Changi Depot

From SgWiki
Revision as of 18:31, 17 September 2017 by Supernutorcrazy (talk | contribs)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Changi Depot
樟宜车厂
சாங்கி பணிமனை
Statistics
Address 5 Koh Sek Lim Road
Singapore 486050
Line(s) East–West Line
Rolling Stock(s) C151
C651
C751B
C151A

Changi Depot is the second train depot in Singapore. It maintains trains for the East–West Line. It will be replaced by the new East Coast Integrated Depot when it was completed in 2024.

History

Date Event
4 November 1989 Depot officially opens

Train Vandalism

On 18 May 2010, a Kawasaki Heavy Industries C151 train carriage was deliberately vandalised in the depot. Elaborate graffiti was drawn on the lower half of the carriage.[1]

A Swiss national, Oliver Fricker was charged with three charges of trespassing into the depot on the early hours of 17 May and vandalising the train by spraying paint and damaging public property by cutting a wired fence into property belonging to the Land Transport Authority. Another British national has also been named as being involved in the case. However, his whereabouts are unknown.[2]

SMRT apologised for security lapse on 8 June 2010 and reviewed the security measures in all depots together with the authorities. All personnel of the security companies, employed by SMRT, have been instructed to step up vigilance. The number of security personnel and patrols at each depot has been increased.[3]

SMRT was fined S$50,000 for this incident.[4]

Reception Tracks

On the East West Line, it has 2 reception tracks that lead to Tanah Merah station.

References

  1. [1]. Straits Times (18 May 2010). Retrieved 4 June 2010.
  2. [2]. Channel NewsAsia (5 June 2010).
  3. "SECURITY MEASURES AT SMRT DEPOTS". SMRT Corporation.
  4. [3] ChannelNewsAsia (18 October 2011).
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah

Template:East West Line