!
|
TRAVEL ADVISORY
|
!
|
- From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.
- Train services will be extended on the eve of Christmas (Tuesday, 24 December 2024), and on the eve of New Year (Tuesday, 31 December 2024). Selected bus service will be extended to coincide with the last train timings. There will also be a change in selected bus service operating timing. Please refer to the following for more information:
- From 22 December 2024, bus service 193 will serve an additional bus stop along Benoi Road, opposite Joo Koon Interchange. Please refer here for more information.
- From Thursday, 2 January 2025, City Direct Services 675, 676, 677 & 678 will be introduced to provide a faster connection to the city for commuters along the North-East Corridor. Please refer here for more information.
- From Sunday, 12 January 2025, bus service 967 will be introduced to enhance connectivity for commuters in Marsiling and Admiralty to nearby transport nodes and local amenities in Woodlands. Please refer here for more information.
- From Monday, 13 January 2025, bus service 912M will be withdrawn with the introduction of new bus service 967 under the Land Transport Authority’s Bus Connectivity Enhancement Programme (BCEP). Please refer here for more information.
|
EW4CG Tanah Merah 丹那美拉 தானா மேரா*Graphic From SGTrains/Wikipedia/LTA
|
Statistics
|
Address
|
920 New Upper Changi Road Singapore 467356
|
Line(s)
|
East–West Line
|
Structure
|
Elevated
|
Connections
|
|
Abbreviation
|
TNM
|
Tanah Merah (EW4/CG) is a Mass Rapid Transit (MRT) station on the East–West Line. The station is the only interchange station not to be part of two or more lines, due to it being an interchange between the main line and its extension.
Similar to other stations on the eastern section of the East–West Line, the station's design consists of white-washed walls and a dome-shaped ceiling, with a glass roof running along the middle of the station.
History
Date |
Event
|
4 November 1989 |
Station officially opened
|
Tanah Merah Modification Project
The Tanah Merah Modification Project (TMMP) was announced by Land Transport Authority (LTA) on 25 August 2014 which consists of an additional track and platform to allow trains arriving and departing towards Changi Airport at a shorter intervals.[1] When completed in 2024, it will be the second station to have triple island platforms after Jurong East.
Layout
L2
|
|
Platform A/C
|
|
Platform B/D
|
|
L1
|
Concourse
|
Faregates, Ticketing Machines, Passenger Service Centre
|
Street Level
|
|
B1
|
Underpass
|
|
Exits
Exit |
Disabled-Access |
Location/Nearby
|
A |
|
New Upper Changi Road, APSN Katong School, Bedok View Secondary School
|
B |
|
New Upper Changi Road
|
Transport Services
First/Last Train Timing
Bus
- More travel information: Alternative Travel Method
References