Tuas West Road station
Jump to navigation
Jump to search
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
![]()
![]()
![]()
![]() |
Tuas West Road 大士西路 துவாஸ் வெஸ்ட் ரோடு EW32 Abbr: TWR ![]() |
|
Address | 131 Pioneer Road Singapore 639609 |
---|---|
Line(s) | East–West Line |
Structure | Elevated |
Connections | ![]() ![]() |
Tuas West Road (EW32) is a Mass Rapid Transit (MRT) station on the East–West Line in Tuas. It was built by China Railway 11 Bureau Group Corporation under Contract 1686. The colour scheme used for the station is brown.
Entrances/Exits
Exit | Nearby Point of Interest |
---|---|
A |
Pioneer Road, Tuas West Road, Tuas Avenue 20 |
B |
Pioneer Road, Tuas West Road, Tuas Avenue 12 |
First/Last Train Timing
➔ Train to |
First Train | Last Train | ||
---|---|---|---|---|
Weekday/Sat | Sun/P.H. | Daily | ||
EWL ![]() | ||||
EW1 |
05:21 | 05:51 | 23:21 | |
EW33 |
05:53 | 06:05 | 00:46 |
Note: Please enquire at the Passenger Service Centre for train connections.
Layout
L3 |
|
||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||
|
|||||||||||||||||||
L2 | Concourse | Faregates, Ticketing Machines, ![]() Passenger Service Centre | |||||||||||||||||
L1 | Street Level |
Schematic Track Diagram
EW31 |
EW32 |
EW33 |
Bus Connections
➔

Rail Disruption Guide
Bridging Service:
- EW124719Tuas West Rd Stn Exit A
Pioneer Rd - EW3324711Tuas West Rd Stn Exit B
Pioneer Rd
Bus Stop | Exit | Bus Service |
---|---|---|
![]() 24719 Tuas West Rd Stn Exit A Pioneer Rd |
A |
|
![]() 25691 Aft Tuas West Rd Stn Tuas Ave 20 |
A |
|
![]() 24711 Tuas West Rd Stn Exit B Pioneer Rd |
B |
History
Date | Event |
---|---|
18 June 2017 | Station officially opened[1] |
16 - 19 November 2017 | Station closed due to the Joo Koon train collision[2] |
10, 17 December 2017 | Station closed due to the upgrading of signaling system on the East–West Line[3] |
14, 21, 28 March 2021 4, 11, 18, 25 April 2021, 2, 9, 16, 23 May 2021 |
Station closed due to the replacement of electrical cable on the East–West Line[4] |
Construction
Contract 1686 consists of viaducts between Tuas West Road and Tuas Link, as well as Tuas West Road and Tuas Link stations, was awarded to China Railway 11 Bureau Group Corporation in November 2011.
References
- ↑ 4 MRT stations on Tuas West Extension to open on June 18. Chew Hui Min (The Straits Times, 27 April 2017). Archived on 1 September 2017.
- ↑ Joo Koon collision: Tuas West Extension train services suspended until Sunday for further checks. Channel NewsAsia (16 November 2017). Archived on 16 November 2017.
- ↑ 2 full-day shutdowns, shorter operating hours for 19 NSEWL MRT stations in December: LTA, SMRT. Lianne Chia (Channel NewsAsia, 21 November 2017). Archived on 1 December 2017.
- ↑ Selected East-West Line MRT stations to close on Sundays for cable replacement works. Channel NewsAsia (2 March 2021). Archived on 23 September 2021.
![]() |
[ V • T • E ] | |
---|---|---|
Stations | Pasir Ris • Tampines • Simei • Tanah Merah • Bedok • Kembangan • Eunos • Paya Lebar • Aljunied • Kallang • Lavender • Bugis • City Hall • Raffles Place • Tanjong Pagar • Outram Park • Tiong Bahru • Redhill • Queenstown • Commonwealth • Buona Vista • Dover • Clementi • Jurong East • Chinese Garden • Lakeside • Boon Lay • Pioneer • Joo Koon • Gul Circle • Tuas Crescent • Tuas West Road • Tuas Link
Changi Airport ExtensionTanah Merah • Expo • Changi Airport | |
Rolling Stock | 151 • 151A • 151B • 151C • R151 | |
Depots | Changi • Ulu Pandan • Tuas • East Coast | |
Others | Bridging Service |