Difference between revisions of "Tuas Depot"

From SgWiki
Jump to navigation Jump to search
(Farewell)
 
(6 intermediate revisions by 2 users not shown)
Line 4: Line 4:
  {{Infoline|Address|3 Tuas West Road<br>Singapore 638391}}
  {{Infoline|Address|3 Tuas West Road<br>Singapore 638391}}
  {{Infoline|Line(s)|{{EWL}}}}
  {{Infoline|Line(s)|{{EWL}}}}
  {{Infoline|Rolling Stock(s)|[[Kawasaki Heavy Industries C151|C151]]<br>[[Siemens C651|C651]]<br>[[Kawasaki Heavy Industries & Nippon Sharyo C751B|C751B]]<br>[[Kawasaki Heavy Industries & CSR Qingdao Sifang C151A|C151A]]<br>[[Kawasaki Heavy Industries & CSR Qingdao Sifang C151B|C151B]]}}
  {{Infoline|Rolling Stock(s)|[[Kawasaki Heavy Industries 151|151]]<br>[[Kawasaki Heavy Industries & Nippon Sharyo 751B|751B]]<br>[[Kawasaki Heavy Industries & CSR Qingdao Sifang 151A|151A]]<br>[[Kawasaki Heavy Industries & CSR Qingdao Sifang 151B|151B]]<br>[[Kawasaki Heavy Industries & CRRC Qingdao Sifang 151C|151C]]<br>[[Alstom MOVIA R151|R151]]}}
}}
}}


Line 14: Line 14:
!width=150|Date!!Event
!width=150|Date!!Event
|-
|-
|18 June 2017||Depot officially opens with Tuas West Extension on {{EWL}}
|18 June 2017||Depot officially opens
|-
|7 October 2017||Tuas Bus Terminal officially opens above Tuas Train Depot
|}
|}


==Reception Tracks==
==Reception Tracks==
On the East West Line, it has 2 reception tracks that lead to {{Stn|Tuas Link| station}}.
On the {{EWL|b=}}, it has 2 reception tracks that lead to {{Stn|Tuas Link| station}}.


==References==
==References==
Line 26: Line 24:


{{Mass Rapid Transit}}
{{Mass Rapid Transit}}
{{East West Line}}
{{East–West Line}}


[[Category:Rail Depot]]
[[Category:Rail Depot]]

Latest revision as of 20:15, 9 November 2024


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

SBS Transit Tower Transit
  • On Tuesday, 19 November 2024, six (6) Bus Services, , , , & – will be affected by a temporary road closure from 12.30am to 5.00am. A section of Jurong East Central will be closed to facilitate the construction of the Jurong Region Line.
  • Please refer to the following for more information.
    • SBS Transit
    • Tower Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours.
  • Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard.An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes.
  • Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Tuas Depot
大士车厂
துவாஸ் பணிமனை
Statistics
Address 3 Tuas West Road
Singapore 638391
Line(s) East–West Line
Rolling Stock(s) 151
751B
151A
151B
151C
R151

Tuas Depot is the eighth train depot in Singapore, and the first depot to be accessible to the public due to it being integrated with the Tuas Bus Terminal. It maintains trains for the East–West Line.

History[edit]

Date Event
18 June 2017 Depot officially opens

Reception Tracks[edit]

On the East–West Line, it has 2 reception tracks that lead to Tuas Link station.

References[edit]


icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951
Former651
FutureJ151CR151
Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
FutureChangi EastEast CoastTengah
icon East–West Line [ VTE ]
Stations Pasir RisTampinesSimeiTanah MerahBedokKembanganEunosPaya LebarAljuniedKallangLavenderBugisCity HallRaffles PlaceTanjong PagarOutram ParkTiong BahruRedhillQueenstownCommonwealthBuona VistaDoverClementiJurong EastChinese GardenLakesideBoon LayPioneerJoo KoonGul CircleTuas CrescentTuas West RoadTuas Link
Changi Airport ExtensionTanah MerahExpoChangi Airport
Rolling Stock 151751B151A151B151CR151
Former651
Depots ChangiUlu PandanTuasEast Coast
Others Bridging Service