Difference between revisions of "History of the Mass Rapid Transit"

From SgWiki
Jump to navigation Jump to search
 
(47 intermediate revisions by 11 users not shown)
Line 1: Line 1:
'''The history of the [[Mass Rapid Transit (Singapore)|Mass Rapid Transit]] system of Singapore''' commences with its planning in the 1960s, leading to its opening in 1987 with the launch of the 6 km section of the [[North South Line]] from [[Yio Chu Kang MRT Station|Yio Chu Kang Station]] to [[Toa Payoh MRT Station|Toa Payoh Station]]. It now has 4 lines in operation with a total combined route length of 129.7 km and 79 stations. The [[Light Rail Transit (Singapore)|Light Rail Transit]] which opened in 1999 acts as a feeder service to the MRT network.
{|class="wikitable" style="border-collapse:collapsed;width:100%;"
 
|-
==Construction of backbone network==
!width=40|Year!!width=110|Date!!Event
===Conceptualisation===
|-
The idea of constructing a rapid transit line in the country was initiated in 1967, when a four year State and City Planning study conducted by the Singapore government and the United Nations Development Programme. It was part of an urban renewal and development project which aimed to formulate a long-term comprehensive concept plan for guiding the country's future physical development. It was concluded that physical land constraints faced by the island nation, was not able to accommodate more roads to meet the rise in transportation demands. It was noted that the city state needed a rail transit system by 1992. [http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.119.9246 (1)]
|1967||{{N/A}}||Conceptualise of a Rapid Transit Line to ease road congestion issue.<ref>Tien Fang Fwa. [http://csur.t.u-tokyo.ac.jp/ws2004/papers/B2-Fwa.pdf "SUSTAINABLE URBAN TRANSPORTATION PLANNING AND DEVELOPMENT — Issues and Challenges for Singapore"]. 4 Sep 2004. Retrieved 1 May 2006. University of Tokyo. Archived from the [http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.119.9246 original].</ref>
 
|-
===Bus vs. rail debate===
|1972-1982||{{N/A}}||Bus vs Rail Debates.
It took 10 years since 1972 to design the MRT system, which continued all the way until the government gave permission to build the MRT.
|-
 
|1982||28 March||Government decided to build the MRT.
Between 1972 and 1980, the participants of the study was the late President [[Ong Teng Cheong]]. He was then a member of the Ministry of National Development's Planning Department, after returning from overseas studies that same year. He became a fervent supporter and advocate of a rail based system; being an architect and an urban planner placed him in good stead. During the study, other countries were visited to study the technology and efforts needed to build the MRT system.
|-
 
|rowspan=2|1983||14 October||Established the then MRT Corporation (Now Land Transport Authority).
When he became the then-Minister for Communications (now the Ministry of Transport), he had to convince the cabinet in a debate in early 1980, that the S$5 billion needed for the system would be beneficial for the long-term development of Singapore. He argued that
|-
:''"this is going to be the most expensive single project to be undertaken in Singapore. The last thing that we want to do is to squander away our hard-earned reserves and leave behind enormous debt for our children and our grandchildren. Now since we are sure that this is not going to be the case, we'll proceed with the MRT, and the MRT will usher in a new phase in Singapore's development and bring about a better life for all of us."''
|22 October||Ground-breaking ceremony at Shan Road.
 
|-
Therefore, a provisional Mass Rapid Transit Authority was established in July 1980, after the debate. However, Mr Ong faced strong opposition from other members of the cabinet, by Finance Minister [[Goh Keng Swee]], due especially to the heavy investments involved. A team of specialists from Harvard University, recommended that an all-bus system would be sufficient into the 1990s, and would cost 50% less than a rail-based system.
|rowspan=4|1987||6 August||SMRT Corporation was established.
 
|-
Later on, two independent American transport and urban planning specialist teams were then appointed by the government to conduct their own independent reviews as part of the Comprehensive Traffic Study in 1981. This debate was also brought to national television in September 1980, which was rare at that time. The study came to a conclusion that an all-bus system would be inadequate as it would have to compete for road space which would have been increasingly overcrowded by then. The problem would be solved by building a rail system. Mr Ong hence declared in triumph on 28 March 1982, that
|rowspan=2|7 November||{{NSL}} began operation.
:''"the Government has now taken a firm decision to build the MRT. The MRT is much more than a transport investment, and must be viewed in its wider economic perspective. The boost it'll provide to long term investors' confidence, the multiplier effect and how MRT will lead to the enhancement of the intrinsic value of Singapore's real estate are spin-offs that cannot be ignored."''
|-
 
|style="background-color:#F6B4B0"|{{Stn|Yio Chu Kang}} to {{Stn|Toa Payoh}} were opened.
===Construction begins===
|-
The permission to begin the construction of Singapore's then-largest public works project was given in May 1982. A ground-breaking ceremony commenced the construction on 22 October 1983 at Shan Road. The majority of the work was expected to be completed in 1992. This included 67&nbsp;km of track to be constructed, with 42 stations, of which 26 would be elevated, 1 at grade and 15 underground. The network was constructed in stages, with the [[North South Line]] given priority as the line passed through the Orchard Road corridor as well as the Central Area, both of which faced a high demand for public transport. Also, it was near the more densely populated housing estates such as [[Toa Payoh]] and [[Ang Mo Kio]]. The MRT Corporation, now [[Land Transport Authority]], was established on 14 October 1983, taking over the roles and responsibilities of the former provisional Mass Rapid Transit Authority. On 6 August 1987, it set up [[SMRT Corporation]].
|12 December||style="background-color:#F6B4B0"|{{Stn|Novena}} to {{Stn|Outram Park}} were opened.
 
|-
===Initial opening===
|rowspan=3|1988||12 March||style="background-color:#F6B4B0"|{{Stn|Tiong Bahru}} to {{Stn|Clementi}} were opened.
On 7 November 1987, the first 6 kilometres of the [[North South Line]] from [[Yio Chu Kang MRT Station|Yio Chu Kang]] to [[Toa Payoh MRT Station|Toa Payoh]] went into operation. The novelty resulted in thousands flocking to the 5 station segment of the line just to experience and try out the system. At the launching of [[Toa Payoh MRT Station|Toa Payoh Station]], Mr Ong was quoted as saying that
|-
 
|5 November||style="background-color:#F6B4B0"|{{Stn|Jurong East}} to {{Stn|Lakeside}} were opened.
:''"this is like a 20-year affair from conception to delivery. Now the baby is born, to say that I am happy and pleased is an understatement."''
|-
 
|20 December||style="background-color:#F6B4B0"|{{Stn|Khatib}} to {{Stn|Yishun}} were opened.
Nine more stations from [[Novena MRT Station|Novena]] to [[Outram Park MRT Station|Outram Park]] were officially opened 12 December 1987 by then Deputy Prime Minister [[Goh Chok Tong]]. These trains ran as a through service from one end to the other even though [[Tanjong Pagar MRT Station|Tanjong Pagar]] and [[Outram Park MRT Station|Outram Park]] were on the [[East West Line]].
|-
 
|rowspan=5|1989||rowspan=4|4 November||{{EWL}} began operation.
On 12 March 1988, with the opening of six more stations from [[Tiong Bahru MRT Station|Tiong Bahru]] to [[Clementi MRT Station|Clementi]] on the [[East West Line]], [[City Hall MRT Station|City Hall]] and [[Raffles Place MRT Station|Raffles Place]] become interchange stations between the two lines. On the same day, the system was officially launched by Mr [[Lee Kuan Yew]], then Prime Minister of Singapore.
|-
 
|Separation of {{NSL}} and {{EWL}}.
===Nearing completion===
|-
The rest of the system opened rapidly in stages.
|style="background-color:#F6B4B0"|{{Stn|Marina Bay}} was opened.
* 5 November 1988: Three stations on [[East West Line]] from [[Jurong East MRT Station|Jurong East]] to [[Lakeside MRT Station|Lakeside]] were opened.
|-
* 20 December 1988: Two stations on [[North South Line]] from [[Khatib MRT Station|Khatib]] to [[Yishun MRT Station|Yishun]] were opened, completing the Northern section of the line.
|style="background-color:#A6FFC9"|{{Stn|Bugis}} to {{Stn|Tanah Merah}} were opened.
* 4 November 1989: [[Marina Bay MRT Station|Marina Bay]], the last station on the [[North Line]], was opened. Also opened were nine stations on the [[East West Line]] from [[Bugis MRT Station|Bugis]] to [[Tanah Merah MRT Station|Tanah Merah]]. Hence forth, the system started to run as a two-line system, with the 2-level interchanges coming into full operation at [[City Hall MRT Station|City Hall]] and [[Raffles Place MRT Station|Raffles Place]].
|-
* 16 December 1989: Three stations on [[East West Line]] from [[Simei MRT Station|Simei]] to [[Pasir Ris MRT Station|Pasir Ris]] were opened, completing the Eastern section of the line.
|16 December||style="background-color:#A6FFC9"|{{Stn|Simei}} to {{Stn|Pasir Ris}} were opened.
* 10 March 1990: Three stations on a [[Branch Line]] starting from [[Jurong East MRT Station|Jurong East]] to [[Choa Chu Kang MRT Station|Choa Chu Kang]] were opened.
|-
* On 6 July 1990, the last station on the [[East West Line]], [[Boon Lay MRT Station|Boon Lay]], was opened, which marked the completion of the system two years ahead of schedule.
|rowspan=3|1990||rowspan=2|10 March||{{EWL}} (Branch Extension) began operation.
 
|-
==Subsequent extensions==
|style="background-color:#A6FFC9"|{{Stn|Bukit Batok}} to {{Stn|Choa Chu Kang}} were opened.
===North South Line Woodlands Extension===
|-
Less than a year after the completion of the MRT project, the government announced in February 1991 their intentions to extend the system to [[Woodlands]]. Construction commenced in 1993, and the 16 km, 6 station elevated line was opened on 10 February 1996 at a total cost of S$1.2 billion. With this extension, the [[North South Line]] included the three stations on the former Choa Chu Kang Branch Line, forming a continuous line from [[Jurong East MRT Station|Jurong East]] to [[Marina Bay MRT Station|Marina Bay]].
|6 July||style="background-color:#A6FFC9"|{{Stn|Boon Lay}} was opened.
 
|-
The construction of the extension was not without political fallout. For a long time, the politicians representing residences in the North-East area of the island had been calling for the construction of a planned [[North East Line]]. The announcement of the Woodlands Extension led to protests especially from opposition members of parliament, in particular from [[Chiam See Tong]] and [[Low Thia Khiang]], representatives of [[Potong Pasir]] and [[Hougang]] constituencies respectively, with both areas potentially benefiting from such a line. The opposition members accused the government of favouring the Woodlands Extension over the [[North East Line]] due to opposition representation in the north-east area, arguing that there were far more residents in the north-east compared to the north, and questioned the rationale of building the Woodlands extension when the north was relatively undeveloped. [[Woodlands]] was only half completed, and [[Sembawang]] was still in the planning stage at that time.
|1993||{{N/A}}||Construction began for {{NSL}} (Woodlands Extension).
 
|-
More than a decade later, however, when the disputes with Malaysia over the railway land used by KTM escalated, it came to the fore that one of the criteria the Malaysian authorities had listed before they would consider shifting the existing railway station away from [[Tanjong Pagar]] was for the MRT system to be introduced to [[Woodlands]]. On 16 October 2003, in response to a question fielded in parliament, Professor S. Jayakumar, then Minister for Foreign Affairs, mentioned, that the Points of Agreement concluded between the two sides on 27 November 1990 included a clause stating that KTM will shift the station to a site adjacent or close to the [[Woodlands MRT Station]] within five years from the day the MRT to [[Woodlands]] is opened, something the KTM had not yet done.
|rowspan=3|1996||rowspan=3|10 February||{{NSL}} (Woodlands Extension) began operation.
 
|-
Considering that the Points of Agreement was made in the year 1990, and followed quickly by an announcement to build the MRT line a year later in 1991, there is a possibility that the line was given priority over the [[North East Line]] due more to international and local political concerns than economic considerations alone.
|{{EWL}} (Branch Extension) dissolved into {{NSL}}.
 
|-
===Expo Station===
|style="background-color:#F6B4B0"|{{Stn|Yew Tee}} to {{Stn|Sembawang}} were opened.
The '''[[Expo MRT Station|Expo Station]]''' opened on 10 January 2001, sporting a "space age" architecture designed by world renowned architect Sir Norman Foster. The roof is clad in titanium and its design enabled the platform to be free of any columns, freeing up space in a station which will be used by thousands of visitors to the massive 100,000 square metre [[Singapore Expo]] next door.
|-
 
|1997||1 January||Construction began for {{NEL}}.
===Dover Station===
|-
The '''[[Dover MRT Station|Dover Station]]''', built on the [[East West Line]] between the [[Clementi MRT Station|Clementi]] and the [[Buona Vista MRT Station|Buona Vista]], was opened on 18 October 2001. The first station to be built over an operating rail line with no disruptions to train services (although trains drove by the site at a reduced speed during the construction phase), it was also the first elevated station with two side platforms on either side of the tracks, as opposed to having an island platform as in all other elevated stations.
|1998||December||Construction began for {{EWL}} (Changi Airport Extension).
 
|-
Adjacent to the [[Singapore Polytechnic]] on one side, and undeveloped land on the other, the building of the station was met with reservations by some members of the public over its low catchment area. There were criticisms over the spending of "taxpayers' money" chiefly for use only by students of one educational institution. The government proceeded with the construction anyway, citing the catchment area extends to public housing flats on either end of the polytechnic, and that the undeveloped land opposite is slated for extensive development, largely residential in nature. This station has indeed brought much convenience to the students at the polytechnic.
|rowspan=3|2001||rowspan=2|10 January||{{EWL}} (Changi Airport Extension) began operation.
 
|-
===Changi Airport Station===
|style="background-color:#A6FFC9"|{{Stn|Expo}} was opened.
For a long time following its opening in 1981, [[Singapore Changi Airport]] relied on taxis and buses as the primary means of public transportation to the rest of the country. They served the airport well, but concerns over competition from other regional airports, some of which feature quick rail-based services to their city centres, such as the one from Kuala Lumpur International Airport, accelerated the government's plan to build a rail link to the airport.
|-
 
|18 October||style="background-color:#A6FFC9"|{{Stn|Dover}} was opened.
Provision had long been made for a new line branching off from the existing [[East West Line]] at the [[Tanah Merah MRT Station]], with some conceptual plans showing a tentative route alignment to the airport along Airport Boulevard, continuing beyond the airport to Changi point, before turning southwest back toward the city along the east coast of the island. When the extension to the airport was finally announced, however, the route alignment showed a deviation from previous plans.
|-
 
|rowspan=2|2002||8 February||style="background-color:#A6FFC9"|{{Stn|Changi Airport}} was opened.
The final plan involved building only the first two stations, namely [[Expo MRT Station|Expo]], an elevated station directly adjacent to the [[Singapore Expo]], and [[Changi Airport MRT Station|Changi Airport]], an underground station built between Terminal Two and the since constructed Terminal Three. The alignment of the station at the airport was switched perpendicularly to an East-west direction, such that stairs and escalators lead to two of the terminals directly from either end of the station.
|-
 
|13 March||Construction began for {{CCL}}.
'''[[Changi Airport MRT Station|Changi Airport Station]]''' was opened on 8 February 2002, giving the airport its first rail link after less than 21 years of operations. Initially through services were operated from the airport to Boon Lay at the other end of the East West line, however due to ridership falling below expectations the service was reverted to shuttle mode in 2003.
|-
 
|rowspan=2|2003||rowspan=2|20 June||{{NEL}} began operation.
===North East Line===
|-
The '''[[North East Line]]''', the first line operated by [[SBS Transit]] and among the first fully automated heavy rail lines in the world, opened on 20 June 2003. System problems delayed the line six months from the scheduled opening date of December 2002. The construction period of the North East line was fraught with many delays and some budget problems. It marked the pinnacle of a long and chequered history of over two decades since the conception of the line had taken place along with that of the original system which was eventually completed in 1990. As of May 2005, the line was still running at a deficit, and the line operator, SBS Transit, turns an overall profit because the profits from its public bus service exceed the losses from operation of the North East line. Running from [[HarbourFront MRT Station|HarbourFront]] where Singapore's former World Trade Centre building lies to [[Punggol MRT Station|Punggol]] to the northeast of the island, this line allowed for previously isolated or distanced areas to be linked up with the rest of Singapore by rail. The trains on the North East line are driverless and fully automated.
|style="background-color:#E7B9F0"|{{Stn|HarbourFront}} to {{Stn|Punggol}} were opened.
 
|-
===East West Line Boon Lay Extension===
|rowspan=2|2004||20 April||Nicoll Highway collapsed during the construction of {{Stn|Nicoll Highway| station}}.
On 28 February 2009, the 3.8 km Boon Lay Extension to the East West Line comprising 2 stations [[Pioneer MRT Station|Pioneer]] and [[Joo Koon MRT Station|Joo Koon]] commenced passenger service.
|-
 
|December||Construction began for {{EWL}} (Boon Lay Extension).
===Circle Line===
|-
On 28 May 2009, the 5.6 km of the [[Circle Line]] has been opened from [[Bartley MRT Station]] to [[Marymount MRT Station]]. On 17 April 2010, the other 11.1 km of the Circle Line from [[Bartley MRT Station|Bartley]] to [[Dhoby Ghaut MRT Station|Dhoby Ghaut]] commenced operation. On 8 October 2011, the other 16.6 km of the Circle Line from [[Marymount MRT Station]] to [[HarbourFront MRT Station]] commenced operation. On 14 January 2012, the other 2.4 km of the Circle Line from [[Promenade MRT Station]] to [[Marina Bay MRT Station]] commenced operation.
|2006||15 January||style="background-color:#E7B9F0"|{{Stn|Buangkok}} was opened.
 
|-
==History of the system map==
|2008||December||Construction began for {{DTL}}.
===1987 to 1996===
The MRT was a very recent addition for Singapore and as such, the authorities wanted to keep the MRT map as easy to use for Singaporeans as possible. Hence, each direction of travel was colour coded in a different colour as though it were a line on its own. In that way, confusion in decision-making when taking a certain line in a certain direction would be reduced for passengers. However, this reduced the amount of colours available for new lines and was not in line with international practice.
 
Previously, each direction of travel on the MRT was denoted on system maps as a different colour.
* Northbound services were denoted in yellow
* Southbound services in red
* Eastbound services in green
* Westbound services in blue
* Northbound Choa Chu Kang Branch Line services in khaki
* Southbound Choa Chu Kang Branch Line services in brown
 
Each station was also assigned a unique alphanumeric code, with the alphabet indicating which part of the island the station lies at (North, East, West, Central, Marina Bay region or Choa Chu Kang Branch Line) & the numbers (in ascending order from the centre of the island) indicating which part of that region the station is located at.
* Stations from Bugis to Pasir Ris denoted by codes E1 to E12
* Stations from Tanjong Pagar to Boon Lay denoted by codes W1 to W12
* City Hall Station, Raffles Place Station & Marina Bay Station denoted as C2, C1 & M1 respectively
* Stations from Dhoby Ghaut to Yishun denoted by codes N1 to N12
* Stations from Bukit Batok to Choa Chu Kang denoted by codes B1 to B3
 
===1996 to 30 July 2001===
The colour and alphanumeric codes for each direction of travel remained unchanged, except that with the opening of the Woodlands Extension (connecting Yishun station to Choa Chu Kang station), the Jurong East – Choa Chu Kang Branch Line ceased to exist. As such, the formerly Northbound Choa Chu Kang Branch Line services in orange travelled southbound to Marina Bay & as such were denoted as red while the formerly Southbound Choa Chu Kang Branch Line services in brown originated from Marina Bay, hence having travelled northbound it was denoted as yellow. The alphanumeric codes for these stations were also replaced. Expo station which opened in 2001, was denoted by the code E13 for a short while.
 
The Bukit Panjang LRT opened in 1999 and was given the colors purple and orange to represent its direction of travel. Due to the alignment of the route, which was a loop track around Bukit Panjang New Town, the map was different. The stations were given the alphanumeric code A1 to A14, with numbering starting from Choa Chu Kang interchange and going anti-clockwise direction on the loop. The directional arrow on the shared service track (between stations A1 to A6) was split, half purple coloured and half orange coloured. From Bukit Panjang station, the orange arrows travelled in an anti-clockwise direction [(service B) via [[Petir LRT Station|Petir]]] while the purple arrows travelled in a clockwise direction [(service A) via [[Senja LRT Station|Senja]]]
 
===31 July 2001 to date===
Because of an expanding rail network, the MRT System Map could no longer afford to have each direction of travel represented by a different colour. Eventually, the map would run out of colours to use to represent each direction of travel. This was the main reason behind the revamp. Using the acclaimed London Underground Map as a reference, the MRT System Map was revamped.
 
Colours were used to represent each line rather than each direction of travel, cutting the usage of colours by half and preserving other colours for future lines.
* Red for [[North South Line]]
* Green for [[East West Line]]
* Purple for [[North East Line]]
* Orange for [[Circle Line]]
* Blue  for the future [[Downtown Line]]
* Grey for all LRT lines
 
The direction of travel was instead represented by numbers contained within a coloured circle located at the ends of each line, known as the destination number.
* The numbers 1, 2 and 3 contained within a green circle represent [[East West Line]] services travelling towards Pasir Ris Station, Joo Koon and Changi Airport respectively.
* 4 and 5 on red for [[North South Line]] services towards Jurong East and Marina Bay respectively.
* 6 and 7 on purple for [[North East Line]] services towards HarbourFront and Punggol respectively.
* 8, 9 and 10 on orange for [[Circle Line]] services towards Dhoby Ghaut, HarbourFront and Marina Bay respectively.
* 11 and 12 on brown for [[Downtown Line]] services towards Bukit Panjang and Expo respectively.
 
Services towards Tanah Merah are not given a number. This is because when this system map was implemented, it was planned for through services to Changi Airport from Boon Lay and vice versa. Though shuttle services replaced it in 2003 due to low ridership of this service, it was decided that this system was preserved.
 
Like before, each station was assigned a unique alphanumeric symbol. However under this revamped system map, the letter in each symbol denotes the line (rather than the region of Singapore the station was in) and the number increases in ascending order from East to West (East West Line), North to South (North South Line), towards the North East (North East Line), in an anti clockwise direction (Circle Line) and in an clockwise direction (Downtown Line). Interchange stations will then have at least two codes. For example, [[City Hall MRT Station|City Hall]] will have two codes, EW13 for the East West Line section and NS25 for the North South Line section.
 
==History of station and train announcements==
: ''Main articles: [[Announcement]]''
The on-board announcement system in every single SMRT train was introduced in 1994. [http://sgforums.com/forums/2080/topics/314020 (2)] Over time, however, sections of announcements were modified, and finally, the entire announcement system was changed in January 2008. The new announcement system features a new voice, and a new chime before each announcement.
 
===1987 to 2008===
From 1987 to 1994, there were no on-board announcements, except for Jurong East Interchange announcements[http://www.youtube.com/watch?v=_a4S7wI8N0EU (3)]. Drivers had to make announcements themselves, especially when approaching stations. However, the buzzer played before train doors close was already in existence around that time (in the form of a repeated 'ding dong' chime without any voice announcement.)
 
From 1994 to 2008, the announcement system was very simple and featured to-the-point announcements. This is an example of a train's announcements between two stations.
 
{| border="1" cellpadding="5" cellspacing="0" align="center" style="text-align:centre"
|-
|-
! Conditions !! Before Announcement !! Annoucement !! After Annoucement (Actions)
|rowspan=5|2009||rowspan=2|28 February||{{EWL}} (Boon Lay Extension) began operation.
|-
|-
| Doors opened || Chime Plays || Doors closing. || Buzzer sounds, doors close, and train departs
|style="background-color:#A6FFC9"|{{Stn|Pioneer}} to {{Stn|Joo Koon}} were opened.
|-
|-
| Trains leaving the station || Chime Plays || Next Stop, Yio Chu Kang. || As train heading to Yio Chu Kang
|rowspan=2|28 May||{{CCL}} began operation.
|-
|-
| When Approaching Station || Chime Plays || Yio Chu Kang. (Pause) Yio Chu Kang. || Train stop, doors open
|style="background-color:#FFD7A0"|{{Stn|Bartley}} to {{Stn|Marymount}} were opened.
|-
|-
! colspan="4" | At interchange stations, there would be a suffix "Interchange" after the announcement of the station's name, and information on what trains to change to.
|December||Construction began for {{NSL}} Extension.
|-
|-
| When Approaching Station || Chime Plays || City Hall Interchange. Passengers going towards Bugis, Tanah Merah, or Pasir Ris, please cross the platform and transfer to another train. City Hall Interchange. || Train stop, doors open
|2010||17 April||style="background-color:#FFD7A0"|{{Stn|Dhoby Ghaut}} to {{Stn|Tai Seng}} were opened.
|-
|-
! colspan="4" | At Jurong East station, because the North South Line ended in the middle platform before 27 May 2011, the announcement would announce the destinations a passenger might go to for either side the doors would open on, if on the North South Line:
|rowspan=4|2011||20 June||style="background-color:#E7B9F0"|{{Stn|Woodleigh}} was opened.
|-
|-
| When Approaching Station || Chime Plays || Jurong East Interchange. This train terminates at this station. Passengers going towards City Hall, Pasir Ris, or Changi Airport, please cross the platform on the left and transfer to another train. Passengers going towards Chinese Garden, Lakeside, or Boon Lay, please cross the platform on the right and transfer to another train. Thank you for travelling with SMRT. Jurong East Interchange. || Train stop, doors open
|8 October||style="background-color:#FFD7A0"|{{Stn|Caldecott}} to {{Stn|HarbourFront}} were opened.
|-
|-
! colspan="4" | In 2002, the two-tone chime on the older trains was changed to the one that was used on the new [[C751B]] MRT trains.
|15 December||5-hours long disruption along {{NSL}} due to Train & Track Fault.
|-
|-
! colspan="4" | In 2003, after the opening of the North East Line, Dhoby Ghaut and Outram Park became interchanges, and the announcement was along the lines of:
|17 December||7-hours long disruption along {{NSL}} due to Train & Track Fault.
|-
|-
| Train leaving station || Chime Plays || Next stop, Outram Park Interchange. Passengers going towards Harbourfront or Punggol, please alight at the next stop. || Train heading Outram Park
|rowspan=2|2012||rowspan=2|14 January||{{CCL}} (Circle Line Extension) began operation.
|-
|-
| When Approaching Station || Chime Plays || Outram Park Interchange. Passengers going towards Harbourfront or Punggol, please alight and transfer to the North East Line. Outram Park Interchange. || Train stop, doors open
|style="background-color:#FFD7A0"|{{Stn|Bayfront}} to {{Stn|Marina Bay}} were opened.
|-
|-
! colspan="4" | In 2007, an additional "Please mind the platform gap" announcement was made after the station's name was announced for the second time, much similar to the announcements made in SBS Transit's North East Line trains do.
|rowspan=2|2013||rowspan=2|22 December||{{DTL}} began operation.
|}
 
The announcements were done by Juanita Melson. [http://www.youtube.com/watch?v=50DHvagm8so (4)]
 
===March 2008 to date===
In March 2008, the announcement system was revamped, and the voice making the announcement was also changed. The ding-dong two-tone chime was also changed to a deeper, longer, lower-pitched two-tone chime. The announcements were all changed, but somewhat followed the old system very closely.
 
{| border="1" cellpadding="5" cellspacing="0" align="center" style="text-align:centre"
|-
|-
! Conditions !! Before Announcement !! Annoucement !! After Annoucement (Actions)
|style="background-color:#A7D0FF"|{{Stn|Bugis}} to {{Stn|Chinatown}} were opened.
|-
|-
| Train doors opened || Chime Plays || Doors are closing. || Buzzer sounds, door closes and train departs
|rowspan=3|2014||January||Construction began for {{TEL}}.
|-
|-
| Train leaving station || Chime Plays || Next Station, Dover. (Ordinary stations without irregular interchanging functions only)
|rowspan=2|23 November||{{NSL}} ({{NSL|b=}} Extension) began operation.
|-
|-
| Train leaving station || Chime Plays || Next Station, Dhoby Ghaut. (Pause) Passengers who are continuing their journey on the [[Circle Line]] or [[North East Line]], please alight at the next station. (Irregular interchanges only)
|style="background-color:#F6B4B0"|{{Stn|Marina South Pier}} was opened.
|-
|-
| When Approaching Station (Elevated stations only))|| Chime Plays || Dover. (Pause) Dover. || Train stop, doors open
|rowspan=2|2015||7 July - 8 July||18-hours long disruption and delay along {{NSL}} and {{EWL}} due to Power Fault.
|-
|-
| When Approaching Station (Underground stations only))|| Chime Plays || Tanjong Pagar. (Pause) Tanjong Pagar. (pause) Please mind the platform gap. || Train stop, doors open
|27 December||style="background-color:#A7D0FF"|{{Stn|Bukit Panjang}} to {{Stn|Rochor}} were opened.
|-
|-
! colspan="4" | At interchange stations, however, the 'change to another train' announcement is completely different from the old announcement system.
|rowspan=5|2017||rowspan=2|18 June||{{EWL}} (Tuas West Extension) began operation.
|-
|-
| When Approaching Station || Chime Plays || Jurong East Interchange. This train service terminates at this station, Passengers who are continuing their journey towards the city, Pasir Ris or Changi Airport, please crossover to Platform B or C on the left. Passengers who are continuing their journey towards Joo Koon, please crossover to Platform F on the right. (Pause) Jurong East Interchange. || Train stop, doors open
|style="background-color:#A6FFC9"|{{Stn|Gul Circle}} to {{Stn|Tuas Link}} were opened.
|-
|-
| When Approaching Station || Chime Plays || Jurong East Interchange. Passengers who are continuing their journey towards Woodlands or Ang Mo Kio, please proceed to the middle platform.(Pause) Jurong East Interchange. || Train stop, doors open
|7 October - 8 October||21-hours long disruption along {{NSL}} due to Tunnel Flooding.
|-
|-
| When Approaching Station || Chime Plays || Raffles Place Interchange. Passengers who are continuing their journey towards Orchard, Yishun or Woodlands, please proceed to Platform B. Raffles Place Interchange. Please mind the platform gap. || Train stop, doors open
|21 October||style="background-color:#A7D0FF"|{{Stn|Fort Canning}} to {{Stn|Expo}} were opened.
|-
|-
| When Approaching Station || Chime Plays || Dhoby Ghaut Interchange. Passengers who are continuing their journey on the [[Circle Line]] or [[North East Line]], please alight. Dhoby Ghaut Interchange. Please mind the platform gap.
|{{N/A}}||Construction began for {{CCL}} (Stage 6).
|-
|-
! colspan="4" | When arriving a terminus station
|2019||2 November||style="background-color:#F6B4B0"|{{Stn|Canberra}} was opened.
|-
|-
| When Approaching Station (Elevated stations only) || Chime Plays || Joo Koon. This train terminates its service at this station. All passengers please alight. Thank you for travelling with SMRT. Joo Koon. || Train stop, doors open
|rowspan=2|2020||rowspan=2|31 January||{{TEL}} began operation.
|-
|-
| When Approaching Station (Underground stations only) || Chime Plays || Marina Bay. This train terminates its service at this station. All passengers please alight. Thank you for travelling with SMRT. Marina Bay. Please mind the platform gap. || Train stop, doors open
|style="background-color:#F3D1B0"|{{Stn|Woodlands North}} to {{Stn|Woodlands South}} were opened.
|-
|-
! colspan="4" | Sometimes after the "Next station" annoucement, the announcement will made as shown below.
|2021||28 August||style="background-color:#F3D1B0"|{{Stn|Springleaf}} to {{Stn|Caldecott}} were opened.
|-
|-
| Sometimes || Chime Plays || If you see any suspicious-looking person or article, please inform our staff or press the emergency communication button located at the side of the train doors.<br>如果您发现有任何行迹可疑的人物或任何遗留在车厢的可疑物品,请通知我们的职员或按车门旁边的紧急联络钮与我们通话。 | Jika anda ternampak seseorang atau benda yang mencurigakan, sila laporkannya kepada kakitangan kami atau tekan butang perhubungan kecemasan yang ada di tepi pintu kereta api.<br>(The Tamil Version). ||  
|2022||13 November||style="background-color:#F3D1B0"|{{Stn|Stevens}} to {{Stn|Gardens by the Bay}} were opened.
|-
|-
| Sometimes || Chime Plays || No eating or drinking is allowed in station or on trains. No eating or drinking is allowed in station or on trains.  ||  
|2024||23 June||style="background-color:#F3D1B0"|{{Stn|Tanjong Rhu}} to {{Stn|Bayshore}} were opened.
|}
|}


'''SMRT Lunchtime Xpress'''
==References==
 
<references/>
(When Approaching Station, Chime Plays) Aljunied. (Pause) This train service terminates at this station, All passengers please alight. Passengers who are continuing their journey, Please board the next train to Pasir Ris. Aljunied. (For EWL LTE)
 
(When Approacing Station, Chime Plays) Ang Mo Kio. (Pause) This train service terminates at this station, All passengers please alight. Passengers who are continuing their journey towards Woodlands or Jurong East Interchange, Please board the next train. Ang Mo Kio. (for NSL LTE)
 
(When Departing Station, Chime Plays) Next Station, Bugis. This Train Service Terminates At Outram Park Interchange.
 
'''Normal Departure'''
 
(When Departing Station, Chime Plays) Next Station, Lavender.
 
===May 2011 to date===
The announcement system revamped again in 27 May 2011, this time in the announcement for transfers (hilighted in ''italics'', had changed in a slower and simplified version, mostly after the new platform at [[Jurong East MRT Station|Jurong East Station]].
 
North South Line:
(When Approaching '''platform D''', Chime Plays) [[Jurong East MRT Station|Jurong East Interchange]]. ''This train service terminates at this station. Passengers who are heading towards the city, [[Pasir Ris MRT Station|Pasir Ris]] Or [[Changi Airport MRT Station|Changi Airport]], please cross over to Platform C on the left. Passengers who are heading towards [[Joo Koon MRT Station|Joo Koon]], please cross over to Platform F on the right.'' (Pause) Jurong East Interchange.
*STARIS:
<<<to Pasir Ris (Changes) to Joo Koon>>> (Changes consecutively)
 
(When Approaching '''platform A''', Chime Plays) [[Jurong East MRT Station|Jurong East Interchange]]. ''This train service terminates at this station. Passengers who are heading towards the city, [[Pasir Ris MRT Station|Pasir Ris]] Or [[Changi Airport MRT Station|Changi Airport]], please cross over to Platform B. Passengers who are heading towards [[Joo Koon MRT Station|Joo Koon]], please cross over to Platform F.'' (Pause) Jurong East Interchange.
 
East West Line:
(When Approaching Station, Chime Plays) Jurong East Interchange. ''Passengers who are heading towards [[Woodlands MRT Station|Woodlands]] or [[Ang Mo Kio MRT Station|Ang Mo Kio]], please cross over to Platforms A or D (for Pasir Ris-bound trains)/ E (for Joo Koon-bound trains).'' (Pause) Jurong East Interchange.
 
But it's not only Jurong East station that has announcements changed.
 
Transfer details:


East West Line (Raffles Place (for Pasir Ris-bound trains)/ City Hall (for Joo Koon-bound trains) stations):
{{Mass Rapid Transit}}
*(When Approaching Station, Chime Plays) [[Raffles Place MRT Station|Raffles Place Interchange]]. ''Passengers who are heading towards Orchard, Yishun or Woodlands, please cross over to Platform B (for Pasir Ris-bound trains)/ A (for Joo Koon-bound trains) on the right.'' Raffles Place Interchange. Please mind the platform gap.
 
North South Line (Marina Bay-bound trains):
*City Hall station
(When Approaching Station, Chime Plays) [[City Hall MRT Station|City Hall Interchange]]. ''Passengers who are heading towards Bugis, Pasir Ris or Changi Airport, please cross over to Platform D on the left.'' City Hall Interchange. Please mind the platform gap.
 
*Raffles Place station
(When Approaching Station, Chime Plays) [[Raffles Place MRT Station|Raffles Place Interchange]]. ''Passengers who are heading towards Tanjong Pagar or Joo Koon, please cross over to Platform C on the right.'' Raffles Place Interchange. Please mind the platform gap.
 
Tanah Merah station:
*East West Line:
(When Approaching Station, Chime Plays) [[Tanah Merah MRT Station|Tanah Merah Interchange]]. ''Passengers who are heading towards [[Expo MRT Station|Expo]] or [[Changi Airport MRT Station|Changi Airport]], please cross over to the middle platform.'' (Pause) Tanah Merah Interchange.
 
*Changi Airport Extension Line:
(When Approaching Station, Chime Plays) Tanah Merah Interchange. ''This train service terminates at this station. Passengers who are heading towards the city or [[Joo Koon MRT Station|Joo Koon]], please cross over to Platform B on the left. Passengers who are heading towards [[Pasir Ris MRT Station|Pasir Ris]], please cross over to Platform A on the right.'' (Pause) Tanah Merah Interchange.
*STARIS:
<<<to Joo Koon (Changes) to Pasir Ris>>> (Changes consecutively)
 
Announcements:
*No eating or drinking is allowed in stations or on trains. No eating or drinking is allowed in stations or on trains.
*This train will be crossing over to another track. For your safety, please hold on to your grabpoles or handgrips.
 
The current announcements are done by Miss Chan Hui Yuh on 20 March 2008.
 
===20 June 2003 to date (for North East Line and Downtown Line only)===
Doors closing. (Buzzer sounds, door closes and train departs)
 
Terminal (One-line) <br> (Chime Plays) Next Station, [[HarbourFront MRT Station|Harbourfront Terminal]]. All passengers please alight at this station. Thank you for travelling with SBS Transit. 港湾终点站
 
Terminal (Interchange) <br> (Chime Plays) Next Station, [[Punggol MRT Station|Punggol Terminal]]. Passengers may alight and change to the Punggol LRT. Thank you for travelling with SBS Transit. 榜鹅终点站
 
Approching Station <br> (When Approaching Station, Chime Plays) HarbourFront Terminal. 港湾终点站 (The Chinese Version) Please mind the gap. 请小心空隙 (The Chinese Version) Berhati-hati di ruang platform. (The Malay Version) and (Tamil Version) <br> + Please, do not lean against the doors.
 
At interchange stations, the information only announces one time only and the approaching station announcement is similar to the one that is above.
 
Interchange Stations <br> (Chime Plays) Next Station, Dhoby Ghaut Interchange. Passengers may alight and change to the North South Line and Circle Line. 多美歌
 
(When Approaching Station, Chime Plays) Dhoby Ghaut Station. 多美歌 (The Chinese Version) Please mind the gap. 请小心空隙 (The Chinese Version) Berhati-hati di ruang platform. (The Malay Version) and (Tamil Version).
 
Normal Stations <br> (Chime Plays) Next Station, [[Clarke Quay MRT Station|Clarke Quay]]. 克拉玛头
 
===30 May 2009 to date (Circle Line Only)===
After the opening of Circle Line, Miss Chan made the similar announcements on the irregular interchanges as the previous version:
 
(When Approaching Station, Chime Plays) '''[[Dhoby Ghaut MRT Station|Dhoby Ghaut Interchange]]. This train service terminates at this station. Passengers who are continuing their journey, please proceed to the [[North South MRT Line|North South Line]] or [[North East MRT Line|North East Line]]. Thank you for travelling for SMRT.''' (Pause until train stops) Dhoby Ghaut Interchange. Please mind the platform gap.
 
'''For Normal Departure'''
 
Doors are closing (Buzzer sounds, train departs station.)
 
(When Departing Station, Chime Plays) Please do not lean on the train doors. Next Station, Esplanade.(Previous version)
 
(When Departing Station, Chime Plays) Please do not lean against the train doors. Next Station, Esplanade.(New version)
 
(When Approaching Station, Chime Plays) Esplanade (pause until train stops) Esplanade. Please mind the platform gap.
 
==History of the ticketing system==
===1987 to 2002===
When the MRT opened in 1987, fares ranged from S$0.50 to S$1.10 in S$0.10 increments for all adult tickets, regardless of whether they were single-trip or stored-value tickets. Several discounted fares were available: senior citizens and permanent residents above the age of 60 could travel on a flat fare of S$0.50 during off-peak hours; children below the height of 1.2 metres and full-time students in primary, secondary, pre-university and vocational training (VITB) institutions paid a flat fare of S$0.30 at all times.
 
Magnetic strip plastic tickets were used, in various forms. Stored-value tickets were called ''farecards'' and came in three types: the blue farecard was issued to adults, the magenta farecard to senior citizens, and the red farecard to children. Single-trip forms of these tickets were retained at the faregates on exiting the paid area of a destination station. Monthly discounted tickets were available in four values: beige, pink, and purple tickets for primary and tertiary students, and full-time national servicemen came with a value of S$13, S$30 and S$36, respectively; the peach ticket was for secondary, pre-university and VITB students, costing S$17 each. These discounted tickets were valid for a month from the date of purchase, allowed up to four trips a day, and were non-transferable.
 
===2002 to 2009===
: ''Main articles: [[EZ-Link]]''
 
The EZ-Link card is a contactless smartcard, initially based on Sony's FeliCa smartcard technology. [http://www.sony.net/Products/felica/csy/trf.html (5)] The cards are mainly used for the payment of transportation fares, but may also be used for payment at selected retail outlets. Established in 2002, the technology was promoted as the means for speedier and more convenient transactions and as well as being an efficient method of reducing fare evasion, although there have been some cases of overcharging users. As a benchmark, fares range from S$0.70 to S$3.20 for adults, S$0.70 to S$1.35 for senior citizens, and S$0.40 to S$0.50 for student EZ-Link cards. Patrons using an EZ-Link card receive a discount for their journey, including a discount if they use a connecting bus after their MRT ride.
 
The General Ticketing Machines (GTMs) at each station which replaced the older ticketing machines, allow commuters to purchase additional credit to add to their EZ-Link cards or to purchase tickets for single trips. Fares for these single trip tickets are higher than those for EZ-Link cards. In addition, a S$1.00 refundable ticket deposit is charged for each Standard Ticket. This refund can be collected from any General Ticketing Machine so as long as the card is returned to the machine within 30 days of purchase. [http://www.transitlink.com.sg/standard_ticket.html (6)] The card can also be deposited into a charity collection box, with the S$1 deposit going to charity. The rationale behind such a refundable deposit feature was that the smartcard technology contained within each Standard Ticket makes each one costly enough to necessitate the recycling of Standard Tickets. Since November 2007, external readers were installed on GTMs at stations operated by SMRT Corporation to address problems of card jamming in insert slots. The slots, however, remain in use for the purpose of refunding Standard Ticket deposits.
 
Concession fares are available for children, students, senior citizens and national servicemen. Students are given free personalised cards, complete with their photos, names and national identification numbers. Regardless of its type, each card is assigned a unique card ID that can be used to recover the card if lost. Transport operators have organised lotteries that are based on these card IDs. The ''Singapore Tourist Pass'' offers unlimited travel for tourists on Singapore's public transport system. For S$8 a day, tourists can take any number of rides on buses and trains operated by SBS Transit, SMRT Buses and SMRT Trains. The old EZ-Link card can be used up to September 2009 where the old EZ-Link card usage would be discontinued.
 
===2009 to date===
: ''Main articles: [[CEPAS]]''
 
On 26 August 2008, Land Transport Authority announced a two month trial of the new generation Contactless ePurse Application (CEPAS) card that was developed in-house. [http://www.straitstimes.com/Breaking%2BNews/Singapore/Story/STIStory_272050.html (7)] It is intended to standardize the technology of cashless payment, allowing for use on public transport, [[Electronic Road Pricing]] (ERP), everyday shopping and meals. The card has replaced this generation of EZ-Link cards in 2009 and aims to encourage competition by allowing up to four CEPAS card issuers. [http://www.channelnewsasia.com/stories/singaporelocalnews/view/371754/1/.html (8)] Mass replacement of the old Sony FeliCa cards to the new CEPAS cards went on at TransitLink Ticket offices and Singapore Post outlets till 7 October 2009.
 
==2011 MRT train disruptions==
: ''Main article: [[2011 MRT train disruptions]]''
 
==References==
# Tien Fang Fwa (4 September 2004) (PDF). SUSTAINABLE URBAN TRANSPORTATION PLANNING AND DEVELOPMENT — Issues and Challenges for Singapore. University of Tokyo. Archived from the original on 2010. Retrieved 1 May 2006.
# http://sgforums.com/forums/2080/topics/314020
# http://www.youtube.com/watch?v=_a4S7wI8N0EU
# http://www.youtube.com/watch?v=50DHvagm8so
# "FeliCa in Use". Sony. Retrieved 26 November 2007.
# "What is a Standard Ticket?". TransitLink. Retrieved 1 December 2007.
# Christoper Tan (26 August 2008). "On trial: New ez-link card". The Straits Times.
# Imelda Saad (26 August 2008). "New e-payment system and next generation card for public transport". Channel NewsAsia.


==Category Links==
[[Category:Mass Rapid Transit]]
{{Mass Rapid Transit (Singapore)}}

Latest revision as of 12:42, 24 June 2024

Year Date Event
1967 N/A Conceptualise of a Rapid Transit Line to ease road congestion issue.[1]
1972-1982 N/A Bus vs Rail Debates.
1982 28 March Government decided to build the MRT.
1983 14 October Established the then MRT Corporation (Now Land Transport Authority).
22 October Ground-breaking ceremony at Shan Road.
1987 6 August SMRT Corporation was established.
7 November North–South Line began operation.
Yio Chu Kang to Toa Payoh were opened.
12 December Novena to Outram Park were opened.
1988 12 March Tiong Bahru to Clementi were opened.
5 November Jurong East to Lakeside were opened.
20 December Khatib to Yishun were opened.
1989 4 November East–West Line began operation.
Separation of North–South Line and East–West Line.
Marina Bay was opened.
Bugis to Tanah Merah were opened.
16 December Simei to Pasir Ris were opened.
1990 10 March East–West Line (Branch Extension) began operation.
Bukit Batok to Choa Chu Kang were opened.
6 July Boon Lay was opened.
1993 N/A Construction began for North–South Line (Woodlands Extension).
1996 10 February North–South Line (Woodlands Extension) began operation.
East–West Line (Branch Extension) dissolved into North–South Line.
Yew Tee to Sembawang were opened.
1997 1 January Construction began for North East Line.
1998 December Construction began for East–West Line (Changi Airport Extension).
2001 10 January East–West Line (Changi Airport Extension) began operation.
Expo was opened.
18 October Dover was opened.
2002 8 February Changi Airport was opened.
13 March Construction began for Circle Line.
2003 20 June North East Line began operation.
HarbourFront to Punggol were opened.
2004 20 April Nicoll Highway collapsed during the construction of Nicoll Highway station.
December Construction began for East–West Line (Boon Lay Extension).
2006 15 January Buangkok was opened.
2008 December Construction began for Downtown Line.
2009 28 February East–West Line (Boon Lay Extension) began operation.
Pioneer to Joo Koon were opened.
28 May Circle Line began operation.
Bartley to Marymount were opened.
December Construction began for North–South Line Extension.
2010 17 April Dhoby Ghaut to Tai Seng were opened.
2011 20 June Woodleigh was opened.
8 October Caldecott to HarbourFront were opened.
15 December 5-hours long disruption along North–South Line due to Train & Track Fault.
17 December 7-hours long disruption along North–South Line due to Train & Track Fault.
2012 14 January Circle Line (Circle Line Extension) began operation.
Bayfront to Marina Bay were opened.
2013 22 December Downtown Line began operation.
Bugis to Chinatown were opened.
2014 January Construction began for Thomson–East Coast Line.
23 November North–South Line (North–South Line Extension) began operation.
Marina South Pier was opened.
2015 7 July - 8 July 18-hours long disruption and delay along North–South Line and East–West Line due to Power Fault.
27 December Bukit Panjang to Rochor were opened.
2017 18 June East–West Line (Tuas West Extension) began operation.
Gul Circle to Tuas Link were opened.
7 October - 8 October 21-hours long disruption along North–South Line due to Tunnel Flooding.
21 October Fort Canning to Expo were opened.
N/A Construction began for Circle Line (Stage 6).
2019 2 November Canberra was opened.
2020 31 January Thomson–East Coast Line began operation.
Woodlands North to Woodlands South were opened.
2021 28 August Springleaf to Caldecott were opened.
2022 13 November Stevens to Gardens by the Bay were opened.
2024 23 June Tanjong Rhu to Bayshore were opened.

References[edit]

  1. Tien Fang Fwa. "SUSTAINABLE URBAN TRANSPORTATION PLANNING AND DEVELOPMENT — Issues and Challenges for Singapore". 4 Sep 2004. Retrieved 1 May 2006. University of Tokyo. Archived from the original.
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951
Former651
FutureJ151CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi EastEast CoastTengah