Difference between revisions of "History of the Mass Rapid Transit"
Jump to navigation
Jump to search
(added history, reliability for the article is the same because of some unforeseen last month) |
|||
(33 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
{|class="wikitable" style="border-collapse:collapsed;width:100%;" | |||
|- | |||
!width=40|Year!!width=110|Date!!Event | |||
|- | |||
|1967||{{N/A}}||Conceptualise of a Rapid Transit Line to ease road congestion issue.<ref>Tien Fang Fwa. [http://csur.t.u-tokyo.ac.jp/ws2004/papers/B2-Fwa.pdf "SUSTAINABLE URBAN TRANSPORTATION PLANNING AND DEVELOPMENT — Issues and Challenges for Singapore"]. 4 Sep 2004. Retrieved 1 May 2006. University of Tokyo. Archived from the [http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.119.9246 original].</ref> | |||
|- | |||
|1972-1982||{{N/A}}||Bus vs Rail Debates. | |||
|- | |||
|1982||28 March||Government decided to build the MRT. | |||
|- | |||
|rowspan=2|1983||14 October||Established the then MRT Corporation (Now Land Transport Authority). | |||
|- | |||
|22 October||Ground-breaking ceremony at Shan Road. | |||
|- | |||
|rowspan=4|1987||6 August||SMRT Corporation was established. | |||
|- | |||
|rowspan=2|7 November||{{NSL}} began operation. | |||
: | |- | ||
|style="background-color:#F6B4B0"|{{Stn|Yio Chu Kang}} to {{Stn|Toa Payoh}} were opened. | |||
|- | |||
|12 December||style="background-color:#F6B4B0"|{{Stn|Novena}} to {{Stn|Outram Park}} were opened. | |||
|- | |||
== | |rowspan=3|1988||12 March||style="background-color:#F6B4B0"|{{Stn|Tiong Bahru}} to {{Stn|Clementi}} were opened. | ||
|- | |||
|5 November||style="background-color:#F6B4B0"|{{Stn|Jurong East}} to {{Stn|Lakeside}} were opened. | |||
: | |- | ||
|20 December||style="background-color:#F6B4B0"|{{Stn|Khatib}} to {{Stn|Yishun}} were opened. | |||
|- | |||
|rowspan=5|1989||rowspan=4|4 November||{{EWL}} began operation. | |||
|- | |||
|Separation of {{NSL}} and {{EWL}}. | |||
|- | |||
|style="background-color:#F6B4B0"|{{Stn|Marina Bay}} was opened. | |||
|- | |||
|style="background-color:#A6FFC9"|{{Stn|Bugis}} to {{Stn|Tanah Merah}} were opened. | |||
|- | |||
|16 December||style="background-color:#A6FFC9"|{{Stn|Simei}} to {{Stn|Pasir Ris}} were opened. | |||
|- | |||
|rowspan=3|1990||rowspan=2|10 March||{{EWL}} (Branch Extension) began operation. | |||
|- | |||
== | |style="background-color:#A6FFC9"|{{Stn|Bukit Batok}} to {{Stn|Choa Chu Kang}} were opened. | ||
|- | |||
|6 July||style="background-color:#A6FFC9"|{{Stn|Boon Lay}} was opened. | |||
|- | |||
|1993||{{N/A}}||Construction began for {{NSL}} (Woodlands Extension). | |||
|- | |||
|rowspan=3|1996||rowspan=3|10 February||{{NSL}} (Woodlands Extension) began operation. | |||
|- | |||
|{{EWL}} (Branch Extension) dissolved into {{NSL}}. | |||
|- | |||
|style="background-color:#F6B4B0"|{{Stn|Yew Tee}} to {{Stn|Sembawang}} were opened. | |||
|- | |||
|1997||1 January||Construction began for {{NEL}}. | |||
|- | |||
|1998||December||Construction began for {{EWL}} (Changi Airport Extension). | |||
|- | |||
|rowspan=3|2001||rowspan=2|10 January||{{EWL}} (Changi Airport Extension) began operation. | |||
|- | |||
|style="background-color:#A6FFC9"|{{Stn|Expo}} was opened. | |||
|- | |||
|18 October||style="background-color:#A6FFC9"|{{Stn|Dover}} was opened. | |||
|- | |||
|rowspan=2|2002||8 February||style="background-color:#A6FFC9"|{{Stn|Changi Airport}} was opened. | |||
|- | |||
|13 March||Construction began for {{CCL}}. | |||
|- | |||
|rowspan=2|2003||rowspan=2|20 June||{{NEL}} began operation. | |||
|- | |||
|style="background-color:#E7B9F0"|{{Stn|HarbourFront}} to {{Stn|Punggol}} were opened. | |||
|- | |||
|rowspan=2|2004||20 April||Nicoll Highway collapsed during the construction of {{Stn|Nicoll Highway| station}}. | |||
|- | |||
|December||Construction began for {{EWL}} (Boon Lay Extension). | |||
|- | |||
|2006||15 January||style="background-color:#E7B9F0"|{{Stn|Buangkok}} was opened. | |||
|- | |||
|2008||December||Construction began for {{DTL}}. | |||
|- | |- | ||
|rowspan=5|2009||rowspan=2|28 February||{{EWL}} (Boon Lay Extension) began operation. | |||
|- | |- | ||
| | |style="background-color:#A6FFC9"|{{Stn|Pioneer}} to {{Stn|Joo Koon}} were opened. | ||
|- | |- | ||
| | |rowspan=2|28 May||{{CCL}} began operation. | ||
|- | |- | ||
| | |style="background-color:#FFD7A0"|{{Stn|Bartley}} to {{Stn|Marymount}} were opened. | ||
|- | |- | ||
|December||Construction began for {{NSL}} Extension. | |||
|- | |- | ||
| | |2010||17 April||style="background-color:#FFD7A0"|{{Stn|Dhoby Ghaut}} to {{Stn|Tai Seng}} were opened. | ||
|- | |- | ||
|rowspan=4|2011||20 June||style="background-color:#E7B9F0"|{{Stn|Woodleigh}} was opened. | |||
|- | |- | ||
| | |8 October||style="background-color:#FFD7A0"|{{Stn|Caldecott}} to {{Stn|HarbourFront}} were opened. | ||
|- | |- | ||
|15 December||5-hours long disruption along {{NSL}} due to Train & Track Fault. | |||
|- | |- | ||
|17 December||7-hours long disruption along {{NSL}} due to Train & Track Fault. | |||
|- | |- | ||
| | |rowspan=2|2012||rowspan=2|14 January||{{CCL}} (Circle Line Extension) began operation. | ||
|- | |- | ||
| | |style="background-color:#FFD7A0"|{{Stn|Bayfront}} to {{Stn|Marina Bay}} were opened. | ||
|- | |- | ||
|rowspan=2|2013||rowspan=2|22 December||{{DTL}} began operation. | |||
|} | |||
|- | |- | ||
|style="background-color:#A7D0FF"|{{Stn|Bugis}} to {{Stn|Chinatown}} were opened. | |||
|- | |- | ||
| | |rowspan=3|2014||January||Construction began for {{TEL}}. | ||
|- | |- | ||
| | |rowspan=2|23 November||{{NSL}} ({{NSL|b=}} Extension) began operation. | ||
|- | |- | ||
| | |style="background-color:#F6B4B0"|{{Stn|Marina South Pier}} was opened. | ||
|- | |- | ||
| | |rowspan=2|2015||7 July - 8 July||18-hours long disruption and delay along {{NSL}} and {{EWL}} due to Power Fault. | ||
|- | |- | ||
| | |27 December||style="background-color:#A7D0FF"|{{Stn|Bukit Panjang}} to {{Stn|Rochor}} were opened. | ||
|- | |- | ||
|rowspan=5|2017||rowspan=2|18 June||{{EWL}} (Tuas West Extension) began operation. | |||
|- | |- | ||
| | |style="background-color:#A6FFC9"|{{Stn|Gul Circle}} to {{Stn|Tuas Link}} were opened. | ||
|- | |- | ||
| | |7 October - 8 October||21-hours long disruption along {{NSL}} due to Tunnel Flooding. | ||
|- | |- | ||
| | |21 October||style="background-color:#A7D0FF"|{{Stn|Fort Canning}} to {{Stn|Expo}} were opened. | ||
|- | |- | ||
| | |{{N/A}}||Construction began for {{CCL}} (Stage 6). | ||
|- | |- | ||
|2019||2 November||style="background-color:#F6B4B0"|{{Stn|Canberra}} was opened. | |||
|- | |- | ||
| | |rowspan=2|2020||rowspan=2|31 January||{{TEL}} began operation. | ||
|- | |- | ||
| | |style="background-color:#F3D1B0"|{{Stn|Woodlands North}} to {{Stn|Woodlands South}} were opened. | ||
|- | |- | ||
|2021||28 August||style="background-color:#F3D1B0"|{{Stn|Springleaf}} to {{Stn|Caldecott}} were opened. | |||
|- | |- | ||
| | |2022||13 November||style="background-color:#F3D1B0"|{{Stn|Stevens}} to {{Stn|Gardens by the Bay}} were opened. | ||
|- | |- | ||
| | |2024||23 June||style="background-color:#F3D1B0"|{{Stn|Tanjong Rhu}} to {{Stn|Bayshore}} were opened. | ||
|} | |} | ||
==References== | |||
<references/> | |||
{{Mass Rapid Transit}} | |||
[[Category:Mass Rapid Transit]] | |||
Latest revision as of 12:42, 24 June 2024
Year | Date | Event |
---|---|---|
1967 | N/A | Conceptualise of a Rapid Transit Line to ease road congestion issue.[1] |
1972-1982 | N/A | Bus vs Rail Debates. |
1982 | 28 March | Government decided to build the MRT. |
1983 | 14 October | Established the then MRT Corporation (Now Land Transport Authority). |
22 October | Ground-breaking ceremony at Shan Road. | |
1987 | 6 August | SMRT Corporation was established. |
7 November | North–South Line began operation. | |
Yio Chu Kang to Toa Payoh were opened. | ||
12 December | Novena to Outram Park were opened. | |
1988 | 12 March | Tiong Bahru to Clementi were opened. |
5 November | Jurong East to Lakeside were opened. | |
20 December | Khatib to Yishun were opened. | |
1989 | 4 November | East–West Line began operation. |
Separation of North–South Line and East–West Line. | ||
Marina Bay was opened. | ||
Bugis to Tanah Merah were opened. | ||
16 December | Simei to Pasir Ris were opened. | |
1990 | 10 March | East–West Line (Branch Extension) began operation. |
Bukit Batok to Choa Chu Kang were opened. | ||
6 July | Boon Lay was opened. | |
1993 | N/A | Construction began for North–South Line (Woodlands Extension). |
1996 | 10 February | North–South Line (Woodlands Extension) began operation. |
East–West Line (Branch Extension) dissolved into North–South Line. | ||
Yew Tee to Sembawang were opened. | ||
1997 | 1 January | Construction began for North East Line. |
1998 | December | Construction began for East–West Line (Changi Airport Extension). |
2001 | 10 January | East–West Line (Changi Airport Extension) began operation. |
Expo was opened. | ||
18 October | Dover was opened. | |
2002 | 8 February | Changi Airport was opened. |
13 March | Construction began for Circle Line. | |
2003 | 20 June | North East Line began operation. |
HarbourFront to Punggol were opened. | ||
2004 | 20 April | Nicoll Highway collapsed during the construction of Nicoll Highway station. |
December | Construction began for East–West Line (Boon Lay Extension). | |
2006 | 15 January | Buangkok was opened. |
2008 | December | Construction began for Downtown Line. |
2009 | 28 February | East–West Line (Boon Lay Extension) began operation. |
Pioneer to Joo Koon were opened. | ||
28 May | Circle Line began operation. | |
Bartley to Marymount were opened. | ||
December | Construction began for North–South Line Extension. | |
2010 | 17 April | Dhoby Ghaut to Tai Seng were opened. |
2011 | 20 June | Woodleigh was opened. |
8 October | Caldecott to HarbourFront were opened. | |
15 December | 5-hours long disruption along North–South Line due to Train & Track Fault. | |
17 December | 7-hours long disruption along North–South Line due to Train & Track Fault. | |
2012 | 14 January | Circle Line (Circle Line Extension) began operation. |
Bayfront to Marina Bay were opened. | ||
2013 | 22 December | Downtown Line began operation. |
Bugis to Chinatown were opened. | ||
2014 | January | Construction began for Thomson–East Coast Line. |
23 November | North–South Line (North–South Line Extension) began operation. | |
Marina South Pier was opened. | ||
2015 | 7 July - 8 July | 18-hours long disruption and delay along North–South Line and East–West Line due to Power Fault. |
27 December | Bukit Panjang to Rochor were opened. | |
2017 | 18 June | East–West Line (Tuas West Extension) began operation. |
Gul Circle to Tuas Link were opened. | ||
7 October - 8 October | 21-hours long disruption along North–South Line due to Tunnel Flooding. | |
21 October | Fort Canning to Expo were opened. | |
N/A | Construction began for Circle Line (Stage 6). | |
2019 | 2 November | Canberra was opened. |
2020 | 31 January | Thomson–East Coast Line began operation. |
Woodlands North to Woodlands South were opened. | ||
2021 | 28 August | Springleaf to Caldecott were opened. |
2022 | 13 November | Stevens to Gardens by the Bay were opened. |
2024 | 23 June | Tanjong Rhu to Bayshore were opened. |
References[edit]
- ↑ Tien Fang Fwa. "SUSTAINABLE URBAN TRANSPORTATION PLANNING AND DEVELOPMENT — Issues and Challenges for Singapore". 4 Sep 2004. Retrieved 1 May 2006. University of Tokyo. Archived from the original.
Mass Rapid Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line
FutureJurong Region Line • Cross Island Line | |
Rolling Stocks | 151 • 151A • 151B • 151C • R151 • T251 • 751A • 751B • 751C • 830 • 830C • 851E • 951
Former651 Future J151 • CR151 | |
Depots | Bishan • Changi • Gali Batu • Kim Chuan • Mandai • Sengkang • Ulu Pandan • Tuas | |
Future Changi East • East Coast • Tengah |