Marina Bay station

From SgWiki
Jump to navigation Jump to search
!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SBS Transit
  • From Saturday, 15 March 2025, supplementary bus service 138M will be introduced to better serve residents travelling to the Ang Mo Kio Polyclinic. This service will operate at a frequency of 30 minutes from Ang Mo Kio Bus Interchange. Please refer here for more information.

Tower Transit
  • From Saturday, 15 March 2025, bus service 883M will operate on Saturdays from 7am to 1pm at 30-minute frequency to enhance connectivity to amenities along Yishun Avenue 7. Please refer here for more information.

SBS Transit
  • From Monday, 17 March 2025, short-trip service 71A will be introduced from Mayflower MRT Station to Bishan MRT Station. Please refer here for more information.

SMRT Buses
  • From Sunday, 23 March 2025, supplementary bus service 258M will ply an extended route looping at Boon Lay Place to provide direct connection to amenities such as Boon Lay Shopping Centre. Please refer here for more information.

SMRT Buses
  • From Monday, 24 March 2025, supplementary bus service 979X will be introduced to provide a faster connection for residents in Yew Tee Village to and from Bukit Panjang MRT / Bus Interchange. Bus service 979X will supplement bus service 979 and serve selected bus stops along its route. It will operate on weekdays (excluding Public Holidays) during the morning and evening peak periods. Please refer here for more information.

Tower Transit
  • From Monday, 24 March 2025, supplementary bus service 861M will be introduced to complement existing travel options to Wellington Primary School. It will operate from Canberra Way, terminating at Sembawang Bus Interchange. This service will operate two trips during the morning peak period on weekdays during school term only. Please refer here for more information.

SBS Transit
  • From Monday, 24 March 2025, short-trip service 112B will be introduced starting from Hougang Central Bus Interchange and terminating at Hougang Avenue 7. This service will only operate on weekdays (excluding public holidays) during the evening peak period. Please refer here for more information.

Marina Bay
滨海湾
மரீனா பே

3
Marina Bay-NSL.png
Marina Bay-CCL.png
*Graphic From SGTrains/Wikipedia/LTA
Station Information
Address 21 Park Street
23 Park Street
Singapore 018925/018926
Line(s) North–South Line
Circle Line
Thomson–East Coast Line
(Under Construction)
Connections Bus, Taxi
Abbreviation MRB

Marina Bay (NS27/CE2/TE20) is an underground Mass Rapid Transit (MRT) station on the North–South Line, Circle Line and the future Thomson–East Coast Line, and serves as an interchange station between the two lines.

History

Date Event
4 November 1989 Station officially opens
8 January 2006 Exercise Northstar V
14 January 2012 Station interchanges with Circle Line

Construction of Thomson East Coast Line

Ground freezing will be applied for the first time in Singapore rail construction when building the Thomson East Coast Line part of this station, where it under-cross the existing North South Line and Circle Line tunnels.[1]

Layout

L1 Street Level
B1 NSL Concourse Faregates, General Ticketing Machines, Passenger Service Centre
Service Level Marina Bay Maintenance Facility
Transfer Linkway between North South Line Concourse and Circle Line Concourse
Platform A Circle Line
Template:Terminus
Template:Terminus
Platform A/B
Platform B Circle Line
Template:Terminus
Template:Terminus
B2 CCL Concourse Faregates, General Ticketing Machines, Passenger Service Centre
Platform A North–South Line
Template:Terminus
Platform A/B
Platform B North–South Line
Template:Terminus

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Bayfront Avenue
B Central Boulevard, Marina One Residences

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Line Template:Rail Service |}

Bus

Bus Stop Exit Bus Service
03539
Marina Bay Stn
97 97e 106 133 400 402 502 502A 513 651 653 654 655 657 658 659 661 662 664 666 667 668 669 670 671 672 982E
03391
Marina Bay Financial Ctr
97 97e 106 133 400 402 513 651 653 654 655 657 658 659 661 662 664 666 667 668 669 670 671 672 982E

References

  1. "Ground freezing first for Singapore rail project". TunnelTalk (2 July 2014). Retrieved 18 December 2014.

Template:North South Line

icon Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL6KeppelCantonmentPrince Edward Road
Circle Line ExtensionPromenadeBayfrontMarina Bay
Rolling Stock 830830C851E
Depots Kim Chuan
Others Bridging Service

Template:Thomson East Coast Line