North East Line

From SgWiki
Revision as of 09:21, 30 July 2023 by Supernutorcrazy (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SBS Transit SMRT Buses Tower Transit
  • From Sunday, 17 December 2023, due to Thomson-East Coast Line 3 Bus Rationalisation:
    • Bus service
      75
      will be shortened to terminate at Bukit Merah Int from Gali Batu Ter.
    • Bus service
      121
      will be amended to start from Shenton Way Ter.
    • Bus service
      162
      will be shortened to loop at Sin Ming Dr from Yio Chu Kang Int and converted to full-day service.
    • Bus service
      162M
      will be discontinued.
    • Bus service
      167
      will operate at a reduced frequency of 30-minute intervals.
    • Bus service
      859
      will be amended to ply Canberra Link, skipping a part of Canberra Rd.
    • The first bus of bus service
      980
      from Sembawang Int will be brought forward to depart at 5:30am on weekdays and Saturdays, and 5:45am on Sundays and public holidays while the last bus towards Sembawang Int from the bus stop opposite Novena Church (B/S 50031) will be extended till 12:30am daily. In addition, its frequency will also be enhanced, especially along sectors parallel to bus service
      167
      .
  • Please refer here for more information.

Go-Ahead
  • From Sunday, 17 December 2023, bus service
    84
    will be amended to ply Northshore Dr and New Punggol Rd, skipping Punggol Rd End. Please refer here for more information.

SMRT Buses
  • From Sunday, 17 December 2023, to enhance connectivity to Woodlands South MRT station and Woodlands Health Campus, bus services
    900
    and
    900A
    will be integrated as bus service
    900
    . It will be extended to ply Champions Way and Woodlands Dr 17, after Woodlands Dr 14 before looping around Woodlands Ave 1. Please refer here for more information.

SMRT Buses
  • From Sunday, 17 December 2023, the operating hours of bus service
    964
    from Woodlands Int will be extended till 10:45pm on Saturdays. In addition, it will also operate on Sundays and public holidays. Please refer here for more information.

SBS Transit
  • From Sunday, 17 December 2023, the daily operating hours of Service
    248M
    will be extended to 11.15pm to improve accessibility to the Tuas Port. Service
    248
    will operate at selected timings during service
    248M
    operating hours. Please refer here for more information.
NE
North East Line
东北线
வடக்கு கிழக்கு வரி
NEL Map.png
Statistics
Status Operational
Termini HarbourFront
Punggol
Stations 17 (1 U/C)
Services 1
Operator(s) SBS Transit
Rolling stock 751A, 751C, 851E
Line length 19.3 km
Track gauge 1,435 mm standard gauge
Electrification 1500V DC Overhead catenary

North East Line (NEL) is the third Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 35 minutes. The line is currently 19.3 km long with 16 stations and it is fully underground and automated. It is the first line to have artwork integrated into all its 16 stations under the Art in Transit programme.

History[edit]

Date Event
20 June 2003 HarbourFront - Punggol
15 January 2006 Buangkok (Added on operational line)
20 June 2011 Woodleigh (Added on operational line)

North East Line Extension[edit]

On 17 January 2013, a 2-kilometre extension which will run from Punggol through Punggol North including the new Punggol Downtown was announced. It is expected to be completed by 2024.[1]

2012 train disruption[edit]

On 15 March 2012, more than 117,000 commuters were affected during a peak hour train breakdown between HarbourFront and Dhoby Ghaut stations, caused by faulty overhead power cables at the tunnel near the Outram Park station that had snapped. A second problem was discovered relating to electricity insulation, delaying the service further. Train services resumed at 4.35pm after nearly 12 hours of disruption.[2]

Possible future stations[edit]

Stations[edit]

Alpha-Numeric
Code
Station Name Image Working names Notes
icon North East Line
NE1CC29 HarbourFront HarbourFront-NEL.png World Trade Centre Terminus
Interchange with Circle Line
NE3EW16TE17 Outram Park Outram Park-NEL.png Outram Park Interchange with East–West Line and Thomson–East Coast Line
NE4DT19 Chinatown Chinatown-NEL.png People's Park Interchange with Downtown Line
NE5 Clarke Quay Clarke Quay-NEL.png Clarke Quay
NE6NS24CC1 Dhoby Ghaut Dhoby Ghaut-NEL.png Dhoby Ghaut Interchange with North–South Line and Circle Line
NE7DT12 Little India Little India-NEL.png Kadang Kerbau Interchange with Downtown Line
NE8 Farrer Park Farrer Park-NEL.png Farrer Park
NE9 Boon Keng Boon Keng-NEL.png Boon Keng
NE10 Potong Pasir Potong Pasir-NEL.png Sennett
NE11 Woodleigh Woodleigh-NEL.png Woodleigh
NE12CC13 Serangoon Serangoon-NEL.png Serangoon Interchange with Circle Line
NE13 Kovan Kovan-NEL.png Kovan
NE14CR8 Hougang Hougang-NEL.png Hougang Future Interchange with Cross Island Line
NE15 Buangkok Buangkok-NEL.png Buangkok
NE16STC Sengkang Sengkang-NEL.png Sengkang Interchange with Sengkang LRT
NE17CP4PTC Punggol Punggol-NEL.png Punggol Terminus
Interchange with Punggol LRT
Future Interchange with Cross Island Line
icon North East Line Extension
NE18 Punggol Coast Punggol Coast Under Construction

Rolling stock[edit]

The rolling stock consists of Alstom Metropolis 751A, Alstom Metropolis 751C and Alstom Metropolis 851E trains. These trains operate from Sengkang Depot near Buangkok station.

References[edit]

  1. "North East Line Extension". Land Transport Authority. Retrieved 24 June 2020.
  2. "NEL's Dhoby Ghaut – Habourfront service resumes". Channel NewsAsia. Archived on 15 March 2012.
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251651751A751B751C830830C851E951
FutureJ151 • CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi East • East CoastTengah
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon North East Line [ VTE ]
Stations HarbourFrontOutram ParkChinatownClarke QuayDhoby GhautLittle IndiaFarrer ParkBoon KengPotong PasirWoodleighSerangoonKovanHougangBuangkokSengkangPunggol
North East Line extension: Punggol Coast
Rolling Stock 751A751C851E
Depots Sengkang
Others Bridging Service