Difference between revisions of "Thomson–East Coast Line"

From SgWiki
Jump to navigation Jump to search
Line 43: Line 43:
{{Stnline|{{Code/S|TE7|TEL|rr=0|br=none}}{{Code/F|CR13|CRL|rl=0|bl=none}}|Bright Hill|TEL|Sin Ming|Future Interchange with {{CRL}}}}
{{Stnline|{{Code/S|TE7|TEL|rr=0|br=none}}{{Code/F|CR13|CRL|rl=0|bl=none}}|Bright Hill|TEL|Sin Ming|Future Interchange with {{CRL}}}}
{{Stnline|{{Code/S|TE8|TEL}}|Upper Thomson|TEL}}
{{Stnline|{{Code/S|TE8|TEL}}|Upper Thomson|TEL}}
{{Stnline|{{Code/S|TE9|TEL|rr=0|br=none}}{{Code/S|CC17|CCL|rl=0|bl=none}}|Caldecott|TEL|Note=Termins<br>Interchange with {{CCL}}}}
{{Stnline|{{Code/S|TE9|TEL|rr=0|br=none}}{{Code/S|CC17|CCL|rl=0|bl=none}}|Caldecott|TEL|Note=Terminus<br>Interchange with {{CCL}}}}
|-
|-
!colspan=5 style="{{CSS/TEL|s=|t=}}"|[[File:MRTFFF.png|18px|link=|alt=]] {{TEL|b=}} (Stage 3)
!colspan=5 style="{{CSS/TEL|s=|t=}}"|[[File:MRTFFF.png|18px|link=|alt=]] {{TEL|b=}} (Stage 3)

Revision as of 08:12, 29 August 2021


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

TE
Thomson–East Coast Line
汤申–东海岸线
தாம்சன்–ஈஸ்ட் கோஸ்ட் வரி
TEL Map.png
Statistics
Status Partial Opened
Termini Woodlands North
Sungei Bedok
Stations 32
Services 1
Operator(s) SMRT Trains
Rolling stock CT251
Line length 43 km
Track gauge 1,435 mm standard gauge
Electrification 750V DC Third rail

Thomson–East Coast Line (TEL) is the sixth Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 23 minutes. The line is currently 16.2 km long with 9 stations and it is fully underground and automated. When completed in 2024, the line will be 43 km long with 31 stations.

History

Date Event
31 January 2020 Woodlands North - Woodlands South
28 August 2021 Springleaf - Caldecott

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:MRTFFF.png Thomson–East Coast Line
TE1RTS Woodlands North Woodlands North-TEL.png Woodlands North Terminus
Future connection to Johor Bahru–Singapore Rapid Transit System
TE2NS9 Woodlands Woodlands-TEL.png Woodlands Interchange with North–South Line
TE3 Woodlands South Woodlands South-TEL.png Woodlands South
TE4 Springleaf Springleaf-TEL.png Springleaf
TE5 Lentor Lentor-TEL.png Lentor
TE6 Mayflower Mayflower-TEL.png Mayflower
TE7CR13 Bright Hill Bright Hill-TEL.png Sin Ming Future Interchange with Cross Island Line
TE8 Upper Thomson Upper Thomson-TEL.png Upper Thomson
TE9CC17 Caldecott Caldecott-TEL.png Caldecott Terminus
Interchange with Circle Line
File:MRTFFF.png Thomson–East Coast Line (Stage 3)
TE10 Mount Pleasant Mount Pleasant
TE11DT10 Stevens Stevens Interchange with Downtown Line
TE12 Napier Napier
TE13 Orchard Boulevard Orchard Boulevard
TE14NS22 Orchard Orchard Interchange with North–South Line
TE15 Great World Great World
TE16 Havelock Havelock
TE17EW16NE3 Outram Park Outram Park Interchange with East–West Line or North East Line
TE18 Maxwell Maxwell
TE19 Shenton Way Shenton Way
TE20NS27CE2 Marina Bay Marina Bay Interchange with North–South Line or Circle Line
TE21 Marina South Marina South
TE22 Gardens by the Bay Gardens by the Bay
File:MRTFFF.png Thomson–East Coast Line (Stage 4)
TE22A Founders' Memorial Founders' Memorial
TE23 Tanjong Rhu Tanjong Rhu
TE24 Katong Park Katong Park
TE25 Tanjong Katong Amber
TE26 Marine Parade Marine Parade
TE27 Marine Terrace Marine Terrace
TE28 Siglap Siglap
TE29 Bayshore Bayshore
File:MRTFFF.png Thomson–East Coast Line (Stage 5)
TE30 Bedok South Bedok South
TE31DT37 Sungei Bedok Sungei Bedok Terminus
Interchange with Downtown Line

Rolling stock

The rolling stock consists of Kawasaki Heavy Industries & CRRC Qingdao Sifang CT251 trains. These trains operate from Mandai Depot near Woodlands South station, and will operate from East Coast Integrated Depot near Sungei Bedok station.

References


icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Thomson–East Coast Line [ VTE ]
Stations Woodlands NorthWoodlandsWoodlands SouthSpringleafLentorMayflowerBright HillUpper ThomsonCaldecottMount PleasantStevensNapierOrchard BoulevardOrchardGreat WorldHavelockOutram ParkMaxwellShenton WayMarina BayMarina SouthGardens by the BayFounders' MemorialTanjong RhuKatong ParkTanjong KatongMarine ParadeMarine TerraceSiglapBayshoreBedok SouthSungei Bedok
Rolling Stock T251
Depots MandaiEast Coast
Others Bridging Service