Circle Line

From SgWiki
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Circle Line
环线
சர்க்கிள் வரி
CCL Map.png
Statistics
Status Operational
Termini Dhoby Ghaut
HarbourFront
Marina Bay
Stations 33 (3 U/C)
Services 2
Operator(s) SMRT Trains
Rolling stock C830, C830C
Line length 35.5 km
Track gauge 1,435 mm standard gauge
Electrification 750V DC Third rail

Circle Line (CCL) is the fourth Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 60 minutes. The line is currently 35.5 km long with 30 stations and it is fully underground and automated.

History

Date Event
28 May 2009 Bartley - Template:STN
17 April 2010 Dhoby Ghaut - Bartley
8 October 2011 Template:STN - HarbourFront
14 January 2012 Promenade - Marina Bay
2025 HarbourFront - Marina Bay

Nicoll Highway Collapse

On 20 April 2004 at 3.30pm, the construction site of the Nicoll Highway station collapsed. The collapse killed four people and injured three and caused the construction to be delayed for the Circle Line. As a result of the collapsed, the new Nicoll Highway station was shifted 100m away from the original site.

Circle Line Stage 6

On 17 January 2013, the Land Transport Authority announced Circle Line Stage 6 which will close the circle, running between Marina Bay and HarbourFront. It will be a 4 km extension.[1] On 29 October 2015, the LTA announced the 3 station locations for the 'Circle Line Stage 6'. The stations are Keppel Station, Cantonment Station and Prince Edward Station. Construction of the line is due for completion in 2025.[2]

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:MRT000.png Circle Line
3
Dhoby Ghaut Dhoby Ghaut-CCL.png Dhoby Ghaut Terminus
Interchange with North–South Line and North East Line
1
Bras Basah Bras Basah-CCL.png Museum
1
Esplanade Esplanade-CCL.png Convention Centre
2
Promenade Promenade-CCL.png Millenia Interchange with Downtown Line
1
Nicoll Highway Nicoll Highway-CCL.png Nicoll Highway
1
Stadium Stadium-CCL.png Boulevard Terminus (Circle Line Extension)
1
Mountbatten Mountbatten-CCL.png Old Airport Road
1
Dakota Dakota-CCL.png Tanjong Katong
2
Paya Lebar Paya Lebar-CCL.png Paya Lebar Interchange with East–West Line
2
MacPherson MacPherson-CCL.png MacPherson Interchange with Downtown Line
1
Tai Seng Tai Seng-CCL.png Upper Paya Lebar
1
Bartley Bartley-CCL.png Bartley
2
Serangoon Serangoon-CCL.png Serangoon Interchange with North East Line
1
Lorong Chuan Lorong Chuan-CCL.png Lorong Chuan
2
Bishan Bishan-CCL.png Bishan Interchange with North–South Line
1
Marymount Marymount-CCL.png Marymount
2
Caldecott Caldecott-CCL.png Thomson Future Interchange with Thomson–East Coast Line
1
Bukit Brown Bukit Brown Reserved station. Not in Operation.
2
Botanic Gardens Botanic Gardens-CCL.png Adam Interchange with Downtown Line
1
Farrer Road Farrer Road-CCL.png Farrer
1
Holland Village Holland Village-CCL.png Holland
2
Buona Vista Buona Vista-CCL.png Buona Vista Interchange with East–West Line
1
one-north One-north-CCL.png one-north
1
Kent Ridge Kent Ridge-CCL.png National University Hospital
1
Haw Par Villa Haw Par Villa-CCL.png West Coast
1
Pasir Panjang Pasir Panjang-CCL.png Pasir Panjang
1
Labrador Park Labrador Park-CCL.png Alexandra
1
Telok Blangah Telok Blangah-CCL.png Telok Blangah
2
HarbourFront HarbourFront-CCL.png HarbourFront Terminus
Interchange with North East Line
File:MRT000.png Circle Line Stage 6
1
Keppel Keppel Under Construction
1
Cantonment Cantonment Under Construction
1
Prince Edward Prince Edward Under Construction
File:MRT000.png Circle Line Extension
2
Bayfront Bayfront-CCL-DTL.png Bayfront Interchange with Downtown Line
3
Marina Bay Marina Bay-CCL.png Marina Bay Terminus
Interchange with North–South Line
Future Interchange with Thomson–East Coast Line

Services

Service Starting Terminate at Notes
Full Dhoby Ghaut HarbourFront
Full HarbourFront Dhoby Ghaut
Full HarbourFront Marina Bay Operates during Peak Hours.
SWT HarbourFront Paya Lebar Operate during peak hours/after peak hours.
Full Stadium Marina Bay Operates during Off Peak Hours.
Full Marina Bay Stadium Operates during Off Peak Hours.
Full Marina Bay HarbourFront Operates during Peak Hours.
SWT/Special Marina Bay Caldecott Operates on days when major events held at National Stadium.

Rolling stock

The rolling stock consists of Alstom Metropolis C830 and Alstom Metropolis C830C trains. These trains operate from Kim Chuan Depot near Template:STN.

References

  1. "Circle Line Stage 6". Land Transport Authority.
  2. "Three new stations to close loop on Circle Line". TODAYonline. Retrieved 16 Jan 2016.
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL6KeppelCantonmentPrince Edward Road
Circle Line ExtensionPromenadeBayfrontMarina Bay
Rolling Stock 830830C851E
Depots Kim Chuan
Others Bridging Service