Changi Depot

From SgWiki
Revision as of 11:09, 23 September 2017 by Supernutorcrazy (talk | contribs)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Sunday, 19 May 2024, The first bus timing for service
    168
    from Woodlands Interchange will be brought forward on Sundays & Public Holidays to 0545hrs. Please refer here for more information.

SBS Transit Tower Transit
  • Due to upgrading works at Boon Lay Interchange, from Sunday, 26 May 2024,
    • Bus service
      79
      will be amended to start from Jurong Town Hall Int and loop at Boon Lay Int via Jurong West St 64.
    • Bus service
      252
      will be amended to enter Boon Lay Int via Jurong West St 64.
  • Please refer to the following for more information.

SBS Transit
  • From Monday, 27 May 2024, City Direct services
    671
    &
    672
    will operate additional morning & evening trips. Please refer here for more information.

SBS Transit
  • From Monday, 27 May 2024, The first bus timing for service
    27
    from the following bus stops will be brought forward on Weekdays to the following timings:
    • The first bus timing from Hougang Central Interchange will be brought forward to 0510hrs on Weekdays.
    • The first bus timing from Sengkang East Ave (B/S 67261 (Blk 203B)) will be brought forwards to 0500hrs on Weekdays.
  • Please refer here for more information.

Changi Depot
樟宜车厂
சாங்கி பணிமனை
Statistics
Address 5 Koh Sek Lim Road
Singapore 486050
Line(s) East–West Line
Rolling Stock(s) C151
C651
C751B
C151A

Changi Depot is the third train depot in Singapore. It maintains trains for the East–West Line. It will be replaced by the new East Coast Integrated Depot when it was completed in 2024.

History

Date Event
4 November 1989 Depot officially opens

Train Vandalism

On 18 May 2010, a Kawasaki Heavy Industries C151 train carriage was deliberately vandalised in the depot. Elaborate graffiti was drawn on the lower half of the carriage.[1]

A Swiss national, Oliver Fricker was charged with three charges of trespassing into the depot on the early hours of 17 May and vandalising the train by spraying paint and damaging public property by cutting a wired fence into property belonging to the Land Transport Authority. Another British national has also been named as being involved in the case. However, his whereabouts are unknown.[2]

SMRT apologised for security lapse on 8 June 2010 and reviewed the security measures in all depots together with the authorities. All personnel of the security companies, employed by SMRT, have been instructed to step up vigilance. The number of security personnel and patrols at each depot has been increased.[3]

SMRT was fined S$50,000 for this incident.[4]

Reception Tracks

On the East West Line, it has 2 reception tracks that lead to Tanah Merah station.

References

  1. [1]. Straits Times (18 May 2010). Retrieved 4 June 2010.
  2. [2]. Channel NewsAsia (5 June 2010).
  3. "SECURITY MEASURES AT SMRT DEPOTS". SMRT Corporation.
  4. [3] ChannelNewsAsia (18 October 2011).
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251651751A751B751C830830C851E951
FutureJ151 • CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East CoastTengah

Template:East West Line