Nicoll Highway station

From SgWiki
Jump to: navigation, search


!
COVID-19 ADVISORY
!
In light of the current COVID-19, sgWiki would like to remind all to:
  • Keep good personal hygiene
  • Remain at home at all times during "Circuit Breaker" measure (also known as lockdown) till Monday, 1 June 2020.
  • Wear a mask when not at home unless participating in high strenuous exercise.
  • Visit a clinic if you develop cough, flu and/or fever. Contact the clinic beforehand if you suspected yourself to be infected with the virus.
  • Defer all travel abroad. Singaporeans, Permanent Residents, Long Term Pass holders entering Singapore will be issued a 14-day Stay-Home Notice (SHN).
  • Short-Term visitors are not allowed to enter or transit in Singapore.
  • Observe the necessary Stay-Home Notice (SHN) or Quarantine Order (QO) protocols.
  • For more information, visit www.moh.gov.sg.

!
TRAVEL ADVISORY
!
sgWiki wishes all Muslim editors, Selamat Hari Raya Aidilfitri.
SBS Transit
  • From Tuesday, 2 June 2020, bus service 128 will be withdrawn. Please refer here for more information.

SBS Transit SMRT Buses
  • Due to Malaysia's Control Orders, bus services 160 and 170 will be amended indefinitely to loop Woodlands Centre Rd, skipping all bus stop in Malaysia. Please refer here for more information.
  • Due to Malaysia's Control Orders, bus services 170X and 950 will be suspended indefinitely. Please refer here (SBS Transit) and here (SMRT Buses) for more information.

Land Transport Authority SBS Transit SMRT Buses Tower Transit Go-Ahead:
  • Due to COVID-19 "Circuit Breaker" measures, all Express (with exception to bus service 89e), City Direct, Chinatown Direct, NightRider and Nite Owl bus services, as well as bus services 128, 401 and 926, will be suspended. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses:
  • Due to post COVID-19 "Circuit Breaker" measures, all Chinatown Direct, NightRider and Nite Owl bus services, as well as bus services 188R, 401, 926 and 963R, will be suspended. Please refer here for more information.

North South Line East West Line North East Line Circle Line Downtown Line Sengkang LRT Punggol LRT:
  • Due to COVID-19 "Circuit Breaker" measures, train services will end 30 minutes earlier and operate at a reduced frequency. Please refer here for more information.

Thomson–East Coast Line:
  • Due to COVID-19 "Circuit Breaker" measures, train services will start at 6.30am and end at 8pm. Please refer here for more information.

SMRT Thomson–East Coast Line

SMRT Thomson–East Coast Line
  • Due to system integrating test, train services between TE1 Woodlands North and TE3 Woodlands South stations will start at 6.30am and will end at 10pm. Please refer here for more information.

CC5
Nicoll Highway
尼诰大道
நிக்கல் நெடுஞ்சாலை
Nicoll Highway-CCL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 20 Republic Avenue
Singapore 038970
Line(s) Circle Line
Connections Bus Taxi
Abbreviation NCH

Nicoll Highway (CC5) is an underground Mass Rapid Transit (MRT) station on the Circle Line.

History

Date Event
17 April 2010 Station officially opens

Nicoll Highway collapse

On 20 April 2004, a section of tunnel being built for the Circle Line collapsed, apparently when a retaining wall used in the tunnel's construction gave way. This occurred near what was to become the Nicoll Highway station, not far from the Merdeka Bridge.

The accident left a collapse zone 150 m wide, 100 m long, and 30 m deep. Four workers were killed, with three more injured and one body which was never recovered. The collapse set back the completion of the Circle Line Stage 1 from 2008 to 17 April 2010.[1]

Art in Transit

Re-claiming the Peripherals by Khiew Huey Chian features how different subjects relating to a place can be developed through various shapes and formations of wild plants which was frequently overlooked in Singapore. It also show that anything can be of value if we just keep an open mind to observe the potential of things around us.

Layout

L2 Overhead Bridge The Concourse, Citygate, St John HQ
L1 Street Level
B1 Service Level Restricted access
B2 Concourse Faregates, Ticketing Machines, Passenger Service Centre
B3
BPlatform CC5
Nicoll Highway
CC4DT15
Promenade
CC1NS24NE6
Dhoby Ghaut
CE2NS27
Marina Bay
Platform A/B
APlatform CC29NE1
HarbourFront
CC15NS17
Bishan
CC6
Stadium
CC5
Nicoll Highway

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Nicoll Highway, The Concourse
B Republic Avenue, Marina Promenade

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
Circle Line
CC1 Dhoby Ghaut 05:48 05:48 06:15 23:57
CC29 HarbourFront 05:45 05:45 06:12 22:56
CC26 Pasir Panjang 23:26
CC23 one-north 23:42
CC17 Caldecott 00:10
CC11 Tai Seng 00:17
CC6 Stadium 06:07 06:07 06:30 00:01
CE2 Marina Bay 06:12 06:12 06:33 23:46

Bus

Bus Stop Exit Bus Service
(80161) Opp Nicoll Highway Stn A
10
14
16
16M
70
70M
196
(80169) Nicoll Highway Stn A
10
14
16
16M
70
70M
196

References

  1. "Transport minister announces next phase of Circle Line will open on Apr 17". Channel NewsAsia. 26 Jan 2010
Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL Stage 6: KeppelCantonmentPrince Edward Road
Circle Line Extension: PromenadeBayfrontMarina Bay
Rolling Stock C830C830C • C851E
Depots Kim Chuan