Difference between revisions of "Changi Depot"

From SgWiki
Jump to navigation Jump to search
m
m
Line 7: Line 7:
}}
}}


'''Changi Depot''' is the second train depot in Singapore. It maintains trains for the {{EWL}}. It will be replaced by the new [[East Coast Integrated Depot]] when it was completed in 2024.
'''Changi Depot''' is the third train depot in Singapore. It maintains trains for the {{EWL}}. It will be replaced by the new [[East Coast Integrated Depot]] when it was completed in 2024.


==History==
==History==

Revision as of 11:09, 23 September 2017

!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SBS Transit
  • From Saturday, 15 March 2025, supplementary bus service 138M will be introduced to better serve residents travelling to the Ang Mo Kio Polyclinic. This service will operate at a frequency of 30 minutes from Ang Mo Kio Bus Interchange. Please refer here for more information.

Tower Transit
  • From Saturday, 15 March 2025, bus service 883M will operate on Saturdays from 7am to 1pm at 30-minute frequency to enhance connectivity to amenities along Yishun Avenue 7. Please refer here for more information.

SBS Transit
  • From Monday, 17 March 2025, short-trip service 71A will be introduced from Mayflower MRT Station to Bishan MRT Station. Please refer here for more information.

SMRT Buses
  • From Sunday, 23 March 2025, supplementary bus service 258M will ply an extended route looping at Boon Lay Place to provide direct connection to amenities such as Boon Lay Shopping Centre. Please refer here for more information.

SMRT Buses
  • From Monday, 24 March 2025, supplementary bus service 979X will be introduced to provide a faster connection for residents in Yew Tee Village to and from Bukit Panjang MRT / Bus Interchange. Bus service 979X will supplement bus service 979 and serve selected bus stops along its route. It will operate on weekdays (excluding Public Holidays) during the morning and evening peak periods. Please refer here for more information.

Tower Transit
  • From Monday, 24 March 2025, supplementary bus service 861M will be introduced to complement existing travel options to Wellington Primary School. It will operate from Canberra Way, terminating at Sembawang Bus Interchange. This service will operate two trips during the morning peak period on weekdays during school term only. Please refer here for more information.

SBS Transit
  • From Monday, 24 March 2025, short-trip service 112B will be introduced starting from Hougang Central Bus Interchange and terminating at Hougang Avenue 7. This service will only operate on weekdays (excluding public holidays) during the evening peak period. Please refer here for more information.

Changi Depot
樟宜车厂
சாங்கி பணிமனை
Train line(s) served
Address 5 Koh Sek Lim Road
Singapore 486050
Line(s) East–West Line
Rolling Stock(s) C151
C651
C751B
C151A

Changi Depot is the third train depot in Singapore. It maintains trains for the East–West Line. It will be replaced by the new East Coast Integrated Depot when it was completed in 2024.

History

Date Event
4 November 1989 Depot officially opens

Train Vandalism

On 18 May 2010, a Kawasaki Heavy Industries C151 train carriage was deliberately vandalised in the depot. Elaborate graffiti was drawn on the lower half of the carriage.[1]

A Swiss national, Oliver Fricker was charged with three charges of trespassing into the depot on the early hours of 17 May and vandalising the train by spraying paint and damaging public property by cutting a wired fence into property belonging to the Land Transport Authority. Another British national has also been named as being involved in the case. However, his whereabouts are unknown.[2]

SMRT apologised for security lapse on 8 June 2010 and reviewed the security measures in all depots together with the authorities. All personnel of the security companies, employed by SMRT, have been instructed to step up vigilance. The number of security personnel and patrols at each depot has been increased.[3]

SMRT was fined S$50,000 for this incident.[4]

Reception Tracks

On the East West Line, it has 2 reception tracks that lead to Tanah Merah station.

References

  1. [1]. Straits Times (18 May 2010). Retrieved 4 June 2010.
  2. [2]. Channel NewsAsia (5 June 2010).
  3. "SECURITY MEASURES AT SMRT DEPOTS". SMRT Corporation.
  4. [3] ChannelNewsAsia (18 October 2011).
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751C830830C851E951

Former651751B

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah

Template:East West Line