Difference between revisions of "Cross Island Line"

From SgWiki
Jump to navigation Jump to search
m (Link again.)
m
Line 1: Line 1:
{{Infobox Line
{{Infobox/Line
| Name E= Cross Island Line
|Name=Cross Island Line
| Name C= 跨岛线
|Info=
| Name T=  
{{Infoline|Status|Under Planning}}
| Image=
| Image Description=
| Type= Rapid transit
| System= [[Mass Rapid Transit]]
| Status= Under planning
| Termini= {{TBC|TBA}}
| Stations= {{TBC|TBA}}
| Services= {{TBC|TBA}}
| Date O= 2030
| Date C=
| Owner= Land Transport Authority
| Operator= {{TBC|TBA}}
| Rolling stock= {{TBC|TBA}}
| Length= 52 km
| Track gauge= {{TBC|TBA}}
| Electrification= {{TBC|TBA}}
}}
}}


The '''Cross Island Line (CRL)''' will be the eighth [[Mass Rapid Transit]] line in Singapore. The line will be 50 km long and is expected to begin service in 2030.<ref name="JRL1">[http://app.mot.gov.sg/News_Centre/Latest_News/NewsID/6559AFFF0C92B236/Speech_by_Mr_Lui_Tuck_Yew_Minister_for_Transport_at_visit_to_DTL1_Chinatown_Station_17_January_2013.aspx "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. 17 Jan 2013]</ref>
'''Cross Island Line (CRL)''' will be the eighth [[Mass Rapid Transit]] line in Singapore. The line will be 50 km long and is expected to begin service in 2030.<ref>[http://app.mot.gov.sg/News_Centre/Latest_News/NewsID/6559AFFF0C92B236/Speech_by_Mr_Lui_Tuck_Yew_Minister_for_Transport_at_visit_to_DTL1_Chinatown_Station_17_January_2013.aspx "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. 17 Jan 2013]</ref>
 
As the name implies, the line connects Changi to Loyang, Pasir Ris, Hougang, Ang Mo Kio, Bukit Timah, Clementi, West Coast and Jurong.<ref name="JRL1"/>
 
==History==
It was first announced in January 2013.
 
The Nature Society (Singapore) (NSS) has opposed the Cross Island MRT Line cutting through nature reserves and has proposed an alternative route that cuts southwards via Lornie Road around the reserve. The line was depicted to cut through the Central Catchment Nature Reserve near MacRitchie Reservoir. The alignment cuts directly under primary forest and regrowth forests over a century old, according to maps in the position paper. The NSS said its concerns relate to the degradation of forest habitats from soil investigation and related engineering works that will be required above-ground. Surface works are expected to result in forest clearance, compaction of soil along the rail line's alignment, toxic material spillage and siltation that will seriously damage one of the two most pristine stream ecosystems in the reserve. The society's proposed alternate route will add 1.7 kilometres to 2 kilometres to the Cross Island Line, and an estimated four minutes' additional travel time. [http://www.channelnewsasia.com/news/singapore/nature-society-proposes/749418.html]


==References==
==References==
<references/>  
<references/>


==Related Links==
{{Mass Rapid Transit}}
{{Mass Rapid Transit}}
{{Railway Lines in Singapore}}
{{Railway Lines in Singapore}}


[[Category:Mass Rapid Transit Lines]]
[[Category:Mass Rapid Transit Lines]]

Revision as of 23:14, 13 September 2017


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Cross Island Line
Statistics
Status Under Planning

Cross Island Line (CRL) will be the eighth Mass Rapid Transit line in Singapore. The line will be 50 km long and is expected to begin service in 2030.[1]

References

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah

Template:Railway Lines in Singapore