Difference between revisions of "North East Line"
Jump to navigation
Jump to search
m |
m |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Line | {{Infobox/Line | ||
|Line=NEL | |Line=NEL | ||
|Name=North East Line<br>东北线<br>வடக்கு கிழக்கு வரி | |Name=North East Line<br>东北线<br>வடக்கு கிழக்கு வரி | ||
| | |Img=[[File:NEL Map.png|centre|300px]] | ||
|Info= | |||
|Info | {{Infoline|Status|Operational}} | ||
{{ | {{Infoline|Termini|{{Stn|HarbourFront}}<br>{{Stn|Punggol}}}} | ||
{{Infoline|Stations|17 (1 U/C)}} | |||
{{Infoline|Services|1}} | |||
{{ | {{Infoline|Operator(s)|{{SBST}}}} | ||
{{ | {{Infoline|Rolling stock|[[Alstom Metropolis C751A|C751A]], [[Alstom Metropolis C751C|C751C]]}} | ||
{{ | {{Infoline|Line length|19.2 km}} | ||
{{Infoline|Track gauge|1,435 mm standard gauge}} | |||
{{ | {{Infoline|Electrification|1500V DC Overhead catenary}} | ||
{{ | |||
{{ | |||
{{ | |||
{{ | |||
}} | }} | ||
'''North East Line (NEL)''' is the third [[Mass Rapid Transit]] (MRT) line | '''North East Line (NEL)''' is the third [[Mass Rapid Transit]] (MRT) line. Traveling from one end to the other takes about 35 minutes. The line is currently 19.2 km long with 16 stations and it is fully underground and automated. | ||
It is the first line to have artwork integrated into all its 16 stations under the Art in Transit programme. | |||
==History== | ==History== | ||
{|class=wikitable border | {|class="wikitable mw-collapsible" style="border-collapse:collapsed;width:50%" | ||
|- | |- | ||
!width=150|Date!!Event | |||
|- | |- | ||
| | |20 June 2003||{{Stn|HarbourFront}} - {{Stn|Punggol}} | ||
| | |||
|- | |- | ||
| | |15 January 2006||{{Stn|Buangkok}} (Opened on operational line) | ||
| | |- | ||
|20 June 2011||{{Stn|Woodleigh}} (Opened on operational line) | |||
|- | |||
|2023||{{Stn|Punggol}} - {{Stn|Punggol Coast}} | |||
|} | |} | ||
===North East Line Extension=== | ===North East Line Extension=== | ||
On 17 January 2013, a 2-kilometre extension which will run from {{Stn|Punggol}} through Punggol North including the new Punggol Downtown was announced. It is expected to be completed by 2023.<ref>[ | On 17 January 2013, a 2-kilometre extension which will run from {{Stn|Punggol}} through Punggol North including the new Punggol Downtown was announced. It is expected to be completed by 2023.<ref>[//app.lta.gov.sg/apps/news/page.aspx?c=2&id=38dc4ca3-5e70-4bf8-97bc-87f78e6303e7 "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030"]. Land Transport Authority. Retrieved 17 January 2013.</ref> | ||
===Possible future stations=== | ===Possible future stations=== | ||
* '''NE2:''' 1 new station between {{ | * '''NE2:''' 1 new station between {{Stn|HarbourFront}} & {{Stn|Outram Park}} | ||
==Stations== | ==Stations== | ||
{| class=" | {| class="wikitable" | ||
|- | |- | ||
! | !class="LTA"|Alpha-Numeric<br>Code!!class="LTA"|Station Name!!class="LTA"|Image!!class="LTA"|Working names!!class="LTA"|Notes | ||
|- | |- | ||
!{{Code|2|NEL| | !colspan=5 class="NEL"|[[File:MRTFFF.png|18px|link=|alt=]] North East Line | ||
|{{ | {{Stnline|{{Code|2|NEL|NE1|CCL|CC29|C2=}}|HarbourFront|NEL|World Trade Centre|Terminus<br>Interchange with {{CCL}}}} | ||
|Interchange with {{DTL}} | {{Stnline|{{Code|3|NEL|NE3|EWL|EW16|TEL|TE17}}|Outram Park|NEL|Outram Park|Interchange with {{EWL}}<br>Future Interchange with {{TEL}}}} | ||
{{Stnline|{{Code|2|NEL|NE4|DTL|DT19}}|Chinatown|NEL|People's Park|Interchange with {{DTL}}}} | |||
{{Stnline|{{Code|1|NEL|NE5}}|Clarke Quay|NEL}} | |||
{{Stnline|{{Code|3|NEL|NE6|NSL|NS24|CCL|CC1|C3=}}|Dhoby Ghaut|NEL|Dhoby Ghaut|Interchange with {{NSL}} and {{CCL}}}} | |||
{{Stnline|{{Code|2|NEL|NE7|DTL|DT12}}|Little India|NEL|Kadang Kerbau|Interchange with {{DTL}}}} | |||
{{Stnline|{{Code|1|NEL|NE8}}|Farrer Park|NEL}} | |||
{{Stnline|{{Code|1|NEL|NE9}}|Boon Keng|NEL}} | |||
{{Stnline|{{Code|1|NEL|NE10}}|Potong Pasir|NEL|Sennett}} | |||
{{Stnline|{{Code|1|NEL|NE11}}|Woodleigh|NEL}} | |||
{{Stnline|{{Code|2|NEL|NE12|CCL|CC13|C2=}}|Serangoon|NEL|Serangoon|Interchange with {{CCL}}}} | |||
{{Stnline|{{Code|1|NEL|NE13}}|Kovan|NEL}} | |||
{{Stnline|{{Code|1|NEL|NE14}}|Hougang|NEL}} | |||
{{Stnline|{{Code|1|NEL|NE15}}|Buangkok|NEL}} | |||
{{Stnline|{{Code|2|NEL|NE16|SKLRT|STC}}|Sengkang|NEL|Sengkang|Interchange with {{SKLRT}}}} | |||
{{Stnline|{{Code|2|NEL|NE17|PGLRT|PTC}}|Punggol|NEL|Punggol|Terminus<br>Interchange with {{PGLRT}}}} | |||
|- | |- | ||
! | !colspan=5 class="NEL"|[[File:MRTFFF.png|18px|link=|alt=]] North East Line Extension | ||
| | |||
|- | |- | ||
! | !style="text-align:left;"|{{Code|1|NEL|NE18}} | ||
|{{Stn|Punggol Coast}}|| ||Punggol Coast||Under Construction | |||
|{{Stn|Punggol Coast}}||Punggol Coast | |||
| | |||
|} | |} | ||
==Services== | ==Services== | ||
{| class="toccolours" border=1 style="border-collapse:collapse;text-align:left;font-size:95%" | {| class="toccolours" border=1 style="border-collapse:collapse;text-align:left;font-size:95%" | ||
|-style=" | |-class="NEL" style="text-align:center;" | ||
!Service!!Starting!!Terminate at!!Notes | !Service!!Starting!!Terminate at!!Notes | ||
|- | |- | ||
|Full||{{ | |Full||{{Stn|HarbourFront}}||{{Stn|Punggol}}|| | ||
|- | |- | ||
|Full||{{Stn|Punggol}}||{{ | |Full||{{Stn|Punggol}}||{{Stn|HarbourFront}}|| | ||
|} | |} | ||
Line 146: | Line 85: | ||
{{Mass Rapid Transit}} | {{Mass Rapid Transit}} | ||
{{Railway Lines | {{Railway Lines}} | ||
{{North East Line}} | {{North East Line}} | ||
Revision as of 08:32, 2 December 2018
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
Please refer here for more information.
|
North East Line 东北线 வடக்கு கிழக்கு வரி | |
Statistics | |
---|---|
Status | Operational |
Termini | HarbourFront Punggol |
Stations | 17 (1 U/C) |
Services | 1 |
Operator(s) | |
Rolling stock | C751A, C751C |
Line length | 19.2 km |
Track gauge | 1,435 mm standard gauge |
Electrification | 1500V DC Overhead catenary |
North East Line (NEL) is the third Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 35 minutes. The line is currently 19.2 km long with 16 stations and it is fully underground and automated.
It is the first line to have artwork integrated into all its 16 stations under the Art in Transit programme.
History
Date | Event |
---|---|
20 June 2003 | HarbourFront - Punggol |
15 January 2006 | Buangkok (Opened on operational line) |
20 June 2011 | Woodleigh (Opened on operational line) |
2023 | Punggol - Punggol Coast |
North East Line Extension
On 17 January 2013, a 2-kilometre extension which will run from Punggol through Punggol North including the new Punggol Downtown was announced. It is expected to be completed by 2023.[1]
Possible future stations
- NE2: 1 new station between HarbourFront & Outram Park
Stations
Alpha-Numeric Code |
Station Name | Image | Working names | Notes |
---|---|---|---|---|
File:MRTFFF.png North East Line | ||||
2
|
HarbourFront | World Trade Centre | Terminus Interchange with Circle Line | |
3
|
Outram Park | Outram Park | Interchange with East–West Line Future Interchange with Thomson–East Coast Line | |
2
|
Chinatown | People's Park | Interchange with Downtown Line | |
1
|
Clarke Quay | Clarke Quay | ||
3
|
Dhoby Ghaut | Dhoby Ghaut | Interchange with North–South Line and Circle Line | |
2
|
Little India | Kadang Kerbau | Interchange with Downtown Line | |
1
|
Farrer Park | Farrer Park | ||
1
|
Boon Keng | Boon Keng | ||
1
|
Potong Pasir | Sennett | ||
1
|
Woodleigh | Woodleigh | ||
2
|
Serangoon | Serangoon | Interchange with Circle Line | |
1
|
Kovan | Kovan | ||
1
|
Hougang | Hougang | ||
1
|
Buangkok | Buangkok | ||
2
|
Sengkang | Sengkang | Interchange with Sengkang LRT | |
2
|
Punggol | Punggol | Terminus Interchange with Punggol LRT | |
File:MRTFFF.png North East Line Extension | ||||
1
|
Punggol Coast | Punggol Coast | Under Construction |
Services
Service | Starting | Terminate at | Notes |
---|---|---|---|
Full | HarbourFront | Punggol | |
Full | Punggol | HarbourFront |
Rolling stock
The rolling stock consists of Alstom Metropolis C751A and Alstom Metropolis C751C trains. These trains operate from Sengkang Depot near Buangkok station.
References
- ↑ "TWO NEW RAIL LINES AND THREE NEW EXTENSIONS TO EXPAND RAIL NETWORK BY 2030". Land Transport Authority. Retrieved 17 January 2013.
Mass Rapid Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line | |
FutureJurong Region Line • Cross Island Line | ||
Rolling Stocks | 151 • 151A • 151B • 151C • R151 • T251 • 651 • 751A • 751B • 751C • 830 • 830C • 851E • 951 | |
FutureJ151 • CR151 | ||
Depots | Bishan • Changi • Gali Batu • Kim Chuan • Mandai • Sengkang • Ulu Pandan • Tuas | |
FutureChangi East • East Coast • Tengah |
Railway Lines in Singapore | [ V • T • E ] | |
---|---|---|
Mass Rapid Transit (MRT) | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line | |
FutureJurong Region Line • Cross Island Line | ||
Light Rail Transit (LRT) | Bukit Panjang LRT • Sengkang LRT • Punggol LRT | |
Cross-border | KTM Intercity | |
FutureJohor Bahru–Singapore Rapid Transit System | ||
Others | Changi Airport Skytrain • Sentosa Express | |
DefunctSentosa Monorail |
North East Line | [ V • T • E ] | |
---|---|---|
Stations | HarbourFront • Outram Park • Chinatown • Clarke Quay • Dhoby Ghaut • Little India • Farrer Park • Boon Keng • Potong Pasir • Woodleigh • Serangoon • Kovan • Hougang • Buangkok • Sengkang • Punggol North East Line extension: Punggol Coast | |
Rolling Stock | 751A • 751C • 851E | |
Depots | Sengkang | |
Others | Bridging Service |