Sengkang LRT

From SgWiki
Jump to navigation Jump to search
!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SBS Transit
  • From Saturday, 15 March 2025, supplementary bus service 138M will be introduced to better serve residents travelling to the Ang Mo Kio Polyclinic. This service will operate at a frequency of 30 minutes from Ang Mo Kio Bus Interchange. Please refer here for more information.

Tower Transit
  • From Saturday, 15 March 2025, bus service 883M will operate on Saturdays from 7am to 1pm at 30-minute frequency to enhance connectivity to amenities along Yishun Avenue 7. Please refer here for more information.

SBS Transit
  • From Monday, 17 March 2025, short-trip service 71A will be introduced from Mayflower MRT Station to Bishan MRT Station. Please refer here for more information.

SMRT Buses
  • From Sunday, 23 March 2025, supplementary bus service 258M will ply an extended route looping at Boon Lay Place to provide direct connection to amenities such as Boon Lay Shopping Centre. Please refer here for more information.

SMRT Buses
  • From Monday, 24 March 2025, supplementary bus service 979X will be introduced to provide a faster connection for residents in Yew Tee Village to and from Bukit Panjang MRT / Bus Interchange. Bus service 979X will supplement bus service 979 and serve selected bus stops along its route. It will operate on weekdays (excluding Public Holidays) during the morning and evening peak periods. Please refer here for more information.

Tower Transit
  • From Monday, 24 March 2025, supplementary bus service 861M will be introduced to complement existing travel options to Wellington Primary School. It will operate from Canberra Way, terminating at Sembawang Bus Interchange. This service will operate two trips during the morning peak period on weekdays during school term only. Please refer here for more information.

SBS Transit
  • From Monday, 24 March 2025, short-trip service 112B will be introduced starting from Hougang Central Bus Interchange and terminating at Hougang Avenue 7. This service will only operate on weekdays (excluding public holidays) during the evening peak period. Please refer here for more information.

SK
Sengkang LRT
盛港轻轨
செங்காங் லைட் ரெயில்
Train Line Information
Status Operational
Termini Sengkang
Stations 14
Services 4
Operator(s) SBS Transit
Rolling stock 810, 810A
Line length 10.6 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Sengkang LRT (SKLRT) is the second Light Rail Transit (LRT) line. The line is currently 10.6 km long with 14 stations and it is fully automated.

History

Date Event
18 January 2003 Sengkang, Compassvale - Ranggung
29 January 2005 Thanggam - Renjong
15 November 2007 Farmway
4 January 2010 West Loop operated in both direction during weekdays peak hours
1 January 2013 Cheng Lim
West Loop operated in both direction throughout the day
27 June 2015 Kupang
22 December 2015 Two-car trains started operation

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
icon Sengkang LRT
STCNE16 Sengkang Sengkang-SKLRT.png Sengkang Terminus
Interchange with North East Line
icon Sengkang LRT (East Loop)
SE1 Compassvale Compassvale-SKLRT.png Compassvale
SE2 Rumbia Rumbia-SKLRT.png Rumbia
SE3 Bakau Bakau-SKLRT.png Bakau
SE4 Kangkar Kangkar-SKLRT.png Kangkar
SE5 Ranggung Ranggung-SKLRT.png Ranggung
icon Sengkang LRT (West Loop)
SW1 Cheng Lim Cheng Lim-SKLRT.png Cheng Lim
SW2 Farmway Farmway-SKLRT.png Farmway
SW3 Kupang Kupang-SKLRT.png Kupang
SW4 Thanggam Thanggam-SKLRT.png Thanggam
SW5 Fernvale Fernvale-SKLRT.png Fernvale
SW6 Layar Layar-SKLRT.png Layar
SW7 Tongkang Tongkang-SKLRT.png Tongkang
SW8 Renjong Renjong-SKLRT.png Renjong

Services

Service Route Notes
A SengkangRenjongCheng LimSengkang
B SengkangCheng LimRenjongSengkang
C SengkangCompassvaleRanggungSengkang
D SengkangRanggungCompassvaleSengkang

Rolling stock

The rolling stock consists of Mitsubishi Heavy Industries 810 and Mitsubishi Heavy Industries 810A trains. These trains operate from Sengkang Depot near Tongkang Station.

References


icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail • Jurong Bird Park Panorail
icon Sengkang LRT [ VTE ]
Stations Sengkang
East LoopCompassvaleRumbiaBakauKangkarRanggung
West LoopCheng LimFarmwayKupangThanggamFernvaleLayarTongkangRenjong
Rolling Stock 810810A810D
Depots Sengkang
Others Bridging Service