Difference between revisions of "Bishan station"

From SgWiki
Jump to navigation Jump to search
m (Removed protection from "Bishan station")
(No difference)

Revision as of 11:35, 2 September 2020


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Template:Code/2
Bishan
碧山
பீஷான்
Bishan-NSL.png
Bishan-CCL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 200 Bishan Road
17 Bishan Place
Singapore 579827/579842
Line(s) North–South Line
Circle Line
Structure Underground
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation BSH

Bishan (NS17/CC15) is a Mass Rapid Transit (MRT) station on the North–South Line and the Circle Line. Before peak period, some trains from Bishan Depot will arrive at platform B of the North–South Line station to travel southbound towards Marina South Pier.

History

Date Event
7 November 1987 Station officially opened
28 May 2009 Station interchanged with Circle Line

2004 incidents

On 28 July 2004, a 31 year old accountant died after falling on the track in front of an oncoming train at this station, disrupting northbound train services for an hour.[1][2] Another such incident happened to an elderly man on 15 September that year.[3]

Modification of station for Circle Line linkage

Major alterations were performed on the original North–South Line station to be linked to the Circle Line. A new air-conditioned southbound platform to serve the southbound trains (heading towards Marina Bay) was officially opened on 27 July 2008.[4] The original platform is now dedicated to only northbound train services (heading towards Jurong East). A wall now separates the southbound tracks and the northbound platform, and southbound train doors no longer open on the right towards the old platform.

2017 tunnel flooding

On 7 October 2017, water got into a section of the tunnel between Bishan and Braddell stations during a heavy downpour in the afternoon, which disrupted train services between Ang Mo Kio and Marina South Pier for several hours. This case of water entering MRT tunnels is believed to be the first time it has affected train service. Separately, at about 5.55pm, a small fire was spotted trackside in the tunnel between the Raffles Place and Marina Bay stations, but it had died down by itself. It is not clear if it is linked to the flood, although electrical short circuits caused by water had sparked tunnel fires before.[5] Train services between Newton and Marina South Pier were restored on the day itself at about 9.20pm while full train service resumed at 1.36pm the following day after overnight efforts to clear the water in the tunnel.[6] It was revealed that the overflowing in the tunnel was caused by a malfunction in the water pumping system, which has since been repaired.[7]

Artworks

  • CC15-Move.png
    Circle Line: Move! by Soh Ee Shaun
    The densely packed murals depict the artist’s feelings about the mindless rush of commuters in a train station. The three murals depicting daily life, family and the heartlands with a whimsical twist – students fly to school on rockets and animal-headed executives are rushing to work in a surreal world.[8]

Cultural impact

Being located on the former site of the Peck San Theng cemetery, the station is rumoured to be haunted, and has been the subject of several urban legends, as well as the site for alleged ghost encounters. A 1988 article in The New Paper mentioned rumoured sightings of headless ghosts at the station.[9]

Straits Times ran an article debunking an urban legend associated with the station, along with an article featuring an account by a passenger who claimed that, while riding on a train passing through the station one morning in the early 1990s, she was groped by several unseen hands before passing out. She was later revived by fellow passengers.[10] There are also other alleged encounters of ghosts and other entities by several passengers in and around the station, such as headless figures, footsteps coming from the roof of the train, and phantom passengers who do not cast reflections on the train windows.

Layout

L1 Street Level Junction 8, Bishan Bus Interchange
NSL Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
B1 Template:Route/2
Platform A
Template:Route/1
Platform B
B2 Transfer Linkway between North–South Line Platforms and Circle Line Concourse
CCL Concourse Faregates, Ticketing Machines, Passenger Service Centre
B3 Template:Route/3
Platform A/B
Template:Route/1

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Junction 8, Bishan Bus Interchange, Bishan Public Library
B Handicapped/disabled access Bishan Road, Bishan Street 14
C Handicapped/disabled access Bishan Road, Bishan Street 11
D Handicapped/disabled access Bishan Bus Interchange, Bishan Community Centre, Bishan-Toa Payoh Town Council (Branch Office)
E Handicapped/disabled access Junction 8 Basement

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png North–South Line
NS1Jurong East 06:08 06:23 06:29 00:14
NS7Kranji 00:30
NS28Marina South Pier 05:37 05:37 06:02 23:34
NS19Toa Payoh 00:16
File:MRT000.png Circle Line
CC1Dhoby Ghaut 05:40 05:40 06:07 23:35
CC7Mountbatten 00:12
CC12Bartley 00:36
CC29HarbourFront 05:23 05:23 05:47 23:18
CC26Pasir Panjang 23:48
CC23one-north 00:04
CC17Caldecott 00:32

Bus

Bus Stop Exit Bus Service
53009 Bishan Int
53231 Bishan Stn
53239 Opp Bishan Stn

References

  1. "Bishan MRT Death". The New Paper (29 July 2004).
  2. "Death at Bishan Station disrupt services". Wee Teck Hian (TODAY, 29 July 1994)
  3. "MRT incident hits services". TODAY (16 September 2004).
  4. "New Platform at Bishan Station ready". Starits Times (26 July 2008)
  5. "Water in the tunnel, trackside fire caused train disruption on NSL: SMRT". Channel NewsAsia (8 October 2017). Archived on 7 October 2017.
  6. "NSL disruption: No train services between Ang Mo Kio, Newton 'till further notice', says SMRT". Channel NewsAsia. Archived on 8 October 2017.
  7. "NSL disruption: Malfunctioning water pumping system resulted in flooded MRT tunnel, says LTA". Channel NewsAsia. Archived on 8 October 2017.
  8. "Art in Transit". Land Transport Authority.
  9. "Where are the ghosts?". Abdul Hadhi (The New Paper, 17 October 1988).
  10. "Is Bishan MRT 'unclean'?". Mak Mun San (Straits Times, 17 April 2005).

Template:North South Line

icon Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL6KeppelCantonmentPrince Edward Road
Circle Line ExtensionPromenadeBayfrontMarina Bay
Rolling Stock 830830C851E
Depots Kim Chuan
Others Bridging Service