!
|
TRAVEL ADVISORY
|
!
|
- From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.
- From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
- Please refer
- here for more information on the adjustments.
- here for Shuttle Bus and Train arrangements.
- here for the work map.
- From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours.
- Please refer here for more information.
- From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard.An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes.
- Please refer here for more information.
- From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
- Please refer to the following for more information.
|
CC20 Farrer Road 花拉路 ஃபேரர் சாலை*Graphic From SGTrains/Wikipedia/LTA
|
Statistics
|
Address
|
71 Farrer Road Singapore 261006
|
Line(s)
|
Circle Line
|
Structure
|
Underground
|
Connections
|
|
Abbreviation
|
FRR
|
Farrer Road (CC20) is a Mass Rapid Transit (MRT) station on the Circle Line.
History[edit]
Date |
Event
|
8 October 2011 |
Station officially opened
|
Construction sinkhole[edit]
On 24 May 2008, a section of Cornwall Gardens above a section between Holland Village and Farrer Road stations collapsed, creating a 3m deep hole. No one was injured, but some of the households lost their access to cable TV and Internet, as well as the water supply. This is the third road that caved in during the construction of the Circle Line.[1]
Artworks[edit]
Circle Line: Art Lineage by Erzan Bin Adam
The artist roped in 300 members of the community to create this lively collection of lines and brushstrokes in a celebratory riot of colour. The art is meant to represent the “in-between spaces” where identity is formed – not by what is there, but what is in-between.[2]
L2
|
Overhead Bridge
|
|
L1
|
Street Level
|
|
B1
|
Concourse
|
Faregates, Ticketing Machines, Passenger Service Centre
|
B2
|
Service Level |
Restricted access
|
B3
|
|
Platform A/B
|
|
Exit |
Disabled-Access |
Location/Nearby
|
A |
|
Farrer Road
|
B |
|
Farrer Road, Empress Road
|
Transport Services[edit]
First/Last Train Timing[edit]
- More travel information: Alternative Travel Method
Bus Stop |
Exit |
Bus Service
|
Farrer Rd Stn Exit A 11119 Farrer Rd |
|
|
Farrer Rd Stn Exit B 11111 Farrer Rd |
|
|
References[edit]