Bishan Depot

From SgWiki
Revision as of 13:59, 30 September 2018 by Smrtrainlovur (talk | contribs)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Bishan Depot
碧山车厂
பீஷான் பணிமனை
Statistics
Address 300 Bishan Road
Singapore 579828
Line(s) North–South Line
Rolling Stock(s) C151
C651
C751B
C151A
C151B
C151C

Bishan Depot is the first train depot in Singapore. It maintains trains for the North–South Line.

The depot was completed in 1987 by American architect Vikas M. Gore and the 12,000 square metres maintenance area at cost of S$300 million.

SMRT Cram Jam!

On the 11 February 2007, SMRT Organized the SMRT Cram Jam! cum Learning Journey and Charity Bazaar to raise funds for the SMRT Silver Tribute Fund. The Cram Jam took place in the morning seeking an entry into the Singapore Book Of Records by cramming people inside a Kawasaki Heavy Industries C151 Car 2027, a Mercedes-Benz O405G (Hispano Habit) Bus, TIB1202K and a Ssangyong Rodius/Stavic MPV Cab. The Singapore Police Force crammed 550 officers inside the train car, 235 staff from SMRT crammed inside the bus and an amazing 44 Girl Guides Singapore Cadets crammed themselves into the cab. Games and Carnival Food were organized and a 90-minute tour around the Bishan Depot.

Incidents

A MRT train, C751B [311/312] has been vandalised in an apparent security breach at a depot. The train was then put into service before the vandalism was discovered.

LTA said that SMRT failed to detect, in a timely manner, the security breach at its Bishan depot and the graffiti on one of its MRT trains on 17 August 2011 and the transport company was fined for the security breach. [1]

In May 2014, a C151A was vandalised.

In November 2014, a C151 was vandalised.

Upgrading

On 7 March 2012, Minister for Transport, Mr Lui Tuck Yew, announced on Committee of Supply Debate 2012 in Parliament that upgrading of existing North South Line and East West Line depots to be started and completed by 2014. [2]

Reception Tracks

On the North South Line, it has 3 reception tracks, 2 that lead to Ang Mo Kio station and 1 lead to Bishan station.

References

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah

Template:North South Line Template:East West Line