-align:left"|Train Run Number
|colspan=2|Orange LED
|colspan=3|Orange LED
|-style="background-color:#DDD"
|-style="background-color:#DDD"
!colspan=3|Interior Design
!colspan=4|Interior Design
|-
|-
!rowspan=2 style="text-align:left"|Seating Capacity
!rowspan=2 style="text-align:left"|Seating Capacity
!Original!!Bar Train
!Original!!Bar Train
|rowspan=2|240
|-
|-
|296||240
|296||240
|-
|-
!style="text-align:left"|Wheelchair Bay
!style="text-align:left"|Wheelchair Bay
|colspan=2|2, 1 each at Third and Fourth Car
|colspan=3|2, 1 each at Third and Fourth Car
|-
|-
!style="text-align:left"|Door Closing Indicator Lights
!style="text-align:left"|Door Closing Indicator Lights
|colspan=2|1 Yellow Alert Light (Top)
|colspan=3|1 Yellow Alert Light (Top)
|-
|-
!style="text-align:left"|Passenger Information System
!style="text-align:left"|Passenger Information System
|colspan=2|Visual Passenger Information System (LED display<span style='color:#888;'><s> + LCD screen</s></span>)
|colspan=2|Visual Passenger Information System (LED display<span style='color:#888;'><s> + LCD screen</s></span>)
|Visual Passenger Information System<br>Dynamic Route Map Display
|-style="background-color:#DDD"
|-style="background-color:#DDD"
!colspan=4|System
!colspan=4|System
|-
|-
!style="text-align:left"|Safety System
!style="text-align:left"|Safety System
|colspan=2|ATC, ATO, ATP, ATS
|colspan=3|ATC, ATO, ATP, ATS
|-
|-
!style="text-align:left"|Signalling System
!style="text-align:left"|Signalling System
|colspan=2|Communication Based Train Control
|colspan=3|Communication Based Train Control
|-
|-
!style="text-align:left"|Traction Control
!style="text-align:left"|Traction Control
|colspan=2|IGBT-VVVF (Alstom ONIX)
|colspan=3|IGBT-VVVF (Alstom ONIX)
|-
|}
|}



Latest revision as of 15:12, 17 June 2023

Alstom Metropolis 751A
center-left center-right
center-left center-right
*Graphic From SGTrains/Wikipedia/LTA
In service 2003 – Present
Manufacturer Alstom
Origin Valenciennes, France
Constructed 2000 – 2001
Refurbishment 2019 – Present
CRRC Nanjing Puzhen
Number Built 150 cars (25 Trains)
Statistics
Body Construction Welded aluminium
Length 23.65 m (DT)
22.8 (Mp/Mi)
Width 3.2 m
Height 3.7 m
Doors 1.45 m, 8 per car
Maximum Speed Design: 100 km/h
Service: 90 km/h
Traction Control IGBT-VVVF (Alstom ONIX)
Line Voltage 1500V DC Overhead Catenary
Track Gauge 1435 mm Standard Gauge

Alstom Metropolis 751A are the first generation of trains running on the North East Line.

History[edit]

The trains on the North East Line are powered by overhead catenary, a first in history. Rolling stock on all the other operating lines are powered by a third rail because the authorities considered overhead wires to be unsightly and did not allow for trains to be powered using this method on elevated lines. Since this line is the first to be fully underground, the authorities had a choice between powering the trains on this line by overhead catenary or third rail.[1].

Refurbishment[edit]

In December 2018, the Land Transport Authority (LTA) had awarded the contract worth about $116.7 million to CRRC Nanjing Puzhen for the refurbishment of 751A.[2] The trains' interior, such as seats, panels, and flooring, will be replaced whereas the air-conditioning & ventilation systems will be upgraded. The trains will also be retrofitted with new passenger information displays. The first refurbished train was completed in 2022 and works on the remaining trains are expected to be completed by 2024.

Design/Features[edit]

Initial Refurbished
DT Mp Mi Mi Mp DT
DT Mp Mi Mi Mp DT
Exterior Design
Livery Black,Red,Purple,White (Top to bottom)
Train Run Number Orange LED
Interior Design
Seating Capacity Original Bar Train 240
296 240
Wheelchair Bay 2, 1 each at Third and Fourth Car
Door Closing Indicator Lights 1 Yellow Alert Light (Top)
Passenger Information System Visual Passenger Information System (LED display + LCD screen) Visual Passenger Information System
Dynamic Route Map Display
System
Safety System ATC, ATO, ATP, ATS
Signalling System Communication Based Train Control
Traction Control IGBT-VVVF (Alstom ONIX)

Fleet Numbering[edit]

The car numbers of the trains range from 7x001 to 7x050, where x depends on the carriage type.

  • The second digit identifies the position of the car from the closest end of the train; where ‘1’ represents first car, ‘2’ represents second car and ‘3’ represents third car.
    • (Example) Passenger Vehicle 7049/7050 would consist of 6 cars with serial number 71049, 72049, 73049, 73050, 72050 and 71050 respectively.
  • Depending on the direction of travel, the sequence may be reversed.

References[edit]

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
icon North East Line [ VTE ]
Stations HarbourFrontOutram ParkChinatownClarke QuayDhoby GhautLittle IndiaFarrer ParkBoon KengPotong PasirWoodleighSerangoonKovanHougangBuangkokSengkangPunggol
North East Line extension: Punggol Coast
Rolling Stock 751A751C851E
Depots Sengkang
Others Bridging Service