Difference between revisions of "Changi Depot"

From SgWiki
Jump to navigation Jump to search
m (Removed protection from "Changi Depot")
(Farewell)
 
(3 intermediate revisions by 2 users not shown)
Line 4: Line 4:
  {{Infoline|Address|5 Koh Sek Lim Road<br>Singapore 486050}}
  {{Infoline|Address|5 Koh Sek Lim Road<br>Singapore 486050}}
  {{Infoline|Line(s)|{{EWL}}}}
  {{Infoline|Line(s)|{{EWL}}}}
  {{Infoline|Rolling Stock(s)|[[Kawasaki Heavy Industries C151|C151]]<br>[[Siemens C651|C651]]<br>[[Kawasaki Heavy Industries & Nippon Sharyo C751B|C751B]]<br>[[Kawasaki Heavy Industries & CSR Qingdao Sifang C151A|C151A]]<br>[[Kawasaki Heavy Industries & CSR Qingdao Sifang C151B|C151B]]}}
  {{Infoline|Rolling Stock(s)|[[Kawasaki Heavy Industries 151|151]]<br>[[Kawasaki Heavy Industries & Nippon Sharyo 751B|751B]]<br>[[Kawasaki Heavy Industries & CSR Qingdao Sifang 151A|151A]]<br>[[Kawasaki Heavy Industries & CSR Qingdao Sifang 151B|151B]]<br>[[Kawasaki Heavy Industries & CRRC Qingdao Sifang 151C|151C]]<br>[[Alstom MOVIA R151|R151]]}}
}}
}}


'''Changi Depot''' is the third train depot in Singapore. It maintains trains for the {{EWL}}. It will be replaced by the new [[East Coast Integrated Depot]] when completed in 2024.
'''Changi Depot''' is the third train depot in Singapore. It maintains trains for the {{EWL}}. It will be replaced by the new [[East Coast Integrated Depot]] when completed in 2026.


==History==
==History==
Line 18: Line 18:


===Vandalism===
===Vandalism===
On 18 May 2010, a [[Kawasaki Heavy Industries C151]] train carriage was vandalised in the depot. Elaborate graffiti was drawn on the lower half of the carriage.<ref>[//www.straitstimes.com/BreakingNews/Singapore/Story/STIStory_535411.html "MRT train vandalised"]. Straits Times (18 May 2010). Retrieved 4 June 2010.</ref>
On 18 May 2010, a [[Kawasaki Heavy Industries 151]] train carriage was vandalised in the depot. Elaborate graffiti was drawn on the lower half of the carriage.<ref>[//www.straitstimes.com/BreakingNews/Singapore/Story/STIStory_535411.html "MRT train vandalised"]. Straits Times (18 May 2010). Retrieved 4 June 2010.</ref>


A Swiss national, Oliver Fricker was charged with three charges of trespassing into the depot on the early hours of 17 May and vandalising the train by spraying paint and damaging public property by cutting a wired fence into property belonging to Land Transport Authority. Another British national has also been named as being involved in the case. However, his whereabouts are unknown.
A Swiss national, Oliver Fricker was charged with three charges of trespassing into the depot on the early hours of 17 May and vandalising the train by spraying paint and damaging public property by cutting a wired fence into property belonging to Land Transport Authority. Another British national has also been named as being involved in the case. However, his whereabouts are unknown.


==Reception Tracks==
==Reception Tracks==
On the East West Line, it has 2 reception tracks that lead to {{Stn|Tanah Merah| station}}.
On the {{EWL|b=}}, it has 2 reception tracks that lead to {{Stn|Tanah Merah| station}}.


==References==
==References==
Line 29: Line 29:


{{Mass Rapid Transit}}
{{Mass Rapid Transit}}
{{East West Line}}
{{East–West Line}}


[[Category:Rail Depot]]
[[Category:Rail Depot]]

Latest revision as of 20:15, 9 November 2024


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Changi Depot
樟宜车厂
சாங்கி பணிமனை
Statistics
Address 5 Koh Sek Lim Road
Singapore 486050
Line(s) East–West Line
Rolling Stock(s) 151
751B
151A
151B
151C
R151

Changi Depot is the third train depot in Singapore. It maintains trains for the East–West Line. It will be replaced by the new East Coast Integrated Depot when completed in 2026.

History[edit]

Date Event
4 November 1989 Depot officially opens

Vandalism[edit]

On 18 May 2010, a Kawasaki Heavy Industries 151 train carriage was vandalised in the depot. Elaborate graffiti was drawn on the lower half of the carriage.[1]

A Swiss national, Oliver Fricker was charged with three charges of trespassing into the depot on the early hours of 17 May and vandalising the train by spraying paint and damaging public property by cutting a wired fence into property belonging to Land Transport Authority. Another British national has also been named as being involved in the case. However, his whereabouts are unknown.

Reception Tracks[edit]

On the East–West Line, it has 2 reception tracks that lead to Tanah Merah station.

References[edit]

  1. "MRT train vandalised". Straits Times (18 May 2010). Retrieved 4 June 2010.
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
icon East–West Line [ VTE ]
Stations Pasir RisTampinesSimeiTanah MerahBedokKembanganEunosPaya LebarAljuniedKallangLavenderBugisCity HallRaffles PlaceTanjong PagarOutram ParkTiong BahruRedhillQueenstownCommonwealthBuona VistaDoverClementiJurong EastChinese GardenLakesideBoon LayPioneerJoo KoonGul CircleTuas CrescentTuas West RoadTuas Link

Changi Airport ExtensionTanah MerahExpoChangi Airport

Rolling Stock 151751B151A151B151CR151

Former651

Depots ChangiUlu PandanTuasEast Coast
Others Bridging Service