Jurong East station

From SgWiki
Revision as of 05:55, 30 November 2017 by Supernutorcrazy (talk | contribs) (→‎Layout: Platform A/B opens at 6am instead of 7am)
Jump to navigation Jump to search
!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SBS Transit
  • From Sunday, 23 February 2025, Bus Services 4 & 5 will serve new bus stops along Flora Road. Please refer here for more information.

Tower Transit

Land Transport AuthoritySBS Transit
  • From Friday, 28 February 2025, 3pm, Hume station on the Downtown Line will open. Please refer here for more information.

Jurong East
裕廊东
ஜூரோங் கிழக்கு

2
Jurong East-NSL-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 10 Jurong East Street 12
Singapore 609690
Line(s) North–South Line
East–West Line
Connection Bus, Taxi
 

 

Jurong East (NS1/EW24) is an elevated Mass Rapid Transit (MRT) station on the North–South Line and the East–West Line, and serves as an interchange station between the two lines.

During peak periods, trains arrive directly from Ulu Pandan Depot to start service on both the North South Line and the East West Line. This station was also the first station to make announcements about train services when the Branch Extension opened in 1990.[1]

History

Date Event
5 November 1988 Station officially opens
10 March 1990 Station interchanges with North South Line (then East West Line Branch Extension)
18 December 2009 Half-Height Platform Screen Doors operates
27 May 2011 Jurong East Modification Project opens[2][3]
30 June 2012 High Volume, Low Speed Blade fans operates

Jurong East Modification Project

The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the North South Line to enter and depart the station at the same time. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allow for shorter train intervals, reducing waiting times and reducing the crowding in trains.[4]

Layout

L3 Platform A North–South Line
Template:Terminus
Platform A/B
Platform B/C East–West Line
Template:Terminus
Template:Terminus
Platform C/D
Platform D/E North–South Line
Template:Terminus
Platform E/F
Platform F East–West Line
Template:Terminus
L2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
L1 Street Level Jurong East Bus Interchange

Notes: Platform A and B will opens between 6am and 10am and 5pm and 8pm on Weekdays except PH.

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Jurong East Bus Interchange, Jurong Gateway Road, Jurong East Central, JCube mall
B Handicapped/disabled access Venture Avenue, Jurong Gateway Road
C Handicapped/disabled access JEM, Big Box
D Handicapped/disabled access Westgate

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Line Template:Rail Service Template:Rail Service |}

Bus

Bus Stop Exit Bus Service
28009 Jurong East Temp Int
41 49 51 52 66 78 79 97 97e 98 98M 105 143 143M 160 183 197 333 334 335 506
28061 Jurong East Stn/Int
49 98 98M 99 990
28069 Blk 203
49 99
28241 Opp Jurong East Lib
51 78 79 97 97e 143 143M 176 178 197 198 333
28249 Jurong East Lib
51 78 79 97 97e 143 143M 176 178 197 198 333
28201 Opp The JTC Summit
990

References

Template:Singapore MRT stations Template:North South Line Template:East West Line