Difference between revisions of "East–West Line"

From SgWiki
Jump to navigation Jump to search
m
Line 10: Line 10:
  {{Infoline|Operator(s)|{{SMRT}}}}
  {{Infoline|Operator(s)|{{SMRT}}}}
  {{Infoline|Rolling stock|[[Kawasaki Heavy Industries C151|C151]], [[Siemens C651|C651]], [[Kawasaki Heavy Industries & Nippon Sharyo C751B|C751B]], [[Kawasaki Heavy Industries & CSR Qingdao Sifang C151A|C151A]], [[Kawasaki Heavy Industries & CSR Qingdao Sifang C151B|C151B]], [[Kawasaki Heavy Industries & CRRC Qingdao Sifang C151C|C151C]]}}
  {{Infoline|Rolling stock|[[Kawasaki Heavy Industries C151|C151]], [[Siemens C651|C651]], [[Kawasaki Heavy Industries & Nippon Sharyo C751B|C751B]], [[Kawasaki Heavy Industries & CSR Qingdao Sifang C151A|C151A]], [[Kawasaki Heavy Industries & CSR Qingdao Sifang C151B|C151B]], [[Kawasaki Heavy Industries & CRRC Qingdao Sifang C151C|C151C]]}}
  {{Infoline|Line length|57.2 km}}
  {{Infoline|Line length|55.7 km}}
  {{Infoline|Track gauge|1,435 mm standard gauge}}
  {{Infoline|Track gauge|1,435 mm standard gauge}}
  {{Infoline|Electrification|750V DC Third rail}}
  {{Infoline|Electrification|750V DC Third rail}}
}}
}}


'''East West Line (EWL)''' is the second [[Mass Rapid Transit]] (MRT) line. Traveling from one end to the other takes about 80 minutes. The line is currently 56.7 km long with 35 stations, making it the longest MRT line.
'''East West Line (EWL)''' is the second [[Mass Rapid Transit]] (MRT) line. Traveling from one end to the other takes about 80 minutes. The line is currently 55.7 km long with 35 stations, making it the longest MRT line.


==History==
==History==

Revision as of 16:58, 28 May 2019


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

East West Line
东西线
கிழக்கு மேற்கு வரி
EWL Map.png
Statistics
Status Operational
Termini Pasir Ris
Tuas Link
Changi Airport
Stations 35
Services 2
Operator(s) SMRT Trains
Rolling stock C151, C651, C751B, C151A, C151B, C151C
Line length 55.7 km
Track gauge 1,435 mm standard gauge
Electrification 750V DC Third rail

East West Line (EWL) is the second Mass Rapid Transit (MRT) line. Traveling from one end to the other takes about 80 minutes. The line is currently 55.7 km long with 35 stations, making it the longest MRT line.

History

Date Event
12 December 1987 City Hall - Outram Park
12 March 1988 Outram Park - Clementi
5 November 1988 Clementi - Lakeside
4 November 1989 City Hall - Tanah Merah
Separation of North South Line and East West Line
16 December 1989 Tanah Merah - Pasir Ris
10 March 1990 Jurong East - Choa Chu Kang
6 July 1990 Lakeside - Boon Lay
10 February 1996 Jurong East - Choa Chu Kang became part of North South Line
10 January 2001 Tanah Merah - Expo
18 October 2001 Dover (Station added on operational line)
8 February 2002 Expo - Changi Airport
28 February 2009 Boon Lay - Joo Koon
18 June 2017 Joo Koon - Tuas Link[1]
27 May 2018 Switched from Fixed Block Signaling system to Communication Based Train Control Signalling System.

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:MRTFFF.png East West Line
2
Pasir Ris Pasir Ris-EWL.png Pasir Ris Terminus
Future Interchange with Cross Island Line
2
Tampines Tampines-EWL.png Tampines Interchange with Downtown Line
1
Simei Simei-EWL.png Simei
1
Tanah Merah Tanah Merah-EWL.png Bedok, Changi Terminus (Changi Airport Extension)
1
Bedok Bedok-EWL.png Chai Chee
1
Kembangan Kembangan-EWL.png Frankel
1
Eunos Eunos-EWL.png Eunos
2
Paya Lebar Paya Lebar-EWL.png Paya Lebar Interchange with Circle Line
1
Aljunied Aljunied-EWL.png Aljunied
1
Kallang Kallang-EWL.png Geylang
1
Lavender Lavender-EWL.png Crawford
2
Bugis Bugis-EWL.png Rochore, Victoria Interchange with Downtown Line
2
City Hall City Hall-NSL-EWL.png Saint Andrew's Interchange with North–South Line
2
Raffles Place Raffles Place-NSL-EWL.png Central Interchange with North–South Line
1
Tanjong Pagar Tanjong Pagar-EWL.png Maxwell
3
Outram Park Outram Park-EWL.png Outram Park Interchange with North East Line
Future Interchange with Thomson–East Coast Line
1
Tiong Bahru Tiong Bahru-EWL.png Tiong Bahru
1
Redhill Redhill-EWL.png Alexandra
1
Queenstown Queenstown-EWL.png Princess, Commonwealth
1
Commonwealth Commonwealth-EWL.png Queenstown
2
Buona Vista Buona Vista-EWL.png North Buona Vista Interchange with Circle Line
1
Dover Dover-EWL.png Polytechnic
1
Clementi Clementi-EWL.png Clementi
3
Jurong East Jurong East-NSL-EWL.png Jurong, Jurong Town Interchange with North–South Line
Future Interchange with Jurong Region Line
1
Chinese Garden Chinese Garden-EWL.png Jurong Lake
1
Lakeside Lakeside-EWL.png Corporation
2
Boon Lay Boon Lay-EWL.png Jurong West Future Interchange with Jurong Region Line
1
Pioneer Pioneer-EWL.png Pioneer
1
Joo Koon Joo Koon-EWL.png Joo Koon
1
Gul Circle Gul Circle-EWL.png Tuas
1
Tuas Crescent Tuas Crescent-EWL.png Tuas Crescent
1
Tuas West Road Tuas West Road-EWL.png Tuas West
1
Tuas Link Tuas Link-EWL.png Tuas Link Terminus
File:MRTFFF.png East West Line (Changi Airport Extension)
2
Expo Expo-EWL.png Somapah Interchange with Downtown Line
1
Changi Airport Changi Airport-EWL.png Changi Airport Terminus

Notes:

To differentiate between the Main Line and the Changi Airport Extension, Tanah Merah will have the code of

2

. However, the official code for Tanah Merah remains as (EW4).

Services

Service Starting Terminate at Notes
Full Pasir Ris Tuas Link
Full Tuas Link
Joo Koon
Pasir Ris
Partial Pasir Ris Joo Koon After every Tuas Link bound
Full Tanah Merah Changi Airport
Full Changi Airport Tanah Merah
Special Pasir Ris Yew Tee Operates during evening peak hours in the event of longer waiting times along NSL.

Rolling stock

The rolling stock consists of Kawasaki Heavy Industries C151, Siemens C651, Kawasaki Heavy Industries & Nippon Sharyo C751B, Kawasaki Heavy Industries & CSR Qingdao Sifang C151A, Kawasaki Heavy Industries & CSR Qingdao Sifang C151B and Kawasaki Heavy Industries & CRRC Qingdao Sifang C151C trains. These trains operate from three depots along the line, Ulu Pandan Depot near Jurong East station, Changi Depot near Tanah Merah station and Tuas Depot near Tuas Link station.

References

  1. "Tuas West Extension Opens on 18 June 2017". Land Transport Authority (27 April 2017).
icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail

Template:East West Line