Dhoby Ghaut station

From SgWiki
Revision as of 16:28, 30 December 2022 by Supernutorcrazy (talk | contribs)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

NS24NE6CC1
Dhoby Ghaut
多美歌
டோபி காட்
Dhoby Ghaut-NSL.png
Dhoby Ghaut-NEL.png
Dhoby Ghaut-CCL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address (NSL) 11 Orchard Road
Singapore 238826
Address (NEL) 60 Orchard Road
Singapore 238889
Address (CCL) 13 Orchard Road
Singapore 238893
Line(s) North–South Line
North East Line
Circle Line
Structure Underground
Connections Bus Taxi
Abbreviation DBG

Dhoby Ghaut (NS24/NE6/CC1) is a Mass Rapid Transit (MRT) station on the North–South Line, the North East Line and the Circle Line. It is the largest MRT station in Singapore and the third deepest MRT station with a depth of 28m below ground level.

History

Date Event
12 December 1987 Station officially opened
20 June 2003 Station interchanged with North East Line
8 January 2006 Station involved in Exercise Northstar V (Counter terrorism)[1]
17 April 2010 Station interchanged with Circle Line
26 October 2014 Station involved in Exercise Heartbeat 2014 (Counter terrorism)[2]

2011 train disruption

On 15 December 2011, a train heading northbound had been stuck up by a damaged power rail at about 7pm, causing a train disruption between Bishan and Marina Bay stations. Southbound services resumed as per normal from 9pm, but northbound services were closed for the night for further maintenance works. About 127,000 commuters were affected by this disruption.[3] Later investigation found out that the disruption was caused by a defective fastener in the Third Rail Support Assembly (TRSA) on the northbound track between Dhoby Ghaut and City Hall stations, resulting in the third rail to sag, resulting in the whole segment of track impassable to all trains.[4]

Artworks

  • NE6-Interchange.png
    North East Line: Interchange by Milenko & Delia Prvacki
    As the title suggest, this large-scale artwork represents the interchange between the stations lines that run through Dhoby Ghaut. A marriage of ceramic and mosaic works that span walls, climb columns and sprawl over the station floor, they draw upon the cultural richness and artistic heritage of Singapore and the region, as well as ideas of permanent movement.[5]
  • NE6-Universal Language.png
    North East Line: Universal Language by Sun Yu-Li
    Spread across the station are some 180 pieces of art tiled into the floors and columns. Featuring various sets of prehistoric symbols such as hunters, fishes and birds, acting as wayfinding icons which lead the commuters towards the columns that signify each route of the station. These symbols also come together to form a large floor mural and vibrant mosaic wall panel at the main concourse.[5]
  • CC1-Man and Environment.png
    Circle Line: Man and Environment by Baet Yeok Kuan
    The 36 white gypsum sculptures of ‘Man and Environment’ are spread evenly across three pillars, depicting things such as rocks, plants, textures and wall cracks. These enlarged depictions encourage commuters to be more aware of little details in their surroundings that they fail to notice during their commute.[5]

Layout

L1 Street Level Plaza Singapura
B1 Dhoby Xchange
B2 NSL Concourse Faregates, Ticketing Machines, Passenger Service Centre
NEL Concourse Faregates, Ticketing Machines, Passenger Service Centre
Transfer Linkway between North–South Line Concourse, Circle Line Concourse and Transfer Hall
B3
APlatform NS1Jurong East Service Map
Platform A/B
BPlatform NS28Marina South Pier Service Map
CCL Concourse Passenger Service Centre
Transfer Hall between North East Line Platforms and Transfer Linkway
B4
APlatform CC29HarbourFrontCE2Marina Bay via CC4Promenade Service Map
Platform A/B
BPlatform CC29HarbourFrontCE2Marina Bay via CC4Promenade Service Map
B5
APlatform NE1HarbourFront Service Map
Platform A/B
BPlatform NE17Punggol Service Map

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Handy Road
B Handicapped/disabled access Penang Road
C No Handicapped/disabled access Plaza Singapura, Istana
D No Handicapped/disabled access Plaza Singapura
E Handicapped/disabled access The Atrium@Orchard
F Handicapped/disabled access Oldham Lane, Macdonald House, Orchard Road

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
icon North–South Line
NS1Jurong East 06:07 06:07 06:32 23:57
NS7Kranji 00:13
NS28Marina South Pier 05:52 05:52 06:17 23:51
icon North East Line
NE1HarbourFront 06:06 06:07 06:27 23:52
NE17Punggol 05:54 05:54 06:14 00:05
icon Circle Line
CC29HarbourFront 05:37 05:37 06:05 22:48
CC26Pasir Panjang 23:18
CC23one-north 23:34
CC17Caldecott 00:02
CC11Tai Seng 00:10

Bus

More travel information: Alternative Travel Method
Bus Stop Exit Bus Service
Dhoby Ghaut Stn Exit B icon08031
Penang Rd
B
Dhoby Ghaut Stn icon08057
Orchard Rd
E F
Aft Dhoby Ghaut Stn icon08058
Orchard Rd
E F

References

  1. "Twenty-two agencies in Exercise Northstar V ready for action". Channel NewsAsia (3 January 2006). Archived on 1 October 2007.
  2. "Police conduct anti-terror exercises at Dhoby Ghaut, Downtown MRT stations". TODAY (26 October 2014).
  3. "North-South MRT Line breakdown hits thousands". Channel NewsAsia. Archived on 7 January 2012.
  4. "Release of Report of COI into 15 and 17 December 2011 MRT Disruptions". Ministry of Transport.
  5. 5.0 5.1 5.2 "Art in Transit". Land Transport Authority.
icon North–South Line [ VTE ]
Stations Jurong EastBukit BatokBukit GombakChoa Chu KangYew TeeKranjiMarsilingWoodlandsAdmiraltySembawangCanberraYishunKhatibYio Chu KangAng Mo KioBishanBraddellToa PayohNovenaNewtonOrchardSomersetDhoby GhautCity HallRaffles PlaceMarina BayMarina South Pier
Rolling Stock 151751B151A151B151CR151

Former651

Depots BishanUlu Pandan
Others Bridging Service
icon North East Line [ VTE ]
Stations HarbourFrontOutram ParkChinatownClarke QuayDhoby GhautLittle IndiaFarrer ParkBoon KengPotong PasirWoodleighSerangoonKovanHougangBuangkokSengkangPunggol
North East Line extension: Punggol Coast
Rolling Stock 751A751C851E
Depots Sengkang
Others Bridging Service
icon Circle Line [ VTE ]
Stations Dhoby GhautBras BasahEsplanadePromenadeNicoll HighwayStadiumMountbattenDakotaPaya LebarMacPhersonTai SengBartleySerangoonLorong ChuanBishanMarymountCaldecottBukit BrownBotanic GardensFarrer RoadHolland VillageBuona Vistaone-northKent RidgeHaw Par VillaPasir PanjangLabrador ParkTelok BlangahHarbourFront
CCL6KeppelCantonmentPrince Edward Road
Circle Line ExtensionPromenadeBayfrontMarina Bay
Rolling Stock 830830C851E
Depots Kim Chuan
Others Bridging Service