Difference between revisions of "North–South Line"

From SgWiki
Jump to navigation Jump to search
(Created page with "{{Infobox/Line |Line=NSL |Name=North South Line<br>南北线<br>வடக்கு தெற்கு வரி |Img=centre|300px |Info= {{Infoline|Statu...")
 
m (Protected "North South Line" ([Edit=Allow only autoconfirmed users] (indefinite) [Move=Allow only autoconfirmed users] (indefinite)))
(No difference)

Revision as of 19:11, 12 September 2017

!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SBS Transit
  • From Saturday, 15 March 2025, supplementary bus service 138M will be introduced to better serve residents travelling to the Ang Mo Kio Polyclinic. This service will operate at a frequency of 30 minutes from Ang Mo Kio Bus Interchange. Please refer here for more information.

Tower Transit
  • From Saturday, 15 March 2025, bus service 883M will operate on Saturdays from 7am to 1pm at 30-minute frequency to enhance connectivity to amenities along Yishun Avenue 7. Please refer here for more information.

SBS Transit
  • From Monday, 17 March 2025, short-trip service 71A will be introduced from Mayflower MRT Station to Bishan MRT Station. Please refer here for more information.

SMRT Buses
  • From Sunday, 23 March 2025, supplementary bus service 258M will ply an extended route looping at Boon Lay Place to provide direct connection to amenities such as Boon Lay Shopping Centre. Please refer here for more information.

SMRT Buses
  • From Monday, 24 March 2025, supplementary bus service 979X will be introduced to provide a faster connection for residents in Yew Tee Village to and from Bukit Panjang MRT / Bus Interchange. Bus service 979X will supplement bus service 979 and serve selected bus stops along its route. It will operate on weekdays (excluding Public Holidays) during the morning and evening peak periods. Please refer here for more information.

Tower Transit
  • From Monday, 24 March 2025, supplementary bus service 861M will be introduced to complement existing travel options to Wellington Primary School. It will operate from Canberra Way, terminating at Sembawang Bus Interchange. This service will operate two trips during the morning peak period on weekdays during school term only. Please refer here for more information.

SBS Transit
  • From Monday, 24 March 2025, short-trip service 112B will be introduced starting from Hougang Central Bus Interchange and terminating at Hougang Avenue 7. This service will only operate on weekdays (excluding public holidays) during the evening peak period. Please refer here for more information.

North South Line
南北线
வடக்கு தெற்கு வரி
NSL Map.png
Train Line Information
Status Operational
Termini Jurong East
Marina South Pier
Stations 27 (1 U/C)
Services 1
Operator(s) SMRT Trains
Rolling stock C151, C651, C751B, C151A, C151B
Line length 45 km
Track gauge 1,435 mm standard gauge
Electrification 750V DC Third rail

North South Line (NSL) is the first Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 65 minutes. The line is currently 45 km long with 27 stations, which includes Canberra station.

History

Date Event
7 November 1987 Yio Chu Kang - Toa Payoh
12 December 1987 Toa Payoh - Raffles Place
20 December 1988 Yishun - Yio Chu Kang
4 November 1989 Raffles Place - Marina Bay
Separation of North South Line and East West Line
10 March 1990 Jurong East - Choa Chu Kang (part of East West Line)
10 February 1996 Choa Chu Kang - Yishun
Jurong East - Choa Chu Kang integrated to North South Line
27 May 2011 Jurong East Modification Project (JEMP) open[1]
23 November 2014 Marina Bay - Marina South Pier[2]
2019 Canberra (Station added on operational line)

Possible future stations

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
colspan=5 style="background-color:Template:Colour/NSL;color:#FFF;"|File:MRTFFF.png North South Line
2
Jurong East Jurong East-NSL-EWL.png Jurong East Terminus
Interchange with East–West Line
1
Bukit Batok Bukit Batok-NSL.png Bukit Batok South
1
Bukit Gombak Bukit Gombak-NSL.png Bukit Batok North
2
Choa Chu Kang Choa Chu Kang-NSL.png Choa Chu Kang Interchange with Bukit Panjang LRT
1
Yew Tee Yew Tee-NSL.png Choa Chu Kang North
1
Kranji Kranji-NSL.png Kranji
1
Marsiling Marsiling-NSL.png Woodlands West
2
Woodlands Woodlands-NSL.png Woodlands Central Future Interchange with Thomson–East Coast Line
1
Admiralty Admiralty-NSL.png Woodlands East
1
Sembawang Sembawang-NSL.png Sembawang
1
Canberra Simpang Under Construction
1
Yishun Yishun-NSL.png Nee Soon North
1
Khatib Khatib-NSL.png Nee Soon South
1
Yio Chu Kang Yio Chu Kang-NSL.png Yio Chu Kang
1
Ang Mo Kio Ang Mo Kio-NSL.png Ang Mo Kio
2
Bishan Bishan-NSL.png Kampong San Teng, San Teng Interchange with Circle Line
1
Braddell Braddell-NSL.png Braddell
1
Toa Payoh Toa Payoh-NSL.png Toa Payoh
1
Novena Novena-NSL.png Thomson
2
Newton Newton-NSL.png Newton Circus Interchange with Downtown Line
2
Orchard Orchard-NSL.png Scotts, Orchard Boulevard Future Interchange with Thomson–East Coast Line
1
Somerset Somerset-NSL.png Killiney
3
Dhoby Ghaut Dhoby Ghaut-NSL.png Dhoby Ghaut Interchange with North East Line and Circle Line
2
City Hall City Hall-NSL-EWL.png Saint Andrew's Interchange with East–West Line
2
Raffles Place Raffles Place-NSL-EWL.png Central Interchange with East–West Line
3
Marina Bay Marina Bay-NSL.png Telok Ayer Basin, Marina South Interchange with Circle Line
Future Interchange with Thomson–East Coast Line
1
Marina South Pier Marina South Pier-NSL.png Marina View, Marina Pier Terminus

Services

Service Starting Terminate at Notes
Full Jurong East Marina South Pier
Full Marina South Pier Jurong East Withdrawal trains will terminate at Platform C instead.
SWT Jurong East Ang Mo Kio Operates during Peak Hours/After Peak Hours
SWT Jurong East Yew Tee Operates during evening peak hours in the event of longer waiting times between Jurong East and Yew Tee.
SWT Marina South Pier Yishun Operates during Peak Hours and late night periods
Special Ang Mo Kio Pasir Ris Operates during morning peak hours in the event of longer waiting times along EWL.

Rolling stock

The rolling stock consists of Kawasaki Heavy Industries C151, Siemens C651, Kawasaki Heavy Industries & Nippon Sharyo C751B, Kawasaki Heavy Industries & CSR Qingdao Sifang C151A and Kawasaki Heavy Industries & CSR Qingdao Sifang C151B trains. These trains operate from two depots along the line, Bishan Depot near Bishan station and Ulu Pandan Depot near Jurong East station.

References

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751C830830C851E951

Former651751B

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah

Template:Railway Lines in Singapore Template:North South Line