Difference between revisions of "Thomson–East Coast Line"

From SgWiki
Jump to navigation Jump to search
m
m
Line 9: Line 9:
  {{Infoline|Services|1}}
  {{Infoline|Services|1}}
  {{Infoline|Operator(s)|{{SMRT}}}}
  {{Infoline|Operator(s)|{{SMRT}}}}
  {{Infoline|Rolling stock|[[Kawasaki Heavy Industries & CSR Qingdao Sifang CT251|CT251]]}}
  {{Infoline|Rolling stock|[[Kawasaki Heavy Industries & CRRC Qingdao Sifang CT251|CT251]]}}
  {{Infoline|Line length|43 km}}
  {{Infoline|Line length|43 km}}
  {{Infoline|Track gauge|1,435 mm standard gauge}}
  {{Infoline|Track gauge|1,435 mm standard gauge}}
Line 143: Line 143:


==Rolling stock==
==Rolling stock==
The rolling stock consists of [[Kawasaki Heavy Industries & CSR Qingdao Sifang CT251]] trains. These trains will operate from two depots along the line, [[Mandai Depot]] near {{Stn|Woodlands South| station}} and [[East Coast Integrated Depot]] near {{Stn|Sungei Bedok| station}}.
The rolling stock consists of [[Kawasaki Heavy Industries & CRRC Qingdao Sifang CT251]] trains. These trains will operate from two depots along the line, [[Mandai Depot]] near {{Stn|Woodlands South| station}} and [[East Coast Integrated Depot]] near {{Stn|Sungei Bedok| station}}.


==References==
==References==

Revision as of 12:58, 7 July 2018


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Thomson East Coast Line
汤申东海岸线
தாம்சன் ஈஸ்ட் கோஸ்ட் வரி
TEL Map.png
Statistics
Status Under construction
Termini Woodlands North
Sungei Bedok
Stations 31
Services 1
Operator(s) SMRT Trains
Rolling stock CT251
Line length 43 km
Track gauge 1,435 mm standard gauge
Electrification 750V DC Third rail

Thomson East Coast Line (TEL) will be the sixth Mass Rapid Transit (MRT) line. The line will be 43 km long with 31 stations when completed and it is fully underground and automated.

History

Date Event
2019 Woodlands North - Woodlands South
2020 Woodlands South - Caldecott
2021 Caldecott - Gardens by the Bay
2023 Gardens by the Bay - Bayshore
2024 Bayshore - Sungei Bedok

Stations

Alpha-Numeric
Code
Station Name Working names Notes
colspan=5 style="background-color:Template:Colour/TEL;color:#FFF;"|File:MRTFFF.png Thomson East Coast Line (Stage 1)
1
Woodlands North Woodlands North Terminus
2
Woodlands Woodlands Interchange with North–South Line
1
Woodlands South Woodlands South
colspan=5 style="background-color:Template:Colour/TEL;color:#FFF;"|File:MRTFFF.png Thomson East Coast Line (Stage 2)
1
Springleaf Springleaf
1
Lentor Lentor
1
Mayflower Mayflower
1
Bright Hill Sin Ming
1
Upper Thomson Upper Thomson
2
Caldecott Caldecott Interchange with Circle Line
colspan=5 style="background-color:Template:Colour/TEL;color:#FFF;"|File:MRTFFF.png Thomson East Coast Line (Stage 3)
1
Mount Pleasant Mount Pleasant
2
Stevens Stevens Interchange with Downtown Line
1
Napier Napier
1
Orchard Boulevard Orchard Boulevard
2
Orchard Orchard Interchange with North–South Line
1
Great World Great World
1
Havelock Havelock
3
Outram Park Outram Park Interchange with East–West Line or North East Line
1
Maxwell Maxwell
1
Shenton Way Shenton Way
3
Marina Bay Marina Bay Interchange with North–South Line or Circle Line
1
Marina South Marina South
1
Gardens by the Bay Gardens by the Bay
colspan=5 style="background-color:Template:Colour/TEL;color:#FFF;"|File:MRTFFF.png Thomson East Coast Line (Stage 4)
1
Tanjong Rhu Tanjong Rhu
1
Katong Park Katong Park
1
Tanjong Katong Amber
1
Marine Parade Marine Parade
1
Marine Terrace Marine Terrace
1
Siglap Siglap
1
Bayshore Bayshore
colspan=5 style="background-color:Template:Colour/TEL;color:#FFF;"|File:MRTFFF.png Thomson East Coast Line (Stage 5)
1
Bedok South Bedok South
2
Sungei Bedok Sungei Bedok Terminus
Interchange with Downtown Line

Rolling stock

The rolling stock consists of Kawasaki Heavy Industries & CRRC Qingdao Sifang CT251 trains. These trains will operate from two depots along the line, Mandai Depot near Woodlands South station and East Coast Integrated Depot near Sungei Bedok station.

References


icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail

Template:Thomson East Coast Line