Sengkang Depot

From SgWiki
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Sengkang Depot
盛港车厂
செங்காங்ப பணிமனை
Statistics
Address 91 Sengkang East Avenue
Singapore 545072
Line(s) North East Line
Sengkang LRT
Punggol LRT
Rolling Stock(s) C751A
C751C
C810
C810A

Sengkang Depot is the fifth train depot in Singapore, and the first depot to share common stabling area for both Mass Rapid Transit (MRT) and Light Rail Transit (LRT) trains. It maintains trains for the North East Line, Sengkang LRT and Punggol LRT and also houses the control centre of the three lines.

History

Date Event
18 January 2003 Depot officially opens

2020 train disruption

On 27 February 2020, a power fault along the North East Line (NEL) resulted in service disruptions between Serangoon and Punggol stations. At 5.35am, a shuttle train service was provided which operated on a single platform between Buangkok and Punggol stations. In order to facilitate maintenance functions, the power source to the tracks between Hougang and Punggol stations was switched off. Additionally, free regular and bridging bus services have been provided to serve these stations. Train service resumed at 12.15pm.[1] Investigations later revealed that a broken contact wire affected the power source to trains launching from Sengkang Depot, causing the service disruptions.[2]

Reception Tracks

On the North East Line, it has 3 reception tracks, 2 that lead to Sengkang station and 1 to Hougang station.

On the Sengkang LRT and Punggol LRT, it has 2 reception tracks, 1 that lead towards Tongkang station and 1 to Layar station.

References

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction
icon North East Line [ VTE ]
Stations HarbourFrontOutram ParkChinatownClarke QuayDhoby GhautLittle IndiaFarrer ParkBoon KengPotong PasirWoodleighSerangoonKovanHougangBuangkokSengkangPunggol
North East Line extension: Punggol Coast
Rolling Stock 751A751C851E
Depots Sengkang
Others Bridging Service
icon Sengkang LRT [ VTE ]
Stations Sengkang
East LoopCompassvaleRumbiaBakauKangkarRanggung
West LoopCheng LimFarmwayKupangThanggamFernvaleLayarTongkangRenjong
Rolling Stock 810810A810D
Depots Sengkang
Others Bridging Service
icon Punggol LRT [ VTE ]
Stations Punggol
East LoopCoveMeridianCoral EdgeRivieraKadaloorOasisDamai
West LoopSam KeeTeck LeePunggol PointSamuderaNibongSumangSoo Teck
Rolling Stock 810810A810D
Depots Sengkang
Others Bridging Service