Bishan Depot

From SgWiki
Revision as of 11:34, 2 September 2020 by Supernutorcrazy (talk | contribs) (Removed protection from "Bishan Depot")
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Bishan Depot
碧山车厂
பீஷான் பணிமனை
Statistics
Address 300 Bishan Road
Singapore 579828
Line(s) North–South Line
Rolling Stock(s) C151
C651
C751B
C151A
C151B
C151C

Bishan Depot is the first train depot in Singapore. It maintains trains for the North–South Line.

The depot was completed in 1987 by American architect Vikas M. Gore and the 12,000 square metres maintenance area at cost of S$300 million.

History

Date Event
7 November 1987 Depot officially opens

SMRT Cram Jam

On 11 February 2007, SMRT Organised the SMRT Cram Jam! cum Learning Journey and Charity Bazaar to raise funds for the SMRT Silver Tribute Fund. The Cram Jam took place in the morning seeking an entry into the Singapore Book of Records by cramming people inside a C151 train car (car 2027), a Mercedes-Benz O405G Bus (TIB1202K) and a Ssangyong Rodius/Stavic MPV Cab. The Singapore Police Force crammed 550 officers inside the train car, 235 staff from SMRT crammed inside the bus and an amazing 44 Girl Guides Singapore Cadets crammed themselves into the cab. Games and Carnival Food were organized and a 90-minute tour around the Bishan Depot.

Vandalism

A C751B (311/312) train was vandalised in an apparent security breach on 17 August 2011. The train was then put into service before the vandalism was discovered. On 15 July 2016, local and Australian media reported that between April and July 2015, two Americans Jim Harper and Danielle Bremner, posted a series of vandalism videos online under the pseudonyms Utah and Ether, with one video showing them committing the act at Bishan depot. Harper was arrested and jailed 6-months in May in Australia, while his partner is on the run.[1]

Another incident of a MRT train being vandalized happened on a C151A train on 5 May 2014. Police reports were made in the early hours of the morning when trains were being dispatched from the depot.[2]

A third case of vandalism took place on 8 November 2014 when two Germans, Andreas Von Knorre and Elton Hinz, spraypainted a cabin on a C151 train after breaking into the depot. They were each sentenced to nine months jail and given three strokes of the cane as per the Vandalism Act.[3]

Incidents

On 4 July 1985, there was a MRT mishap where four workers were trapped within 15 minutes.[4]

A technical officer working at the depot died as a result of his injuries sustained while operating a hydraulic press machine in the rolling stock shed on the morning of 24 March 2020. Following the accident, SMRT imposed a safety time-out and suspended maintenance works during the investigation period.[5]

Reception Tracks

On the North South Line, it has 3 reception tracks, 2 that lead to Ang Mo Kio station and 1 lead to Bishan station.

References

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951