Downtown Line

From SgWiki
Revision as of 14:08, 16 March 2019 by Bbb23 (talk | contribs)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service on the East–West Line between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

SBS Transit SMRT Buses Go-Ahead Tower Transit
  • On Saturday, 30 November, Services , , , , /, , , , , , , , , , , , , , , , , , , , , , , , / & will be diverted to travel on alternative routes from the First Bus to 11.45am. They will skip bus stops along their regular routes, which will include Bayfront Avenue, Beach Road, Nicoll Highway as well as those in the Civic District, Central Business District and Marina Central.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses
    • Go-Ahead
    • Tower Transit

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

SBS Transit SMRT Buses Go-Ahead Tower Transit
  • On Sunday, 1 December, from the First Bus to 3.00pm, Services , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , & will be similarly affected by lane/road closures with bus stops skipped along their regular routes. The affected roads include Bayfront Avenue, Beach Road, Nicoll Highway, Fort Road and Keppel Road as well as those in the Civic District, Central Business District and Marina Central.
  • With the road closures on 1 December, Service will also commence operations at a later time at 12.00pm. Service will be diverted from its regular route along the ECP (towards Bedok North Depot) from the start of operations to 10.30am. However, no bus stops will be skipped. *Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses
    • Go-Ahead
    • Tower Transit

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Downtown Line
滨海市区线
டெளன்டவுன் வரி
DTL Map.png
Statistics
Status Partial Operational
Termini Bukit Panjang
Sungei Bedok
Stations 36 (2 U/C)
Services 1
Operator(s) SBS Transit
Rolling stock C951
Line length 41.9 km
Track gauge 1,435 mm standard gauge
Electrification 750V DC Third rail

Downtown Line (DTL) is the fifth Mass Rapid Transit (MRT) line. Traveling from one end to the other will takes about 70 minutes. The line will be 42.8 km long with 36 stations when completed and it is fully underground and automated.

History

Date Event
22 December 2013 Bugis - Chinatown
27 December 2015 Bukit Panjang - Bugis
21 October 2017 Chinatown - Expo

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:MRTFFF.png Downtown Line
2
Bukit Panjang Bukit Panjang-DTL.png Petir Terminus
Interchange with Bukit Panjang LRT
1
Cashew Cashew-DTL.png Cashew
1
Hillview Hillview-DTL.png Hillview
1
Hume Hume Under Construction
1
Beauty World Beauty World-DTL.png Beauty World
1
King Albert Park King Albert Park-DTL.png Blackmore
1
Sixth Avenue Sixth Avenue-DTL.png Sixth Avenue
1
Tan Kah Kee Tan Kah Kee-DTL.png Duchess
2
Botanic Gardens Botanic Gardens-DTL.png Botanic Gardens Interchange with Circle Line
2
Stevens Stevens-DTL.png Stevens Future Interchange with Thomson–East Coast Line
2
Newton Newton-DTL.png Newton Interchange with North–South Line
2
Little India Little India-DTL.png Little India Interchange with North East Line
1
Rochor Rochor-DTL.png Rochor
2
Bugis Bugis-DTL.png Bugis Interchange with East–West Line
2
Promenade Promenade-DTL.png Promenade Interchange with Circle Line
2
Bayfront Bayfront-CCL-DTL.png Bayfront Interchange with Circle Line
1
Downtown Downtown-DTL.png Landmark
1
Telok Ayer Telok Ayer-DTL.png Cross Street
2
Chinatown Chinatown-DTL.png Chinatown Interchange with North East Line
1
Fort Canning Fort Canning-DTL.png River Valley
1
Bencoolen Bencoolen-DTL.png Bencoolen
1
Jalan Besar Jalan Besar-DTL.png Sungei Road
1
Bendemeer Bendemeer-DTL.png Jalan Besar
1
Geylang Bahru Geylang Bahru-DTL.png Kallang Bahru
1
Mattar Mattar-DTL.png Mattar
2
MacPherson MacPherson-DTL.png MacPherson Interchange with Circle Line
1
Ubi Ubi-DTL.png Ubi
1
Kaki Bukit Kaki Bukit-DTL.png Kaki Bukit
1
Bedok North Bedok North-DTL.png Bedok Town Park
1
Bedok Reservoir Bedok Reservoir-DTL.png Bedok Reservoir
1
Tampines West Tampines West-DTL.png Tampines West
2
Tampines Tampines-DTL.png Tampines Interchange with East–West Line
1
Tampines East Tampines East-DTL.png Tampines East
1
Upper Changi Upper Changi-DTL.png Upper Changi
2
Expo Expo-DTL.png Expo Terminus
Interchange with East–West Line
File:MRTFFF.png Downtown Line Extension
1
Xilin Xilin Under Construction
2
Sungei Bedok Sungei Bedok Under Construction
Interchange with Thomson–East Coast Line

Services

Service Starting Terminate at Notes
Full Bukit Panjang Expo
Full Expo Bukit Panjang

Rolling stock

The rolling stock consists of Bombardier MOVIA C951 trains. These trains operate from two depots along the line, Gali Batu Depot near Bukit Panjang station and Kim Chuan Depot near Ubi station.

References


icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Downtown Line [ VTE ]
Stations Bukit PanjangCashewHillviewHumeBeauty WorldKing Albert ParkSixth AvenueTan Kah KeeBotanic GardensStevensNewtonLittle IndiaRochorBugisPromenadeBayfrontDowntownTelok AyerChinatownFort CanningBencoolenJalan BesarBendemeerGeylang BahruMattarMacPhersonUbiKaki BukitBedok NorthBedok ReservoirTampines WestTampinesTampines EastUpper ChangiExpo
DTL3eXilinSungei Bedok
Rolling Stock 951
Depots Gali BatuKim ChuanEast Coast
Others Bridging Service