Difference between revisions of "Mass Rapid Transit"
m |
|||
Line 26: | Line 26: | ||
!Line!!Commencement!!width=50|Latest extension!!Terminus!!Stations!!width=50|Length (km)!!Rolling Stocks!!Depot!!Operator!!Control Center | !Line!!Commencement!!width=50|Latest extension!!Terminus!!Stations!!width=50|Length (km)!!Rolling Stocks!!Depot!!Operator!!Control Center | ||
|- | |- | ||
|{{NSL}}||7 November 1987||2014||{{Stn|Jurong East}}<br>{{Stn|Marina South Pier}}||27||45||rowspan=2|[[Kawasaki Heavy Industries | |{{NSL}}||7 November 1987||2014||{{Stn|Jurong East}}<br>{{Stn|Marina South Pier}}||27||45||rowspan=2|[[Kawasaki Heavy Industries 151|151]]<br>[[Siemens 651|651]]<br>[[Kawasaki Heavy Industries & Nippon Sharyo 751B|751B]]<br>[[Kawasaki Heavy Industries & CSR Qingdao Sifang 151A|151A]]<br>[[Kawasaki Heavy Industries & CSR Qingdao Sifang 151B|151B]]<br>[[Kawasaki Heavy Industries & CRRC Qingdao Sifang 151C|151C]]<br>[[Alstom MOVIA R151|R151]]||rowspan=2|[[Bishan Depot]]<br>[[Ulu Pandan Depot]]<br>[[Changi Depot]]<br>[[Tuas Depot]]||rowspan=2|{{SMRT}}||rowspan=2|Kim Chuan Depot | ||
|- | |- | ||
|{{EWL}}||12 December 1987||2017||{{Stn|Pasir Ris}}<br>{{Stn|Tuas Link}}<br>{{Stn|Changi Airport}}||35||55.7 | |{{EWL}}||12 December 1987||2017||{{Stn|Pasir Ris}}<br>{{Stn|Tuas Link}}<br>{{Stn|Changi Airport}}||35||55.7 | ||
|- | |- | ||
|{{NEL}}||20 June 2003||{{N/A}}||{{Stn|HarbourFront}}<br>{{Stn|Punggol}}||16||19.3||[[Alstom Metropolis | |{{NEL}}||20 June 2003||{{N/A}}||{{Stn|HarbourFront}}<br>{{Stn|Punggol}}||16||19.3||[[Alstom Metropolis 751A|751A]]<br>[[Alstom Metropolis 751C|751C]]||[[Sengkang Depot]]||{{SBST}}||Sengkang Depot | ||
|- | |- | ||
|{{CCL}}||28 May 2009||2012||{{Stn|Dhoby Ghaut}}<br>{{Stn|HarbourFront}}<br>{{Stn|Marina Bay}}||30||34.6||[[Alstom Metropolis C830|C830]]<br>[[Alstom Metropolis C830C|C830C]]||[[Kim Chuan Depot]]||{{SMRT}}||Kim Chuan Depot | |{{CCL}}||28 May 2009||2012||{{Stn|Dhoby Ghaut}}<br>{{Stn|HarbourFront}}<br>{{Stn|Marina Bay}}||30||34.6||[[Alstom Metropolis C830|C830]]<br>[[Alstom Metropolis C830C|C830C]]||[[Kim Chuan Depot]]||{{SMRT}}||Kim Chuan Depot | ||
Line 36: | Line 36: | ||
|{{DTL}}||22 December 2013||2017||{{Stn|Bukit Panjang}}<br>{{Stn|Expo}}||34||40.6||[[Bombardier MOVIA C951|C951]]||[[Kim Chuan Depot]]<br>[[Gali Batu Depot]]||{{SBST}}||Gali Batu Depot | |{{DTL}}||22 December 2013||2017||{{Stn|Bukit Panjang}}<br>{{Stn|Expo}}||34||40.6||[[Bombardier MOVIA C951|C951]]||[[Kim Chuan Depot]]<br>[[Gali Batu Depot]]||{{SBST}}||Gali Batu Depot | ||
|- | |- | ||
|{{TEL}}||31 January 2020||2022||{{Stn|Woodlands North}}<br>{{Stn|Gardens by the Bay}}||20||29.3||[[Kawasaki Heavy Industries & CRRC Qingdao Sifang | |{{TEL}}||31 January 2020||2022||{{Stn|Woodlands North}}<br>{{Stn|Gardens by the Bay}}||20||29.3||[[Kawasaki Heavy Industries & CRRC Qingdao Sifang T251|T251]]||[[Mandai Depot]]||{{SMRT}}||[[Mandai Depot]] | ||
|} | |} | ||
Revision as of 15:19, 17 June 2023
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
|
Mass Rapid Transit | |
Statistics | |
---|---|
Owner | Land Transport Authority |
Operator(s) | |
Number of lines | 6 |
Number of stations | 134 |
System length | 224.5 km |
The Mass Rapid Transit (MRT) system forming the major component of the railway system. The network has since grown rapidly in accordance with the aim of developing a comprehensive rail network as the backbone of the public transport system.
The network encompasses 224.5 km of active route with 134 stations in operation. The lines are built by the Land Transport Authority which allocates operating concessions to the profit-based corporations, SMRT Corporation and SBS Transit.
History
- Main article: History of the Mass Rapid Transit
The origins of the Mass Rapid Transit (MRT) are derived from a forecast by city planners in 1967 which stated the need for a rail-based urban transport system by 1992.[1][2][3] Following a debate on whether a bus-only system would be more cost-effective, then Minister for Communications Ong Teng Cheong, came to the conclusion that an all-bus system would be inadequate, as it would have to compete for road space in a land-scarce country.[4][5]
The network was built in stages, with the North–South Line given priority because it passes through the Central Area that has a high demand for public transport. The Mass Rapid Transit Corporation (MRTC), later renamed as SMRT Corporation — was established on 14 October 1983; it took over the roles and responsibilities (which was the construction and operation the MRT system) of the former provisional Mass Rapid Transit Authority.[4][6] The first section of the North–South Line started operations on 7 November 1987. The opening of Boon Lay on the East–West Line on 6 July 1990 marked the completion of the system two years ahead of schedule.[7][8]
Infrastructure
Line | Commencement | Latest extension | Terminus | Stations | Length (km) | Rolling Stocks | Depot | Operator | Control Center |
---|---|---|---|---|---|---|---|---|---|
North–South Line | 7 November 1987 | 2014 | Jurong East Marina South Pier |
27 | 45 | 151 651 751B 151A 151B 151C R151 |
Bishan Depot Ulu Pandan Depot Changi Depot Tuas Depot |
Kim Chuan Depot | |
East–West Line | 12 December 1987 | 2017 | Pasir Ris Tuas Link Changi Airport |
35 | 55.7 | ||||
North East Line | 20 June 2003 | N/A | HarbourFront Punggol |
16 | 19.3 | 751A 751C |
Sengkang Depot | Sengkang Depot | |
Circle Line | 28 May 2009 | 2012 | Dhoby Ghaut HarbourFront Marina Bay |
30 | 34.6 | C830 C830C |
Kim Chuan Depot | Kim Chuan Depot | |
Downtown Line | 22 December 2013 | 2017 | Bukit Panjang Expo |
34 | 40.6 | C951 | Kim Chuan Depot Gali Batu Depot |
Gali Batu Depot | |
Thomson–East Coast Line | 31 January 2020 | 2022 | Woodlands North Gardens by the Bay |
20 | 29.3 | T251 | Mandai Depot | Mandai Depot |
Expansion
The following table lists Mass Rapid Transit lines that are currently under construction, or that are in the planning stages:
Line | Commencement | Between stations | Stations | Length (km) | Depot | Operator | |
---|---|---|---|---|---|---|---|
Under Construction | |||||||
North East Line (North East Line extension) |
2024 | Punggol | Punggol Coast | 1 | 2 | N/A | |
Circle Line (Stage 6) |
2026 | HarbourFront | Marina Bay | 3 | 4 | N/A | |
Downtown Line (Stage 3 extension & Hume station) |
2025 | Expo | Sungei Bedok | 2 | 2.2 | East Coast Integrated Depot | |
Hume | 1 | 0 | N/A | ||||
Thomson–East Coast Line | 2024 (Stage 4) 2025 (Stage 5) 2025 (Founders' Memorial station) |
Gardens by the Bay | Sungei Bedok | 10 | 13.7 | East Coast Integrated Depot | |
Jurong Region Line | 2027 (Stage 1) 2028 (Stage 2) 2029 (Stage 3) |
Choa Chu Kang Bahar Junction Tengah |
Jurong Pier Peng Kang Hill Pandan Reservoir |
24 | 24 | Tengah Depot | N/A |
Cross Island Line | 2030 (Stage 1) | Aviation Park | Bright Hill | 12 | 29 | Changi East Depot | |
Under Planning | |||||||
Cross Island Line | 2032 (Stage 2) 2032 (Punggol extension) |
Bright Hill | Jurong Lake District | 6 | 15 | N/A | N/A |
Pasir Ris | Punggol | 3 | 7.3 |
References
- ↑ "Southeast Asian Affairs.", Page 293. Seah C. M. (Singapore: Institute of Southeast Asian Studies, 1981).
- ↑ Sharp 2005, page 66
- ↑ "Sustainable Urban Transportation Planning and Development — Issues and Challenges for Singapore". Fwa Tien Fang (Department of Civil Engineering, NUS, 4 September 2004)
- ↑ 4.0 4.1 "1982 – The Year Work Began". Land Transport Authority. Retrieved 16 November 2013.
- ↑ "In Memoriam — Ong Teng Cheong: A Profile". Lee Siew Hoon, Chandra Mohan (23 February 2002, Channel NewsAsia). Retrieved 26 November 2007.
- ↑ "Annual report 1984". Singapore: Mass Rapid Transit Corporation. Page 5.
- ↑ Mass Rapid Transit Corporation, Singapore 1988, page 10.
- ↑ Sharp 2005, p. 109.
Corporate and governmental sources
- Sharp, Ilsa (2005). The Journey — Singapore's Land Transport Story. SNP:Editions. ISBN 981-248-101-X.
- Mass Rapid Transit Corporation, Singapore (1988). The MRT Story. ISBN 981-00-0251-3.
Railway Lines in Singapore | [ V • T • E ] | |
---|---|---|
Mass Rapid Transit (MRT) | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line | |
FutureJurong Region Line • Cross Island Line | ||
Light Rail Transit (LRT) | Bukit Panjang LRT • Sengkang LRT • Punggol LRT | |
Cross-border | KTM Intercity | |
FutureJohor Bahru–Singapore Rapid Transit System | ||
Others | Changi Airport Skytrain • Sentosa Express | |
DefunctSentosa Monorail |
Mass Rapid Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line
FutureJurong Region Line • Cross Island Line | |
Rolling Stocks | 151 • 151A • 151B • 151C • R151 • T251 • 751A • 751B • 751C • 830 • 830C • 851E • 951
Former651 Future J151 • CR151 | |
Depots | Bishan • Changi • Gali Batu • Kim Chuan • Mandai • Sengkang • Ulu Pandan • Tuas | |
Future Changi East • East Coast • Tengah |