Difference between revisions of "Thomson–East Coast Line"
Jump to navigation
Jump to search
m (→Rolling stock) |
m |
||
Line 25: | Line 25: | ||
|- | |- | ||
|31 January 2020||{{Stn|Woodlands North}} - {{Stn|Woodlands South}} | |31 January 2020||{{Stn|Woodlands North}} - {{Stn|Woodlands South}} | ||
|- | |||
|28 August 2021||{{Stn|Springleaf}} - {{Stn|Caldecott}} | |||
|} | |} | ||
Line 37: | Line 39: | ||
{{Stnline|{{Code/1|TE3|{{CSS/TEL|nofg=|nobc=}}}}|Woodlands South|TEL|Note=Terminus}} | {{Stnline|{{Code/1|TE3|{{CSS/TEL|nofg=|nobc=}}}}|Woodlands South|TEL|Note=Terminus}} | ||
|- | |- | ||
!colspan=5 style="{{CSS/TEL|nofg=|nobc=|bc=}}"|[[File:MRTFFF.png|18px|link=|alt=]] {{TEL|b=}} (Stage 2) | !colspan=5 style="{{CSS/TEL|nofg=|nobc=|bc=}}"|[[File:MRTFFF.png|18px|link=|alt=]] {{TEL|b=}} (Stage 2, Opening 28 August 2021) | ||
{{Stnline|{{Code/1|TE4|{{CSS/TEL|nobg=|fg=|bc=}}|dashed}}|Springleaf|TEL|Img=}} | {{Stnline|{{Code/1|TE4|{{CSS/TEL|nobg=|fg=|bc=}}|dashed}}|Springleaf|TEL|Img=}} | ||
{{Stnline|{{Code/1|TE5|{{CSS/TEL|nobg=|fg=|bc=}}|dashed}}|Lentor|TEL|Img=}} | {{Stnline|{{Code/1|TE5|{{CSS/TEL|nobg=|fg=|bc=}}|dashed}}|Lentor|TEL|Img=}} |
Revision as of 17:58, 30 June 2021
Template:Code/1 Thomson–East Coast Line 汤申–东海岸线 தாம்சன்–ஈஸ்ட் கோஸ்ட் வரி | |
Train Line Information | |
---|---|
Status | Partial Opened |
Termini | Woodlands North Sungei Bedok |
Stations | 32 |
Services | 1 |
Operator(s) | ![]() |
Rolling stock | CT251 |
Line length | 43 km |
Track gauge | 1,435 mm standard gauge |
Electrification | 750V DC Third rail |
Thomson–East Coast Line (TEL) is the sixth Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 5 minutes. The line is currently 2.8 km long with 3 stations and it is fully underground and automated. When completed in 2024, the line will be 43 km long with 31 stations.
History
Date | CollapseEvent |
---|---|
31 January 2020 | Woodlands North - Woodlands South |
28 August 2021 | Springleaf - Caldecott |
Stations
Rolling stock
The rolling stock consists of Kawasaki Heavy Industries & CRRC Qingdao Sifang CT251 trains. These trains operate from Mandai Depot near Woodlands South station, and will operate from East Coast Integrated Depot near Sungei Bedok station.
References
![]() |
[ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line
FutureJurong Region Line • Cross Island Line | |
Rolling Stocks | 151 • 151A • 151B • 151C • R151 • T251 • 751A • 751C • 830 • 830C • 851E • 951
Future J151 • CR151 | |
Depots | Bishan • Changi • Gali Batu • Kim Chuan • Mandai • Sengkang • Ulu Pandan • Tuas | |
Future Changi East • East Coast • Tengah |
Railway Lines in Singapore | [ V • T • E ] | |
---|---|---|
Mass Rapid Transit (MRT) | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line | |
FutureJurong Region Line • Cross Island Line | ||
Light Rail Transit (LRT) | Bukit Panjang LRT • Sengkang LRT • Punggol LRT | |
Cross-border | KTM Intercity | |
FutureJohor Bahru–Singapore Rapid Transit System | ||
Others | Changi Airport Skytrain • Sentosa Express | |
DefunctSentosa Monorail • Jurong Bird Park Panorail |
![]() |
[ V • T • E ] | |
---|---|---|
Stations | Woodlands North • Woodlands • Woodlands South • Springleaf • Lentor • Mayflower • Bright Hill • Upper Thomson • Caldecott • Mount Pleasant • Stevens • Napier • Orchard Boulevard • Orchard • Great World • Havelock • Outram Park • Maxwell • Shenton Way • Marina Bay • Marina South • Gardens by the Bay • Founders' Memorial • Tanjong Rhu • Katong Park • Tanjong Katong • Marine Parade • Marine Terrace • Siglap • Bayshore • Bedok South • Sungei Bedok | |
Rolling Stock | T251 | |
Depots | Mandai • East Coast | |
Others | Bridging Service |