Difference between revisions of "Alstom Metropolis 830C"

From SgWiki
Jump to navigation Jump to search
(Created page with ": ''Not to be confused with Alstom Metropolis C830.'' {| class="toccolours" style="float: right; border-collapse: collapse; margin: 0em 1em;" border="1" cellpadding="2" ce...")
 
m (Supernutorcrazy moved page Alstom Metropolis C830C to Alstom Metropolis 830C without leaving a redirect)
 
(28 intermediate revisions by 7 users not shown)
Line 1: Line 1:
: ''Not to be confused with [[Alstom Metropolis C830]].''
{{Infobox/Train
{| class="toccolours" style="float: right; border-collapse: collapse; margin: 0em 1em;" border="1" cellpadding="2" cellspacing="0"
|Name=Alstom Metropolis C830C
| colspan="2" style="text-align:center" | <big><strong>Alstom Metropolis C830C<br>阿尔斯通 C830C</strong></big>
|Img=[[File:C830C-Ext(1).png|center-left|160px]] [[File:C830C-Int(1).png|center-right|160px]]
|-
|Info1=
| colspan="2"|  
{{Infoline|In service|2015 – Present}}
|-
{{Infoline|Manufacturer|Shanghai Alstom Transport}}
! In service
{{Infoline|Origin|Shanghai, China}}
| 2015
{{Infoline|Constructed|2014 – 2015}}
|-
{{Infoline|Number Built|72 cars (24 Trains)}}
! Manufacturer
|Info2=
| Alstom
{{Infoline|Body Construction|Welded aluminium}}
|-
{{Infoline|Length|23.65 m (Mc1/Mc2)<br>22.8 m (T)}}
! Built at
{{Infoline|Width|3.2 m}}
| Valenciennes, France
{{Infoline|Height|3.7 m}}
|-
{{Infoline|Doors|1.45 m, 8 per car}}
! Family name
{{Infoline|Maximum Speed|Design: 90 km/h<br>Service: 78 km/h}}
| Metropolis
{{Infoline|Traction Control|IGBT-VVVF (Alstom ONIX)}}
|-
{{Infoline|Line Voltage|750V DC Third Rail}}
! Constructed
{{Infoline|Track Gauge|1435 mm Standard Gauge}}
| 2012 - 2015
}}
|-
 
! Number built
'''Alstom Metropolis C830C''' are the second generation of trains running on the {{CCL}}. These trains were manufactured from 2014 to 2015 by Alstom Transport under the Contract 830C.
| Passenger service: 48 carriages (16 trains)
 
==History==
Alstom Transport was awarded Contract C830C in 2012 at a cost of $134 million for the construction of 72 passenger cars.<ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=5qmktlgi52sor9rc5r00c6xm8pg371lwhgx5hvtwu8381p6o95 "LTA and SMRT Award Contracts for New Trains."]. Land Transport Authority (1 Feb 2012). Retrieved 16 November 2013.</ref>
 
===Faulty Equipment===
Passenger Vehicle 46 suffered from a faulty signalling hardware, resulting in intermittent signaling issues which caused widespread disruptions to the Circle Line for a week in both August and November 2016.<ref>[//www.straitstimes.com/singapore/transport/mystery-of-circle-lines-signalling-woes-solved-train-with-faulty-signalling "Mystery of Circle Line's signalling woes solved, train with faulty signalling hardware to blame: LTA"]. Christopher Tan (Straits Times, 11 November 2016).</ref>
 
==Design/Features==
{| class="toccolours" border=1 style="text-align:center;border-collapse:collapse;"
|-class="SMRT"
!class="LTA"|
!Initial
|-
|-
! Formation
!
| 3 per trainset<br>Mc1 + T + Mc2
|<div class="train">{{TrainCar|Mc1|E6E200|left|000}} {{TrainCar|T|C3B091|4=000}} {{TrainCar|Mc2|000080|right}}</div>
|-style="background-color:#DDD"
!colspan=2|Exterior Design
|-
|-
! Capacity
!style="text-align:left"|Livery
| 931 passengers
|Black,Red (Top to bottom)
|-
|-
! Operator
!style="text-align:left"|Train Run Number
| SMRT Corporation
|Orange LED
|-style="background-color:#DDD"
!colspan=2|Interior Design
|-
|-
! Depot(s)
!style="text-align:left"|Seating Capacity
| [[Kim Chuan Depot|Kim Chuan]]
|146
|-
|-
! Line(s) served
!style="text-align:left"|Wheelchair Bay
| [[Circle Line]]
|2, 1 each at either end of Middle Car
|-
|-
| style="background:#efefef;" align="center" colspan="2"| <strong>Specifications</strong> 
!style="text-align:left"|Door Closing Indicator Lights
|- 
|1 Yellow Alert Light (Top)
! Car body<br>construction
| Welded aluminium
|-
|-
! Doors
!style="text-align:left"|Passenger Information System
| 1.4 m, 8 per car
|Train Travel Information System (LED display)<br>Dynamic Route Map Display
|-  
|-style="background-color:#DDD"
! Maximum speed
!colspan=2|System
| 90 km/h
|-
|-
! Traction system
!style="text-align:left"|Safety System
| IGBT-VVVF<br>(Alstom ONIX)
|ATC, ATO, ATP, ATS
|-
|-
! Power output
!style="text-align:left"|Signalling System
| 1.66 MW
|Communication Based Train Control
|-
|-
! Electric system(s)
!style="text-align:left"|Traction Control
| 750 V DC 3<sup>rd</sup> rail
|IGBT-VVVF (Alstom ONIX)
|-
! Safety system(s)
| ATC (CBTC)
|-
! Gauge
| 1,435 mm Standard gauge
|}
|}


The '''Alstom Metropolis C830C''' together with the [[Alstom Metropolis C751C]] are the third generation of communication-based train control (CBTC) rolling stock to be used in Singapore’s [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] (MRT) lines. The contract, worth S$134 million, was awarded to Alstom (as part of turnkey contract C830C) by the [[Land Transport Authority]] (LTA) in Singapore to supply additional trains for the [[Circle Line]].[http://app.lta.gov.sg/corp_press_content.asp?start=5qmktlgi52sor9rc5r00c6xm8pg371lwhgx5hvtwu8381p6o95]
==Fleet Numbering==
The car numbers of the trains range from 841x to 864x, where x depends on the carriage type.
*The last digit identifies the position of the car from the front end of the train; where ‘1’ represents first car, ‘2’ represents second car and ‘3’ represents third car.
**(Example) Passenger Vehicle 50 (also 850) would consist of 3 cars with serial number 8501, 8502, 8503 respectively.
*Depending on the direction of travel, the sequence may be reversed.


The train, a total of 16 trainsets of 3 cars will be delivered starting from 2015.
==References==
<references/>


==References==
{{Mass Rapid Transit}}
* http://app.lta.gov.sg/corp_press_content.asp?start=5qmktlgi52sor9rc5r00c6xm8pg371lwhgx5hvtwu8381p6o95
{{Circle Line}}


==Related Links==
[[Category:Train Rolling Stock]]
*[[Trains]]
*[[Trains in Depots]]<br><br><br><br><br><br><br>
{{Mass Rapid Transit (Singapore)}}

Latest revision as of 17:36, 21 June 2023

Alstom Metropolis C830C
center-left center-right
*Graphic From SGTrains/Wikipedia/LTA
In service 2015 – Present
Manufacturer Shanghai Alstom Transport
Origin Shanghai, China
Constructed 2014 – 2015
Number Built 72 cars (24 Trains)
Statistics
Body Construction Welded aluminium
Length 23.65 m (Mc1/Mc2)
22.8 m (T)
Width 3.2 m
Height 3.7 m
Doors 1.45 m, 8 per car
Maximum Speed Design: 90 km/h
Service: 78 km/h
Traction Control IGBT-VVVF (Alstom ONIX)
Line Voltage 750V DC Third Rail
Track Gauge 1435 mm Standard Gauge

Alstom Metropolis C830C are the second generation of trains running on the Circle Line. These trains were manufactured from 2014 to 2015 by Alstom Transport under the Contract 830C.

History[edit]

Alstom Transport was awarded Contract C830C in 2012 at a cost of $134 million for the construction of 72 passenger cars.[1]

Faulty Equipment[edit]

Passenger Vehicle 46 suffered from a faulty signalling hardware, resulting in intermittent signaling issues which caused widespread disruptions to the Circle Line for a week in both August and November 2016.[2]

Design/Features[edit]

Initial
Mc1 T Mc2
Exterior Design
Livery Black,Red (Top to bottom)
Train Run Number Orange LED
Interior Design
Seating Capacity 146
Wheelchair Bay 2, 1 each at either end of Middle Car
Door Closing Indicator Lights 1 Yellow Alert Light (Top)
Passenger Information System Train Travel Information System (LED display)
Dynamic Route Map Display
System
Safety System ATC, ATO, ATP, ATS
Signalling System Communication Based Train Control
Traction Control IGBT-VVVF (Alstom ONIX)

Fleet Numbering[edit]

The car numbers of the trains range from 841x to 864x, where x depends on the carriage type.

  • The last digit identifies the position of the car from the front end of the train; where ‘1’ represents first car, ‘2’ represents second car and ‘3’ represents third car.
    • (Example) Passenger Vehicle 50 (also 850) would consist of 3 cars with serial number 8501, 8502, 8503 respectively.
  • Depending on the direction of travel, the sequence may be reversed.

References[edit]

  1. "LTA and SMRT Award Contracts for New Trains.". Land Transport Authority (1 Feb 2012). Retrieved 16 November 2013.
  2. "Mystery of Circle Line's signalling woes solved, train with faulty signalling hardware to blame: LTA". Christopher Tan (Straits Times, 11 November 2016).
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
icon Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL6KeppelCantonmentPrince Edward Road
Circle Line ExtensionPromenadeBayfrontMarina Bay
Rolling Stock 830830C851E
Depots Kim Chuan
Others Bridging Service