Tai Seng station

From SgWiki
Jump to: navigation, search


!
TRAVEL ADVISORY
!
North South Line: Train services between Orchard and City Hall stations will operate at a longer frequency till 7am due to track maintenance and upgrading works.
North South Line: Train service between City Hall and Raffles Place stations will start at 7am due to track maintenance and upgrading works. Affected commuters may board the East West Line instead.
North South Line: There is no train service between Woodlands and Yishun stations due to the construction of crossover track near Canberra station. Rail Bridging Service (Shuttle 10 & Express 17) are available. Certain bus service will be extended to coincide with the last shuttle bus timing.
North South Line: There is no train service between Woodlands and Yishun stations due to the construction of crossover track near Canberra station. Rail Bridging Service (Shuttle 10 & Express 17) are available. Certain bus service will be extended to coincide with the last shuttle bus timing.
East West Line: Train service between Tanah Merah and Bugis stations will end at 11pm due to track maintenance and upgrading works. Rail Bridging Service (Shuttle 6) are available during the early closure. Certain bus service will be extended to coincide with the last shuttle bus timing.
SBS Transit: Bus Service 253, 255, 257, 400 and 402 will have operate at a lower frequency during off-peak hours. Affected commuters may try the on-demand bus service during these time.
SMRT Buses: Bus Service NR7 will not be in operation. Affected commuters may try the on-demand bus service from 11.30pm to 2pm.
CC11
Tai Seng
大成
தை செங்
Tai Seng-CCL.png
Statistics
Address 33 Upper Paya Lebar Road
Singapore 534803
Line(s) Circle Line
Connections Bus Taxi
Abbreviation TSG

Tai Seng (CC11) is an underground Mass Rapid Transit (MRT) station on the Circle Line.

History

Date Event
28 May 2009 Station officially opens

Art in Transit

The artwork featured in this station is Equilibrium by Francis Ng. The author uses equilateral triangles, grid lines, transparent and reflective surfaces which put together with calculated precision and consideration of scale, proportionality and balance to examines the dynamics of spaces and invites a more considered attention to our surrounding spaces and the character of spaces we inhabit and commute in.

Layout

L1 Street Level
B1 Concourse Faregates, Ticketing Machines, Passenger Service Centre
B2 Platform B
CC11
Tai Seng
CC6
Stadium
CC1NS24NE6
Dhoby Ghaut
CE2NS27
Marina Bay
Platform A/B
Platform A
CC29NE1
HarbourFront
CC15NS17
Bishan
CC11
Tai Seng

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Upper Paya Lebar Road, Irving Road
B Upper Paya Lebar Road, Macpherson Road
C Handicapped/disabled access 18 Tai Seng

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
Circle Line
CC1 Dhoby Ghaut 05:35 05:35 06:02 23:44
CC7 Mountbatten 00:21
CC29 HarbourFront 05:44 05:44 06:11 23:08
CC26 Pasir Panjang 23:38
CC23 one-north 23:54
CC17 Caldecott 00:22

Bus

Bus Stop Exit Bus Service
(70281) Aft Tai Seng Stn A
22
24
28
43
58
62
70
70M
76
80
93
158
(70289) Aft Tai Seng Stn Exit C C
22
24
28
43
58
62
70
70M
76
80
93
158

References


Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL Stage 6: KeppelCantonmentPrince Edward Road
Circle Line Extension: PromenadeBayfrontMarina Bay
Rolling Stock C830C830C • C851E
Depots Kim Chuan